Sunteți pe pagina 1din 1

37798 Federal Register / Vol. 72, No.

132 / Wednesday, July 11, 2007 / Notices

(b) The New Source Performance The Consent Decree may be examined and the remaining settling defendants to
Standards (‘‘NSPS’’) provisions of the at the Office of the United States pay their allocated share of the costs to
Act, 42 U.S.C. 7411; Attorney, Eastern District of Kentucky, implement the remedy, including EPA
(c) Title V of the Act, 42 U.S.C. 7661 260 West Vine Street, Suite 300, oversight costs. The work to be
et seq.; and Lexington, Kentucky, 40507–1612, and performed by the settling defendants at
(d) The federally-enforceable State at U.S. EPA Region IV, 61 Forsyth OU3 is expected cost about $1.12
Implementation Plan (‘‘SIP’’) developed Street, SW., Atlanta, Georgia, 30303– million.
by the Commonwealth of Kentucky. 8960. During the public comment
EKPC operates three coal-fired power period, the Consent Decree may also be The Department of Justice will receive
plants in Kentucky: The Spurlock Plant, examined on the following Department for a period of thirty (30) days from the
located near Maysville, Kentucky, the of Justice Web site, http:// date of this publication comments
Dale Plant, located near Winchester, www.usdoj.gov/enrd/ relating to the Decree. Comments should
Kentucky, and the Cooper Plant, located Constent_Decrees.html. A copy of the be addressed to the Assistant Attorney
near Somerset, Kentucky. The Consent Decree may also be obtained by General, Environmental and Natural
complaint filed by the United States mail from the Consent Decree Library, Resources Division, and either e-mailed
alleges that EKPC modified Spurlock P.O. Box 7611, U.S. Department of to pubcomment-ees.enrd@usdoj. gov or
Unit 2 and Dale Units 3 and 4 without Justice, Washington, DC 20044–7611 or mailed to P.O. Box 7611, U.S.
complying with PSD (including the by faxing or e-mailing a request to Tonia Department of Justice, Washington, DC
requirements to first obtain a PSD Fleetwood (tonia.fleetwood@usdoj.gov), 20044–7611, and should refer to United
permit authorizing the modifications fax no. (202) 514–0097, phone States v. Findett Real Estate Corp., et al.,
and to install and operate the best confirmation number (202) 514–1547. In Civil Action No. 07–1215 (E.D.
available technology to control requesting a copy from the Consent Missouri), D.J. Ref. 90–11–2–417/2.
emissions of sulfur dioxide (‘‘SO2’’), Decree Library, please enclose a check
nitrogen oxides (‘‘NOx’’), and/or in the amount of $18.50 (25 cents per The Decree may be examined at the
particulate matter (‘‘PM’’)), and page reproduction cost) payable to the Office of the United States Attorney,
modified Dale Units 3 and 4 without U.S. Treasury or, if by e-mail or fax, Eastern District of Missouri, 111 S. 10th
complying the NSPS. The Complaint forward a check in that amount to the Street, 20th Floor, St. Louis, Missouri
also alleges that EKPC violated Title V Consent Decree Library at the stated 63102, and at U.S. EPA Region VII, 901
of the Act by failing to include the PSD address. N. 5th Street, Kansas City, Kansas
and NSPS requirement triggered by its 66101. During the public comment
modifications in its Title V operating W. Benjamin Fisherow,
period, the Decree, may also be
permits for the Spurlock and Dale Deputy Chief, Environmental Enforcement
Section, Environment and Natural Resources
examined on the following Department
plants. Finally, the Complaint alleges of Justice Web site, http://
that EKPC illegally operated Spurlock Division.
[FR Doc. 07–3368 Filed 7–10–07; 8:45 am] www.usdoj.gov/enrd/
Unit 2 at heat input capacities that were Consent_Decrees.html. A copy of the
higher than allowed by its operating BILLING CODE 4410–15–M
Decree may also be obtained by mail
permit.
The proposed Consent Decree would from the Consent Decree Library, P.O.
require EKPC to reduce SO2, NOx and DEPARTMENT OF JUSTICE Box 7611, U.S. Department of Justice,
PM emissions at its plants through the Washington, DC 20044–7611 or by
Notice of Lodging of Consent Decree faxing or e-mailing a request to Tonia
installation and operation of state-of-
Under the Comprehensive Fleetwood (tonia.fleetwood@usdoj.gov),
the-art pollution control technologies
Environmental Response, fax no. (202) 514–0097, phone
and/or the retirement or re-powering of
Compensation, and Liability Act confirmation number (202) 514–1547. In
certain units. In addition, the proposed
Consent Decree would require EKPC to Notice is hereby given that on July 3, requesting a copy from the Consent
install and operate wet electrostatic 2007, a proposed Remedial Design/ Decree Library, please enclose a check
precipitators at its Spurlock Plant, Remedial Action Consent Decree in the amount of $50.50 (25 cents per
which are designed to control sulfuric (‘‘Decree’’) in United States v. Findett page reproduction cost) payable to the
acid mist from coal-fired power plants, Real Estate Corp., et al., Civil Action U.S. Treasury or, if by email or fax,
as a means of mitigating the harm No. 07–1215 was lodged with the forward a check in that amount to the
caused by the alleged violations. United States District Court for the Consent Decree Library at the stated
Finally, the proposed Consent Decree Eastern District of Missouri. address. In requesting a copy exclusive
would require EKPC to pay a $750,000 The Decree resolves claims of the of exhibits and defendants’ signatures,
civil penalty. United States and the State of Missouri please enclose a check in the amount of
The Department of Justice will receive against the settling defendants brought $12.00 (25 cents per page reproduction
for a period of thirty (30) days from the under the Comprehensive cost) payable to the U.S. Treasury.
date of this publication comments Environmental Response, Compensation
relating to the Consent Decree. and Liability Act of 1980, (‘‘CERCLA’’), Robert E. Maher, Jr.,
Comments should be addressed to the 42 U.S.C. 9601 et seq., for declaratory Assistant Chief, Environmental Enforcement
Assistant Attorney General, relief, injunctive relief, and recovery of Section, Environment and Natural Resources
Environmental and Natural Resources response costs incurred and to be Division.
Division, and either e-mailed to incurred by the United States in [FR Doc. 07–3367 Filed 7–10–07; 8:45 am]
pubcomment-ees.enrd@usdoj.gov or connection with the release of BILLING CODE 4410–15–M
mailed to P.O. Box 7611, U.S. hazardous substances at operable unit 3
jlentini on PROD1PC65 with NOTICES

Department of Justice, Washington, DC (‘‘OU3’’) of the Hayford Bridge Road


20044–7611, and should refer to United Groundwater Site located in St. Charles,
States v. East Kentucky Power Missouri (‘‘Site’’). The Decree requires
Cooperative, D.J. Ref. No. 90–5–2–1– six of the settling defendants to perform
08085. the remedy selected by EPA for OU3

VerDate Aug<31>2005 17:56 Jul 10, 2007 Jkt 211001 PO 00000 Frm 00100 Fmt 4703 Sfmt 4703 E:\FR\FM\11JYN1.SGM 11JYN1