Documente Academic
Documente Profesional
Documente Cultură
to accessibility@ferc.gov or call toll free will explain the proposed base charge SUPPLEMENTARY INFORMATION: The
(866) 208–3372 (voice) or 202–502–8659 and rates at a public information forum proposed base charge and rates for BCP
(TTY), or send a FAX to 202–208–2106 on April 11, 2007, beginning at 10:30 electric service are designed to recover
with the required accommodations. a.m. MST, in Phoenix, Arizona (AZ). an annual revenue requirement that
All interested persons are permitted Interested parties can provide oral and includes the investment repayment,
to attend. For further information please written comments at a public comment interest, operation and maintenance,
contact Keith Pierce at (202) 502–8525 forum on May 9, 2007, beginning at replacements, payment to states, visitor
or e-mail keith.pierce@ferc.gov. 10:30 a.m. MST, at the same location. services, and uprating payments. The
Magalie R. Salas,
Western will accept written comments total costs are offset by the projected
any time during the consultation and revenue from water sales, visitor
Secretary.
comment period. services, water pumping energy sales,
[FR Doc. E7–2482 Filed 2–13–07; 8:45 am]
ADDRESSES: The meetings will be held at facilities use charges, regulation and
BILLING CODE 6717–01–P
the Desert Southwest Customer Service spinning reserve services, miscellaneous
Regional Office, located at 615 South leases, and late fees. The projected
DEPARTMENT OF ENERGY 43rd Avenue, Phoenix, AZ. Send
annual revenue requirement is the base
written comments to: J. Tyler Carlson,
charge for electric service and is divided
Western Area Power Administration Regional Manager, Desert Southwest
Customer Service Region, Western Area equally between capacity dollars and
Boulder Canyon Project Power Administration, P.O. Box 6457, energy dollars. Annual energy dollars
Phoenix, AZ 85005–6457, e-mail are divided by annual energy sales, and
AGENCY: Western Area Power carlson@wapa.gov. Written comments annual capacity dollars are divided by
Administration, DOE. may also be faxed to (602) 605–2490, annual capacity sales to determine the
ACTION: Notice of Proposed Base Charge attention: Jack Murray. Western will proposed energy rate and the proposed
and Rates Adjustment. post information about the rate process capacity rate.
SUMMARY: The Western Area Power on its Web site at http://www.wapa.gov/ The Deputy Secretary of Energy
Administration (Western) is proposing dsw/pwrmkt/BCP/RateAdjust.htm. approved the existing rate formula for
an adjustment to the Boulder Canyon Western will post official comments calculating the base charge and rates in
Project (BCP) electric service base received via letter and e-mail to its Web Rate Schedule BCP–F7 for BCP electric
charge and rates. The current base site after the close of the comment service on August 11, 2005, (Rate Order
charge and rates expire September 30, period. Western must receive written No. WAPA–120, 70 FR 50316, August
2007. The current base charge is not comments by the end of the 26, 2005). The Federal Energy
sufficient to pay all annual costs consultation and comment period to Regulatory Commission (Commission)
including operation, maintenance, ensure they are considered in Western’s confirmed and approved the rate
replacements, and interest expense, and decision process. formula on a final basis in Docket No.
to repay investment obligations within As access to Western facilities is
EF05–5091–000 issued June 22, 2006
the required period. The proposed base controlled, any U.S. citizen wishing to
(115 FERC ¶ 61,362). Rate Schedule
charge will provide sufficient revenue to attend any meeting held at Western
must present an official form of picture BCP–F7 became effective on October 1,
pay all annual costs and to repay 2005, for the period ending September
investment obligations within the identification, such as a U.S. driver’s
license, U.S. passport, U.S. Government 30, 2010. Under Rate Schedule BCP–F7,
allowable period. A detailed rate for FY 2008, the base charge is
package that identifies the reasons for ID, or U.S. Military ID, at the time of the
meeting. Foreign nationals should $74,898,171, the forecasted energy rate
the base charge and rates adjustment
contact Western at least 45 days in is 9.33 mills per kilowatthour (mills/
will be available in March 2007. The
advance of the meeting to obtain the kWh), the forecasted capacity rate is
proposed base charge and rates are
scheduled to become effective on necessary form for admittance to $1.81 per kilowattmonth (kWmonth),
October 1, 2007, and will remain in Western. and the composite rate is 18.65 mills/
effect through September 30, 2008. This kWh.
FOR FURTHER INFORMATION CONTACT: Mr.
Federal Register notice initiates the Jack Murray, Rates Team Lead, Desert Under Rate Schedule BCP–F7, the
formal process for the proposed base Southwest Customer Service Region, proposed rates for BCP electric service
charge and rates. Western Area Power Administration, will result in an overall composite rate
DATES: The consultation and comment P.O. Box 6457, Phoenix, AZ 85005– increase of about 10 percent. The
period will begin today and will end 6457, telephone (602) 605–2442, e-mail following table compares the current
May 15, 2007. Western representatives jmurray@wapa.gov. and proposed base charge and rates.
The increase in the electric service with operation and maintenance, visitor revenue projections for the visitor
base charge and rates is primarily the services, uprating program payments, services.
result of higher annual costs associated replacements, and no increase in
VerDate Aug<31>2005 17:27 Feb 13, 2007 Jkt 211001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\14FEN1.SGM 14FEN1
Federal Register / Vol. 72, No. 30 / Wednesday, February 14, 2007 / Notices 7027
rulemaking. This action does not require Management and Budget (OMB). This of encryption, and be free of any defects
a regulatory flexibility analysis since it ICR is scheduled to expire on 6/30/ or viruses. For additional information
is a rulemaking specifically involving 2007. Before submitting the ICR to OMB about EPA’s public docket, visit the EPA
rates or services applicable to public for review and approval, EPA is Docket Center homepage at http://
property. soliciting comments on specific aspects www.epa.gov/epahome/dockets.htm.
VerDate Aug<31>2005 17:27 Feb 13, 2007 Jkt 211001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\14FEN1.SGM 14FEN1