Sunteți pe pagina 1din 2

27168 Federal Register / Vol. 72, No.

92 / Monday, May 14, 2007 / Notices

The following areas have been address listed above or other locally Whether the proposed collection is
determined to be adversely affected by announced locations. necessary for the FHWA’s performance;
the disaster: The following areas have been (2) the accuracy of the estimated
Primary Counties: determined to be adversely affected by burden; (3) ways for the FHWA to
Bennington, Caledonia, Essex, the disaster: enhance the quality, usefulness, and
Orange, Rutland, Windham, Primary Counties: clarity of the collected information and
Windsor. Boone, Cabell, Lincoln, Logan, Mingo, (4) ways that the burden could be
Wayne, Wyoming minimized, including the use of
The Interest Rates are: electronic technology, without reducing
The Interest Rates are:
the quality of the collected information.
Percent
Percent All comments should include the
Other (Including Non-Profit Or- Docket number FHWA–2007–28156.
ganizations) with Credit Other (Including Non-Profit Or- FOR FURTHER INFORMATION CONTACT:
Available Elsewhere .............. 5.250 ganizations) with Credit
Available Elsewhere .............. 5.250
Chung Eng, 202–366–8043, Office of
Businesses and Non-Profit Or- Transportation Operations, Federal
ganizations without Credit Businesses And Non-Profit Or-
ganizations without Credit Highway Administration, Department of
Available Elsewhere .............. 4.000
Available Elsewhere .............. 4.000 Transportation, 400 Seventh Street,
SW., Washington, DC 20590. Office
The number assigned to this disaster
The number assigned to this disaster hours are from 8 a.m. to 5 p.m., Monday
for physical damage is 10870.
for physical damage is 10869. through Friday, except Federal holidays.
(Catalog of Federal Domestic Assistance SUPPLEMENTARY INFORMATION:
Number 59008) (Catalog of Federal Domestic Assistance
Number 59008) Title: Work Zone Safety and Mobility.
Herbert L. Mitchell, OMB Control #: 2125–0600
Herbert L. Mitchell, (expiration date July 31, 2007).
Associate Administrator for Disaster
Assistance. Associate Administrator for Disaster Background: As amended on
Assistance. September 9, 2004, 23 CFR part 630,
[FR Doc. E7–9188 Filed 5–11–07; 8:45 am]
[FR Doc. E7–9187 Filed 5–11–07; 8:45 am] subpart J ‘‘Work Zone Safety and
BILLING CODE 8025–01–P
BILLING CODE 8025–01–P Mobility’’ requires State and local
transportation agencies that receive
SMALL BUSINESS ADMINISTRATION Federal-aid highway funding to use
DEPARTMENT OF TRANSPORTATION available work zone information and
[Disaster Declaration # 10869] data to assess and manage the work
Federal Highway Administration zone impacts of highway projects. While
West Virginia Disaster # WV–00005
[Docket No. FHWA–2007–28156] this Rule does not require the reporting
AGENCY: U.S. Small Business or submission of work zone data, it
Administration. Notice of Request for Extension of does:
ACTION: Notice. Currently Approved Information • Require agencies to use work zone
Collection data at both the project and process
SUMMARY: This is a Notice of the levels to manage and improve work
AGENCY: Federal Highway zone safety and mobility;
Presidential declaration of a major
Administration (FHWA), DOT. • At the project level, require
disaster for Public Assistance Only for
the State of West Virginia (FEMA–1696– ACTION: Notice and request for agencies to use field observations,
DR), dated 5/1/2007. comments. available work zone crash data, and
Incident: Severe Storms, Flooding, operational information to manage the
SUMMARY: The FHWA has forwarded the
Landslides, and Mudslides. work zone impacts of individual
information collection request described
Incident Period: 4/14/2007 through projects;
in this notice to the Office of
4/18/2007. • At the process level, require
Management and Budget (OMB) to
DATES: Effective Date: 5/1/2007. agencies to analyze work zone crash and
renew an information collection. We
Physical Loan Application Deadline operational data from multiple projects
published a Federal Register Notice
Date: 7/2/2007. to improve agency processes and
with a 60-day public comment period
procedures, and continually pursue the
ADDRESSES: Submit completed loan on this information collection on
improvement of overall work zone
applications to: U.S. Small Business February 26, 2007. We are required to
safety and mobility; and
Administration, Processing and publish this notice in the Federal
• Recommend that agencies maintain
Disbursement Center, 14925 Kingsport Register by the Paperwork Reduction
elements of the data and information
Road, Fort Worth, TX 76155. Act of 1995.
resources that are necessary to support
FOR FURTHER INFORMATION CONTACT: A. DATES: Please submit comments by June the use of work zone data for the
Escobar, Office of Disaster Assistance, 13, 2007. activities above.
U.S. Small Business Administration, ADDRESSES: You may send comments, Most of the data needed to conduct
409 3rd Street, SW., Suite 6050, within 30 days, to the Office of work zone performance monitoring
Washington, DC 20416. Information and Regulatory Affairs, during project implementation as well
SUPPLEMENTARY INFORMATION: Notice is Office of Management and Budget, 725 as post-implementation assessments
hereby given that as a result of the 17th Street, NW., Washington, DC should be readily available from pre-
pwalker on PROD1PC71 with NOTICES

President’s major disaster declaration on 20503, or e-mail at existing sources. However, data
5/1/2007, Private Non-Profit oira_submission@omb.eop.gov, collection or data storage and retrieval
organizations that provide essential Attention DOT Desk Officer. You are systems may need to be altered to take
services of a governmental nature may asked to comment on any aspect of this full advantage of available information
file disaster loan applications at the information collection, including: (1) resources.

VerDate Aug<31>2005 18:21 May 11, 2007 Jkt 211001 PO 00000 Frm 00096 Fmt 4703 Sfmt 4703 E:\FR\FM\14MYN1.SGM 14MYN1
Federal Register / Vol. 72, No. 92 / Monday, May 14, 2007 / Notices 27169

Respondents: The State Departments Brad Beckham, Environmental Programs lane in each direction on US 85 from C–
of Transportation (or equivalent) in the Branch Manager, Colorado Department 470 to Meadows Parkway, and on I–25
50 states, the District of Columbia, and of Transportation, 4201 East Arkansas, between C–470 and Douglas Lane. This
the Commonwealth of Puerto Rico. Denver, CO 80222. Phone: 303–757– will include improvements to ten
Frequency: Continuous. 9533. E-mail: interchanges, improvement of bicycle/
Estimated Total Annual Burden brad.beckham@dot.state.co.us. pedestrian facilities, construction of a
Hours: The estimated total annual new park and ride, a new frontage road
burden for all respondents is 83,200 Notice is
SUPPLEMENTARY INFORMATION:
and improvements to various other
hours. This involves responses from 52 hereby given that the FHWA and other
roadway features. The improvements
State Departments of Transportation or Federal agencies have taken final agency
are proposed to address present and
equivalent with an estimated average actions by issuing licenses, permits, and
future transportation inadequacies and
time of 1,600 hours per respondent over approvals for the highway projects in
safety problems in the two roadway
the course of a year. This estimate only the State of Colorado that are listed
corridors. The project length is 17 miles
includes the burden on the respondents below. The actions by the Federal
on I–25 and 16 miles on US 85. A FEIS/
to provide information that is not agencies on a project, and the laws
Draft Section 4(f) Evaluation was
usually and customarily collected. under which such actions were taken,
completed in May 2001, a Record of
are described in the environmental
Authority: The Paperwork Reduction Act Decision (ROD)/Final Section 4(f)
assessment (EA), or environmental Evaluation was issued on 8/14/01, and
of 1995; 44 U.S.C. Chapter 35, as amended;
and 49 CFR 1.48.
impact statement (EIS) issued in a Revised ROD/Final Section 4(f)
connection with the project, and in Evaluation was issued on 10/25/02.
Issued on: May 8, 2007. other documents in the FHWA
James R. Kabel,
2. Project: Crystal Valley/Dawson
administrative record for the project. Ridge Parkway/I–25 Interchange.
Chief, Management Programs and Analysis The EA, or Final EIS (FEIS), and other
Division.
Location: City of Castle Rock, Douglas
documents from the FHWA County. Project Reference Number: CC
[FR Doc. E7–9157 Filed 5–11–07; 8:45 am] administrative record files for the listed C470–022. The preferred alternative
BILLING CODE 4910–22–P projects are available by contacting the includes constructing a new diamond
FHWA or the Colorado Department of interchange with Crystal Valley/Dawson
Transportation (CDOT) at the addresses Ridge Parkway crossing over I–25 at the
DEPARTMENT OF TRANSPORTATION provided above. Project information
intersection of I–25 and Douglas Lane
may also be available through the CDOT on the east, and Territorial Road on the
Federal Highway Administration
Web site at http://www.dot.state.co.us/ west. The purpose of the project is to
Notice of Final Agency Actions on TravelInfo/Studies.htm, or at public enhance the local ancillary roadway
Proposed Highways in Colorado libraries in the relevant project areas. network and eliminate one railroad
This notice applies to all Federal crossing, thereby improving safety of
AGENCY: Federal Highway agency decisions on the listed project as access. An Environmental Assessment
Administration (FHWA), DOT. of the issuance date of this notice and and draft Section 4(f) Evaluation was
ACTION: Notice of Limitation on Claims all laws under which such actions were completed on September 20, 2004 and
for Judicial Review of Actions by FHWA taken, including but not limited to: a Finding of No Significant Impact
and Other Federal Agencies. 1. National Environmental Policy Act (FONSI)/Final Section 4(f) Evaluation
(NEPA) [42 U.S.C. 4321–4351]. was issued on 2/28/05.
SUMMARY: This notice announces actions 2. Federal-Aid Highway Act [23 3. Project: I–70/32nd Avenue
taken by the FHWA and other Federal U.S.C. 109]. Interchange. Location: Cities of Wheat
agencies that are final within the 3. Clean Air Act, 42 U.S.C. 7401– Ridge and Lakewood. Project reference
meaning of 23 U.S.C. 139(1)(1). The 7671(q). Number: IM 0703–294. The proposed
actions relate to various proposed 4. Section 4(f) of the Department of action is to improve the I–70/32nd
highway projects in the State of Transportation Act of 1966 [49 U.S.C. Avenue interchange, State Highway
Colorado. Those actions grant licenses, 303]; (SH) 58 from McIntyre Street to I–70,
permits, and approvals for the projects. 5. Endangered Species Act [16 U.S.C. and adjacent portions of 32nd Avenue.
DATES: By this notice, the FHWA is 1531–1544 and Section 1536]. The purpose is to relieve traffic
advising the public of final agency 6. Section 106 of the National Historic congestion at the I–70/32nd Avenue
actions subject to 23 U.S.C. 139(1)(1). A Preservation Act of 1966, as amended interchange and to address future
claim seeking judicial review of the [16 U.S.C. 470(f) et seq.]. transportation demands on the local
Federal agency actions on any of the 7. Clean Water Act, 33 U.S.C. 1251– street network due to regional growth
listed highway projects will be barred 1377 (Section 404, Section 402, Section and commercial development. An
unless the claim is filed on or before 401, Section 319). Environmental Assessment was
November 13, 2007. If the Federal law 8. E.O. 11990, Protection of Wetlands. completed on October 23, 2006 and a
that authorizes judicial review of a 9. E.O. 11988, Floodplain FONSI was issued on February 28, 2007.
claim provides a time period of less Management. 4. Project: State Highway (SH) 9,
than 180 days for filing such calim, then 10. E.O. 12898, Federal Actions to Frisco to Breckenridge. Location: Cities
that shorter time period still applies. Address Environmental Justice in of Frisco and Breckenridge, Summit
FOR FURTHER INFORMATION CONTACT: Mr. Minority Populations and Low Income County. Project Reference Number: STA
Michael Vanderhoof, Environmental Populations. 009A–021. The proposed action will
Program Manager, Federal Highway The projects subject to this notice are: improve the existing two lane highway
Administration, 12300 W. Dakota Ave., 1. Project: South Interstate 25 (I–25) to a four-lane roadway that will include
pwalker on PROD1PC71 with NOTICES

Room 180, Lakewood, CO 80228. Office and US 85 Corridor. Location: Cities of necessary turn lanes, acceleration/
Hours: 7 a.m.-4:30 p.m. MST, Monday Highlands Ranch, Lone Tree, and Castle deceleration lanes, curb and gutter,
through Friday. Phone: 720–963–3013. Rock, Douglas County. Project Reference medians, and shoulders The project
E-mail: Number: IM 0252–317. This project extends from Frisco (milepost 97) south
michael.vanderhoof@fhwa.dot.gov., or involves the construction of one new to Breckenridge (milepost 85). The

VerDate Aug<31>2005 19:49 May 11, 2007 Jkt 211001 PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 E:\FR\FM\14MYN1.SGM 14MYN1

S-ar putea să vă placă și