Sunteți pe pagina 1din 2

Federal Register / Vol. 72, No.

146 / Tuesday, July 31, 2007 / Notices 41721

DEPARTMENT OF ENERGY (866) 208–3676 (toll free). For TTY, call application on July 11, 2007, the NEPA
(202) 502–8659. Pre-Filing Process for this project has
Federal Energy Regulatory ended. From this time forward, Texas
Kimberly D. Bose,
Commission Gas’s proceeding will be conducted in
Secretary. Docket No. CP07–417–000, as noted in
[FR Doc. E7–14735 Filed 7–30–07; 8:45 am] the caption of this Notice.
[Docket No. RP06–200–030]
BILLING CODE 6717–01–P Pursuant to § 157.9 of the
Rockies Express Pipeline LLC; Notice Commission’s rules, 18 CFR 157.9,
of Tariff Filing and Negotiated Rate within 90 days of this Notice the
DEPARTMENT OF ENERGY Commission staff will either: complete
July 20, 2007. its environmental assessment (EA) and
Federal Energy Regulatory place it into the Commission’s public
Take notice that on July 18, 2007, Commission record (eLibrary) for this proceeding, or
Rockies Express Pipeline LLC (REX)
[Docket No. CP07–417–000] issue a Notice of Schedule for
tendered for filing as part of its FERC
Environmental Review. If a Notice of
Gas Tariff, the following tariff sheets, to Texas Gas Transmission, LLC; Notice Schedule for Environmental Review is
be effective July 19, 2007: of Application issued, it will indicate, among other
Twenty-Fifth Revised Sheet No. 22 milestones, the anticipated date for the
July 20, 2007.
Twelfth Revised Sheet No. 24 Commission staff’s issuance of the final
Second Revised Sheet No. 24A
Take notice that on July 11, 2007, environmental impact statement (FEIS)
Texas Gas Transmission, LLC (Texas or EA for this proposal. The filing of the
Any person desiring to intervene or to Gas), 3800 Frederica Street, Owensboro, EA in the Commission’s public record
protest this filing must file in Kentucky 42301, filed an application for this proceeding or the issuance of a
accordance with Rules 211 and 214 of pursuant to section 7(c) of the Natural Notice of Schedule for Environmental
the Commission’s Rules of Practice and Gas Act for a certificate of public Review will serve to notify federal and
Procedure (18 CFR 385.211 and convenience and necessity to construct, state agencies of the timing for the
385.214). Protests will be considered by own, operate and maintain completion of all necessary reviews, and
the Commission in determining the approximately 262.6 miles of 36-inch the subsequent need to complete all
appropriate action to be taken, but will diameter pipeline consisting of two federal authorizations within 90 days of
not serve to make protestants parties to laterals, one primarily in Arkansas the date of issuance of the Commission
the proceeding. Any person wishing to (Fayetteville Lateral) and the other in staff’s FEIS or EA.
become a party must file a notice of Mississippi (Greenville Lateral); one There are two ways to become
10,650 horsepower compressor station; involved in the Commission’s review of
intervention or motion to intervene, as
certain piping modifications; and this project. First, any person wishing to
appropriate. Such notices, motions, or
certain ancillary facilities. In addition, obtain legal status by becoming a party
protests must be filed in accordance
Texas Gas is seeking authority to to the proceedings for this project
with the provisions of Section 154.210
implement initial separate incremental should, on or before the below listed
of the Commission’s regulations (18 CFR rates for the Fayetteville Lateral and the
154.210). Anyone filing an intervention comment date, file with the Federal
Greenville Lateral, all as more fully set Energy Regulatory Commission, 888
or protest must serve a copy of that forth in the application which is on file First Street, NE., Washington, DC 20426,
document on the Applicant. Anyone with the Commission and open for a motion to intervene in accordance
filing an intervention or protest on or public inspection. This filing is with the requirements of the
before the intervention or protest date available for review at the Commission Commission’s Rules of Practice and
need not serve motions to intervene or in the Public Reference Room or may be Procedure (18 CFR 385.214 or 385.211)
protests on persons other than the viewed on the Commission’s Web site at and the Regulations under the NGA (18
Applicant. http://www.ferc.gov using the CFR 157.10). A person obtaining party
The Commission encourages ‘‘eLibrary’’ link. Enter the docket status will be placed on the service list
electronic submission of protests and number excluding the last three digits in maintained by the Secretary of the
interventions in lieu of paper using the the docket number field to access the Commission and will receive copies of
‘‘eFiling’’ link at http://www.ferc.gov. document. For assistance, please contact all documents filed by the applicant and
Persons unable to file electronically FERC Online Support at by all other parties. A party must submit
should submit an original and 14 copies FERCOnlineSupport@ferc.gov or toll 14 copies of filings made with the
of the protest or intervention to the free at (866) 208–3676, or for TTY, Commission and must mail a copy to
Federal Energy Regulatory Commission, contact (202) 502–8659. the applicant and to every other party in
888 First Street, NE., Washington, DC Any questions regarding this the proceeding. Only parties to the
20426. Application should be directed to Kathy proceeding can ask for court review of
D. Fort, Manager of Certificates and Commission orders in the proceeding.
This filing is accessible on-line at Tariffs, Texas Gas Transmission, LLC, However, a person does not have to
http://www.ferc.gov, using the 3800 Frederica Street, Owensboro, intervene in order to have comments
‘‘eLibrary’’ link and is available for Kentucky 42301 or by telephone at 270– considered. The second way to
review in the Commission’s Public 688–6825 or fax at 270–688–5871. participate is by filing with the
Reference Room in Washington, DC. On December 28, 2006, the Secretary of the Commission, as soon as
There is an ‘‘eSubscription’’ link on the Commission staff granted Texas Gas’s possible, an original and two copies of
Web site that enables subscribers to request to utilize the National comments in support of or in opposition
rmajette on PROD1PC64 with NOTICES

receive e-mail notification when a Environmental Policy Act (NEPA) Pre- to this project. The Commission will
document is added to a subscribed Filing Process and assigned Docket No. consider these comments in
docket(s). For assistance with any FERC PF07–2–000 to staff activities involving determining the appropriate action to be
Online service, please e-mail the Texas Gas’s expansion project. Now, taken, but the filing of a comment alone
FERCOnlineSupport@ferc.gov, or call as of the filing of Texas Gas’s will not serve to make the filer a party

VerDate Aug<31>2005 15:11 Jul 30, 2007 Jkt 211001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\31JYN1.SGM 31JYN1
41722 Federal Register / Vol. 72, No. 146 / Tuesday, July 31, 2007 / Notices

to the proceeding. The Commission’s blanket approval under 18 CFR Part 34 ‘‘e-Filing’’ link. The Commission
rules require that persons filing of all future issuances of securities and strongly encourages electronic filings.
comments in opposition to the project assumptions of liability by Tiverton
Kimberly D. Bose,
provide copies of their protests only to Power and Rumford Power.
Secretary.
the party or parties directly involved in On July 18, 2007, pursuant to
the protest. [FR Doc. E7–14764 Filed 7–30–07; 8:45 am]
delegated authority, the Director, BILLING CODE 6717–01–P
Persons who wish to comment only Division of Tariffs and Market
on the environmental review of this Development—West, granted the
project should submit an original and requests for blanket approval under Part
two copies of their comments to the DEPARTMENT OF ENERGY
34 (Director’s Order). The Director’s
Secretary of the Commission. Order also stated that the Commission Federal Energy Regulatory
Environmental commenters will be would publish a separate notice in the Commission
placed on the Commission’s Federal Register establishing a period of
environmental mailing list, will receive [Docket No. RP07–530–000]
time for the filing of protests.
copies of the environmental documents,
Accordingly, any person desiring to be Viking Gas Transmission Company;
and will be notified of meetings
heard concerning the blanket approvals Notice of Proposed Changes in FERC
associated with the Commission’s
of issuances of securities or assumptions Gas Tariff
environmental review process.
of liability by Tiverton Power and
Environmental commenters will not be July 20, 2007.
Rumford Power should file a protest
required to serve copies of filed Take notice that on July 17, 2007,
with the Federal Energy Regulatory
documents on all other parties. Viking Gas Transmission Company
Commission, 888 First Street, NE.,
However, the non-party commenters (Viking) tendered for filing to become
Washington, DC 20426, in accordance
will not receive copies of all documents part of its FERC Gas Tariff, First Revised
with Rules 211 and 214 of the
filed by other parties or issued by the Volume No. 1, the following tariff sheets
Commission (except for the mailing of Commission’s Rules of Practice and
to become effective on August 17, 2007:
environmental documents issued by the Procedure. 18 CFR 385.211, 385.214
(2004). Eighth Revised Sheet No. 97A
Commission) and will not have the right First Revised Sheet No. 97B
to seek court review of the Notice is hereby given that the
Commission’s final order. deadline for filing protests is August 17, Viking states that the purpose of this
Motions to intervene, protests and 2007. filing is to modify the pro forma Firm
comments may be filed electronically Transportation Agreement Exhibits to
Absent a request to be heard in standardize documentation of
via the Internet in lieu of paper; see 18 opposition to such blanket approvals by discounted rate agreements and
CFR 385.2001(a)(1)(iii) and the the deadline above, Tiverton Power and negotiated rate agreements. The
instructions on the Commission’s Web Rumford Power are authorized to issue proposed changes to Rate Schedule FT–
site under the ‘‘e-Filing’’ link. The securities and assume obligations or A’s form of Firm Transportation
Commission strongly encourages liabilities as a guarantor, indorser, Agreement will enhance efficiency and
electronic filings. surety, or otherwise in respect of any make more routine the memorialization
Comment Date: August 13, 2007. security of another person; provided of agreements including negotiated rate
Kimberly D. Bose, that such issuance or assumption is for agreements and discount rate
Secretary. some lawful object within the corporate agreements within the parameters
[FR Doc. E7–14732 Filed 7–30–07; 8:45 am] purposes of Tiverton Power and established by the companion
BILLING CODE 6717–01–P
Rumford Power, compatible with the provisions of Viking’s tariff.
public interest, and is reasonably Any person desiring to intervene or to
necessary or appropriate for such protest this filing must file in
DEPARTMENT OF ENERGY purposes. accordance with Rules 211 and 214 of
The Commission reserves the right to the Commission’s Rules of Practice and
Federal Energy Regulatory require a further showing that neither Procedure (18 CFR 385.211 and
Commission public nor private interests will be 385.214). Protests will be considered by
adversely affected by continued the Commission in determining the
[Docket No. ER07–936–000, Docket No.
ER07–958–000] approvals of Tiverton Power’s and appropriate action to be taken, but will
Rumford Power’s Rissuance of securities not serve to make protestants parties to
Tiverton Power, LLC, Rumford Power, the proceeding. Any person wishing to
or assumptions of liability.
LLC; Notice of Issuance of Order become a party must file a notice of
Copies of the full text of the Director’s intervention or motion to intervene, as
July 24, 2007. Order are available from the appropriate. Such notices, motions, or
Tiverton Power, LLC (Tiverton Power) Commission’s Public Reference Room, protests must be filed in accordance
and Rumford Power, LLC (Rumford 888 First Street, NE., Washington, DC with the provisions of § 154.210 of the
Power) filed an application for market- 20426. The Order may also be viewed Commission’s regulations (18 CFR
based rate authority, with an on the Commission’s Web site at 154.210). Anyone filing an intervention
accompanying rate schedule. The http://www.ferc.gov, using the eLibrary or protest must serve a copy of that
proposed market-based rate schedule link. Enter the docket number excluding document on the Applicant. Anyone
provides for the sale of energy, capacity the last three digits in the docket filing an intervention or protest on or
and ancillary services at market-based number filed to access the document. before the intervention or protest date
rmajette on PROD1PC64 with NOTICES

rates. Tiverton Power and Rumford Comments, protests, and interventions need not serve motions to intervene or
Power also requested waivers of various may be filed electronically via the protests on persons other than the
Commission regulations. In particular, internet in lieu of paper. See, 18 CFR Applicant.
Tiverton Power and Rumford Power 385.2001(a)(1)(iii) and the instructions The Commission encourages
requested that the Commission grant on the Commission’s Web site under the electronic submission of protests and

VerDate Aug<31>2005 15:11 Jul 30, 2007 Jkt 211001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\31JYN1.SGM 31JYN1

S-ar putea să vă placă și