Sunteți pe pagina 1din 2

Federal Register / Vol. 72, No.

133 / Thursday, July 12, 2007 / Notices 38073

with Rules 211 and 214 of the and revisions to the electric power rates DEPARTMENT OF ENERGY
Commission’s Rules of Practice and for system transportation customers.
Procedure. 18 CFR 385.211, 385.214 Transco states that this filing is being Federal Energy Regulatory
(2004). made pursuant to the Commission’s Commission
Notice is hereby given that the Order Denying Rehearing and Accepting
deadline for filing protests is August 1, [Docket No. QF07–198–000]
Compliance Filings in Docket No.
2007. RP01–245–019, et al. issued June 7, Warm Springs Biomass Project, LLC;
Absent a request to be heard in 2007. The proposed effective date of the Notice of Filing of Notice of Self-
opposition to such blanket approvals by tariff sheets is August 1, 2007. Certification of Qualifying Status of a
the deadline above, Saracen Energy is
Any person desiring to protest this Small Power Production Facility and
authorized to issue securities and
filing must file in accordance with Rule Cogeneration Facility
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise 211 of the Commission’s Rules of July 5, 2007.
in respect of any security of another Practice and Procedure (18 CFR Take notice that on July 2, 2007,
person; provided that such issuance or 385.211). Protests to this filing will be Warm Springs Biomass Project, LLC
assumption is for some lawful object considered by the Commission in (Warm Springs Biomass) filed with the
within the corporate purposes of determining the appropriate action to be Commission a notice of self-certification
Saracen Energy, compatible with the taken, but will not serve to make of a facility as a qualifying small power
public interest, and is reasonably protestants parties to the proceeding. production facility and cogeneration
necessary or appropriate for such Such protests must be filed in facility pursuant to 18 CFR 292.207(a) of
purposes. accordance with the provisions of the Commission’s regulations.
The Commission reserves the right to Section 154.210 of the Commission’s Warm Springs Biomass will construct,
require a further showing that neither regulations (18 CFR 154.210). Anyone own, and operate an approximately 20
public nor private interests will be filing a protest must serve a copy of that MW cogeneration facility using biomass
adversely affected by continued document on all the parties to the as fuel. The two biomass-fueled steam
approvals of Saracen Energy’s issuance proceeding. boilers will produce steam that will be
of securities or assumptions of liability. directed to the steam turbine generator.
Copies of the full text of the Director’s The Commission encourages
electronic submission of protests in lieu Up to 60,000 pounds per hour of steam
Order are available from the will be extracted at 75 psi to operate
Commission’s Public Reference Room, of paper using the ‘‘eFiling’’ link at
lumber dry kilns. The remaining portion
888 First Street, NE., Washington, DC http://www.ferc.gov. Persons unable to
of the steam will run through the entire
20426. The Order may also be viewed file electronically should submit an
steam turbine and condensed to
on the Commission’s Web site at original and 14 copies of the protest to produce power. The facility will be
http://www.ferc.gov, using the eLibrary the Federal Energy Regulatory located on reservation of the
link. Enter the docket number excluding Commission, 888 First Street, NE., Confederated tribes of Warm Springs
the last three digits in the docket Washington, DC 20426. Indian Reservation of Oregon in
number filed to access the document. This filing is accessible on-line at Jefferson County, Oregon.
Comments, protests, and interventions http://www.ferc.gov, using the The facility will interconnect with the
may be filed electronically via the ‘‘eLibrary’’ link and is available for transmission system of Warm Springs
Internet in lieu of paper. See, 18 CFR review in the Commission’s Public Power and Water Enterprises and sell
385.2001(a)(1)(iii) and the instructions Reference Room in Washington, DC. electric energy to Portland General
on the Commission’s Web site under the Electric Company. The facility will
There is an ‘‘eSubscription’’ link on the
‘‘e-Filing’’ link. The Commission purchase supplementary, standby, back-
Web site that enables subscribers to
strongly encourages electronic filings. up and maintenance power from
receive e-mail notification when a
Kimberly D. Bose, document is added to a subscribed PacificCorp.
Secretary. docket(s). For assistance with any FERC A notice of self-certification does not
[FR Doc. E7–13522 Filed 7–11–07; 8:45 am] Online service, please e-mail institute a proceeding regarding
FERCOnlineSupport@ferc.gov, or call qualifying facility status; a notice of self-
BILLING CODE 6717–01–P
certification [or self-recertification]
(866) 208–3676 (toll free). For TTY, call
provides notice that the entity making
(202) 502–8659.
DEPARTMENT OF ENERGY filing has determined the facility meets
Kimberly D. Bose, the applicable criteria to be a qualifying
Federal Energy Regulatory Secretary. facility. Any person seeking to challenge
Commission [FR Doc. E7–13516 Filed 7–11–07; 8:45 am] such qualifying facility status may do so
by filing a motion pursuant to 18 CFR
[Docket Nos. RP01–245–023, RP06–569–002 BILLING CODE 6717–01–P
292.207(d)(iii).
and RP07–338–001]
This filing is accessible on-line at
Transcontinental Gas Pipe Line http://www.ferc.gov, using the
Corporation; Notice of Compliance ‘‘eLibrary’’ link and is available for
Filing review in the Commission’s Public
Reference Room in Washington, DC.
July 5, 2007. There is an ‘‘eSubscription’’ link on the
Take notice that on June 29, 2007, Web site that enables subscribers to
rwilkins on PROD1PC63 with NOTICES

Transcontinental Gas Pipe Line receive e-mail notification when a


Corporation (Transco) tendered for document is added to a subscribed
filing tariff sheets reflecting incremental docket(s). For assistance with any FERC
electric power rate surcharge for Online service, please e-mail
Cherokee Expansion Service customers FERCOnlineSupport@ferc.gov, or call

VerDate Aug<31>2005 16:42 Jul 11, 2007 Jkt 211001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\12JYN1.SGM 12JYN1
38074 Federal Register / Vol. 72, No. 133 / Thursday, July 12, 2007 / Notices

(866) 208–3676 (toll free). For TTY, call England Generation, Inc.; WPS Docket Numbers: ER02–1785–011.
(202) 502–8659. Westwood Generation, LLC; Advantage Applicants: Thermo Cogeneration
Energy, Inc.; Upper Peninsula Power Partnership LP.
Kimberly D. Bose,
Company; Peoples Energy Services Description: Notice of non-material
Secretary. Corporation change in status of Thermo
[FR Doc. E7–13512 Filed 7–11–07; 8:45 am] Description: Integrys Energy Group, Cogeneration Partnership, L.P.
BILLING CODE 6717–01–P Inc submits Notice of Change in Status Filed Date: 06/29/2007.
as set forth in the Commission’s Order Accession Number: 20070629–5028.
652. Comment Date: 5 p.m. Eastern Time
DEPARTMENT OF ENERGY Filed Date: 06/28/2007. on Friday, July 20, 2007.
Accession Number: 20070702–0264. Docket Numbers: ER04–698–004.
Federal Energy Regulatory Comment Date: 5 p.m. Eastern Time
Commission Applicants: Tor Power, LLC.
on Thursday, July 19, 2007. Description: Tor Power, LLC submits
Combined Notice of Filings #1 Docket Numbers: ER98–3564–000. its Updated Market Power Analysis
Applicants: FPL Energy Wyman IV Report.
July 3, 2007. LLC. Filed Date: 06/28/2007.
Take notice that the Commission Description: Change in Material Facts Accession Number: 20070628–5007.
received the following exempt of FPL Energy Wyman IV LLC. Comment Date: 5 p.m. Eastern Time
wholesale generator filings: Filed Date: 06/29/2007. on Thursday, July 19, 2007.
Docket Numbers: EG07–61–000. Accession Number: 20070629–5022. Docket Numbers: ER05–1065–010.
Applicants: Warm Springs Biomass Comment Date: 5 p.m. Eastern Time Applicants: Entergy Services, Inc.
Project, LLC. on Friday, July 20, 2007. Description: Entergy Operating
Description: Notice of Self- Docket Numbers: ER99–705–004. Companies submits its compliance
Certification of Exempt Wholesale Applicants: Golden Spread Electric filing.
Generator Status of Warm Springs Cooperative, Inc. Filed Date: 06/25/2007.
Biomass Project, LLC. Description: Notice of Change in Accession Number: 20070627–0102.
Filed Date: 06/26/2007. Status of Golden Spread Electric Comment Date: 5 p.m. Eastern Time
Accession Number: 20070625–5079. Cooperative, Inc. on Monday, July 16, 2007.
Comment Date: 5 p.m. Eastern Time Filed Date: 06/29/2007.
Docket Numbers: ER07–127–003.
on Tuesday, July 17, 2007. Accession Number: 20070629–5045.
Applicants: California Independent
Comment Date: 5 p.m. Eastern Time
Docket Numbers: EG07–62–000. System Operator Corporation.
on Friday, July 20, 2007.
Applicants: Peetz Table Wind Energy, Description: California Independent
LLC. Docket Numbers: ER01–2569–005; System Operator Corporation submits
Description: Notice of Self- ER98–4652–005; ER02–1175–004; Second Revised Sheet 163 et al to FERC
Certification of Exempt Wholesale ER01–2568–003. Electric Tariff, Third Replacement
Generator Status of Peetz Table Wind Applicants: Boralex Livemore Falls Volume 1 pursuant to Section 205 of the
Energy, LLC. Inc.; Boralex Stratton Energy LP; Federal Power Act etc.
Filed Date: 06/27/2007. Boralex Ft. Fairfield LP; Boralex Filed Date: 06/27/2007.
Accession Number: 20070627–5012. Ashland LP. Accession Number: 20070629–0069.
Description: Triennial Compliance Comment Date: 5 p.m. Eastern Time
Comment Date: 5 p.m. Eastern Time
Filing of Boralex Industries Inc. on Wednesday, July 18, 2007.
on Wednesday, July 18, 2007.
Filed Date: 06/29/2007.
Docket Numbers: EG07–63–000. Accession Number: 20070629–5023. Docket Numbers: ER07–282–001.
Applicants: NRG Texas Power LLC. Comment Date: 5 p.m. Eastern Time Applicants: Southwest Power Pool,
Description: NRG Texas Power, LLC on Friday, July 20, 2007. Inc.
submits its Notice of Self-Certification Description: Southwest Power Pool,
Docket Numbers: ER02–999–005;
of Exempt Wholesale Generator Status. Inc. submits its executed service
ER97–2463–005; ER05–320–003; ER97–
Filed Date: 06/28/2007. agreement for Firm Point-to-Point
2460–008.
Accession Number: 20070702–0260. Transmission Service with Kansas
Applicants: Fitchburg Gas and
Comment Date: 5 p.m. Eastern Time Power Pool, & revised agreement for
Electric Light Company; Unitil Energy
on Thursday, July 19, 2007. firm Point-to-Point Transmission
Systems, Inc.; Unitil Power Corporation.
Take notice that the Commission Description: Change in Status of Service w/Kansas Municipal Energy
received the following electric rate Fitchburg Gas and Electric Light Agency.
filings: Filed Date: 06/27/2007.
Company, Unitil Power Corp. and Unitil
Docket Numbers: ER95–1528–017; Accession Number: 20070629–0067.
Energy Systems, Inc.
ER96–1088–044; ER01–2659–011; Comment Date: 5 p.m. Eastern Time
Filed Date: 06/29/2007.
ER02–2199–009; ER03–54–009; ER03– Accession Number: 20070629–5066. on Wednesday, July 18, 2007.
56–009; ER96–1858–022; ER03–674– Comment Date: 5 p.m. Eastern Time Docket Numbers: ER07–285–001.
011; ER99–1936–010; ER01–1114–010; on Friday, July 20, 2007. Applicants: New York Independent
ER97–2758–017; ER05–89–010; ER01– Docket Numbers: ER02–1437–003. System Operator, Inc.
2306–003. Applicants: Triton Power Michigan Description: NYISO submits an
Applicants: Wisconsin Public Service LLC. informational report on efforts to
Corporation; WPS Power Development, Description: Notice of non-material finalize permanent market rules for
LLC, and WPS Energy Services, Inc.; change in status of Triton Power intermittent suppliers.
rwilkins on PROD1PC63 with NOTICES

Combined Locks Energy Center, LLC; Michigan LLC. Filed Date: 06/28/2007.
WPS Empire State, Inc.; WPS Beaver Filed Date: 06/29/2007. Accession Number: 20070628–5011.
Falls Generation, LLC; Mid-American Accession Number: 20070629–5017. Comment Date: 5 p.m. Eastern Time
Power, LLC; Quest Energy, LLC; WPS Comment Date: 5 p.m. Eastern Time on Thursday, July 19, 2007.
Canada Generation, Inc. and WPS New on Friday, July 20, 2007. Docket Numbers: ER07–361–003.

VerDate Aug<31>2005 16:42 Jul 11, 2007 Jkt 211001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\12JYN1.SGM 12JYN1

S-ar putea să vă placă și