Sunteți pe pagina 1din 2

Federal Register / Vol. 72, No.

125 / Friday, June 29, 2007 / Notices 35703

(866) 208–3676 (toll free). For TTY, call capacity at market-based rates. Fulcrum ‘‘e-Filing’’ link. The Commission
(202) 502–8659. also requested waivers of various strongly encourages electronic filings.
Commission regulations. In particular,
Kimberly D. Bose, Kimberly D. Bose,
Fulcrum requested that the Commission
Secretary. Secretary.
grant blanket approval under 18 CFR
[FR Doc. E7–12613 Filed 6–28–07; 8:45 am] Part 34 of all future issuances of [FR Doc. E7–12616 Filed 6–28–07; 8:45 am]
BILLING CODE 6717–01–P securities and assumptions of liability BILLING CODE 6717–01–P

by Fulcrum.
DEPARTMENT OF ENERGY On June 19, 2007, pursuant to DEPARTMENT OF ENERGY
delegated authority, the Director,
Federal Energy Regulatory Division of Tariffs and Market Federal Energy Regulatory
Commission Development—West, granted the Commission
[Project No. 2242–078—Oregon] requests for blanket approval under Part [Docket No. ER07–874–000]
34 (Director’s Order). The Director’s
Eugene Water and Electric Board; Order also stated that the Commission Rainbow Energy Ventures LLC; Notice
Notice of Designation of Certain would publish a separate notice in the of Issuance of Order
Commission Personnel as Non- Federal Register establishing a period of
Decisional time for the filing of protests. June 22, 2007.
Accordingly, any person desiring to be Rainbow Energy Ventures LLC
June 22, 2007. heard concerning the blanket approvals (Rainbow Ventures) filed an application
Commission staff member James of issuances of securities or assumptions for market-based rate authority, with an
Hastreiter (Office of Energy Projects of liability by Fulcrum should file a accompanying rate schedule. The
503–552–2760; protest with the Federal Energy proposed market-based rate schedule
james.hastreiter@ferc.gov) is assigned to Regulatory Commission, 888 First provides for the sale of energy, capacity
help resolve environmental and other Street, NE., Washington, DC 20426, in and ancillary services at market-based
issues associated with development of a accordance with Rules 211 and 214 of rates. Rainbow Ventures also requested
settlement agreement for the Carmen- the Commission’s Rules of Practice and waivers of various Commission
Smith Project. Procedure. 18 CFR 385.211, 385.214 regulations. In particular, Rainbow
As ‘‘non-decisional’’ staff, Mr. (2004). Ventures requested that the Commission
Hastreiter will not participate in an grant blanket approval under 18 CFR
advisory capacity in the Commission’s Notice is hereby given that the Part 34 of all future issuances of
review of any offer of settlement or deadline for filing protests is July 19, securities and assumptions of liability
settlement agreement, or deliberations 2007. by Rainbow Ventures.
concerning the disposition of the Absent a request to be heard in On June 19, 2007, pursuant to
relicense application. opposition to such blanket approvals by delegated authority, the Director,
Different Commission ‘‘advisory staff’’ the deadline above, Fulcrum is Division of Tariffs and Market
will be assigned to review any offer of authorized to issue securities and Development—West, granted the
settlement or settlement agreement, and assume obligations or liabilities as a requests for blanket approval under Part
to process the relicense application, guarantor, indorser, surety, or otherwise 34 (Director’s Order). The Director’s
including providing advice to the in respect of any security of another Order also stated that the Commission
Commission with respect to the person; provided that such issuance or would publish a separate notice in the
agreement and the application. Non- assumption is for some lawful object Federal Register establishing a period of
decisional staff and advisory staff are within the corporate purposes of time for the filing of protests.
prohibited from communicating with Fulcrum, compatible with the public Accordingly, any person desiring to be
one another concerning the settlement interest, and is reasonably necessary or heard concerning the blanket approvals
and the relicense application. appropriate for such purposes. of issuances of securities or assumptions
Kimberly D. Bose, The Commission reserves the right to of liability by Rainbow Ventures should
Secretary. require a further showing that neither file a protest with the Federal Energy
public nor private interests will be Regulatory Commission, 888 First
[FR Doc. E7–12617 Filed 6–28–07; 8:45 am]
adversely affected by continued Street, NE., Washington, DC 20426, in
BILLING CODE 6717–01–P
approvals of Fulcrums’ issuance of accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
securities or assumptions of liability.
DEPARTMENT OF ENERGY Procedure. 18 CFR 385.211, 385.214
Copies of the full text of the Director’s (2004).
Federal Energy Regulatory Order are available from the Notice is hereby given that the
Commission Commission’s Public Reference Room, deadline for filing protests is July 19,
888 First Street, NE., Washington, DC 2007.
[Docket Nos. ER07–761–000 and ER07–761– 20426. The Order may also be viewed Absent a request to be heard in
001] on the Commission’s Web site at opposition to such blanket approvals by
http://www.ferc.gov, using the eLibrary the deadline above, Rainbow Ventures
Fulcrum Energy Limited; Notice of
link. Enter the docket number excluding is authorized to issue securities and
Issuance of Order
the last three digits in the docket assume obligations or liabilities as a
mstockstill on PROD1PC66 with NOTICES

June 22, 2007. number filed to access the document. guarantor, indorser, surety, or otherwise
Fulcrum Energy Limited (Fulcrum) Comments, protests, and interventions in respect of any security of another
filed an application for market-based may be filed electronically via the person; provided that such issuance or
rate authority, with an accompanying Internet in lieu of paper. See, 18 CFR assumption is for some lawful object
tariff. The proposed market-based rate 385.2001(a)(1)(iii) and the instructions within the corporate purposes of
tariff provides for the sale of energy, and on the Commission’s Web site under the Rainbow Ventures, compatible with the

VerDate Aug<31>2005 16:20 Jun 28, 2007 Jkt 211001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\29JNN1.SGM 29JNN1
35704 Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Notices

public interest, and is reasonably ENVIRONMENTAL PROTECTION resource protection directives. Rating
necessary or appropriate for such AGENCY EC2.
purposes. EIS No. 20070171, ERP No. D–FRC–
[ER-FRL–6688–5]
The Commission reserves the right to K03030–00, Phoenix Expansion
require a further showing that neither Environmental Impact Statements and Project, Construction and Operation
public nor private interests will be Regulations; Availability of EPA of Existing Natural Gas Transmission
adversely affected by continued Comments Pipeline, Right-of-Way Grant and
approvals of Rainbow Ventures’ Temporary Use Permit, San Juan and
issuance of securities or assumptions of Availability of EPA comments McKinley Counties, NM and Pinal
liability. prepared pursuant to the Environmental and Maricopa Counties, AZ.
Copies of the full text of the Director’s Review Process (ERP), under section
Summary: EPA expressed
Order are available from the 309 of the Clean Air Act and Section
environmental concerns about potential
Commission’s Public Reference Room, 102(2)(c) of the National Environmental
impacts to air quality, aquatic resources,
888 First Street, NE., Washington, DC Policy Act as amended. Requests for
and endangered species. EPA
20426. The Order may also be viewed copies of EPA comments can be directed
recommended that the FEIS provide
on the Commission’s Web site at to the Office of Federal Activities at
additional information regarding
http://www.ferc.gov, using the eLibrary 202–564–7167.
An explanation of the ratings assigned alternatives and identify, and commit
link. Enter the docket number excluding to, opportunities for minimizing
the last three digits in the docket to draft environmental impact
statements (EISs) was published in FR impacts. Rating EC2.
number filed to access the document. EIS No. 20070172, ERP No. D–FRC–
Comments, protests, and interventions dated April 6, 2007 (72 FR 17156).
G03035–00, Southeast Supply Header
may be filed electronically via the Draft EISs Project, Construction and Operation
Internet in lieu of paper. See 18 CFR of Natural Gas Pipeline Facilities,
EIS No. 20070055, ERP No. D–AFS–
385.2001(a)(1)(iii) and the instructions Located in various Counties and
L65534–ID, Idaho Cobalt Project,
on the Commission’s Web site under the Parishes in LA, MS and AL.
Development of Two Underground
‘‘e-Filing’’ link. The Commission
Mines, a Waste Disposal Site and Summary: EPA expressed
strongly encourages electronic filings.
Associated Facilities, Approval of environmental concerns about potential
Kimberly D. Bose, Plan-of-Operation, Salmon-Cobalt impacts to wetlands and air quality, and
Secretary. Ranger District, Salmon-Challis recommended additional analyses to be
[FR Doc. E7–12615 Filed 6–28–07; 8:45 am] National Forest, Lemhi County, ID. included in the Final EIS. Rating EC2.
BILLING CODE 6717–01–P Summary: EPA expressed EIS No. 20070174, ERP No. D–BPA–
environmental concerns about the L91029–WA, Chief Joseph Hatchery
impacts to fishery and cultural Program, Construction, Operation and
DEPARTMENT OF ENERGY resources and impacts related to Maintenance of a Chinook Salmon
contaminated soils. Rating EC2. Hatchery Production Program,
Federal Energy Regulatory EIS No. 20070103, ERP No. D–FHW– Confederated Tribes of the Colville
Commission C50015–NY, Kosciuszko Bridge Reservation (Colville Tribes),
Project, Proposed Rehabilitation or Okanogan River and Columbia River,
[Docket No. EL07–69–000] Replacement a 1.1 mile Segment Okanogan County, WA.
Brooklyn-Queens Expressway (-278) Summary: EPA expressed
Western Systems Power Pool from Morgan Avenue in Brooklyn and environmental concerns about discharge
Agreement; Notice of Institution of the Long Island Expressway (1495) in water quality and requested additional
Proceeding and Refund Effective Date Queens, Kings and Queens Counties, information regarding the applicability
June 22, 2007. NY. of state and tribal water quality
On June 21, 2007, the Commission Summary: EPA expressed standards. Rating EC2.
issued an order that instituted a environmental concerns about potential EIS No. 20070051, ERP No. DS–COE–
proceeding in the above-referenced air quality impacts, and requested E32070–MS, Gulfport Harbor
docket, pursuant to section 206 of the additional information and mitigation. Navigation Channel Project, Updated
Federal Power Act (FPA), 16 U.S.C. Rating EC2. Information on Providing Safe and
824c, to investigate whether the Western EIS No. 20070132, ERP No. D–AFS– Unrestricted Navigation into and out
Systems Power Pool Agreement ceiling J61111–00, Yellowstone and Grand of Gulfport Harbor, Harrison County,
rate is just and reasonable for a public Teton National Parks and the John D. MS.
utility seller in markets in which such Rockefeller, Jr. Memorial Parkway, Summary: EPA expressed
seller has been found to have market Winter Use Plan, To Provide a environmental concerns about impacts
power or is presumed to have market Framework for Managing Winter Use to biological resources. EPA requested
power. Western System Power Pool, 119 Activities, Implementation, Fremont additional information to ensure that
FERC ¶ 61,302 (2007). County, ID, Gallatin and Park the dredged material to be disposed
The refund effective date in the Counties, MT Park and Teton meets the relevant Ocean Dumping
above-docketed proceeding, established Counties, WY. Criteria. Rating EC2.
pursuant to section 206(b) of the FPA, Summary: EPA expressed
environmental concerns about air Final EISs
will be the date of publication of this
mstockstill on PROD1PC66 with NOTICES

notice in the Federal Register. quality, natural soundscapes, and EIS No. 20070087, ERP No. F–FTA–
wildlife. EPA believes that the preferred E40775–FL, Miami North Corridor
Kimberly D. Bose, alternative should be modified or a Project, Build Alternative is Selected,
Secretary. different alternative should be selected Transit Improvement between NW 62
[FR Doc. E7–12611 Filed 6–28–07; 8:45 am] that meets the National Park Service’s Street at Dr. Martin Luther King Jr.
BILLING CODE 6717–01–P adaptive management thresholds and its Station and NW 215th Street at the

VerDate Aug<31>2005 16:20 Jun 28, 2007 Jkt 211001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\29JNN1.SGM 29JNN1

S-ar putea să vă placă și