Sunteți pe pagina 1din 5

Richa Hanik

Jl. Kutuk Tengah RT 9 RW 7 no.227 Sidokare


Sidoarjo, JawaTimur, Indonesia

Email: richa.hanik@gmail.com
Mobile GSM: +6285230509539

Curriculum Vitae

Personal Information
Name
Date of Birth
Nationality
Gender
Status
Religion
Address
Phone
Email

: Richa Hanik
: Sidoarjo, Indonesia / September 18th 1988
: Indonesia
: Female
: Single
: Moslem
: Jl. Kutuk Tengah RT 9 RW 7 no.227 Sidoarjo, 61214,
JawaTimur, Indonesia
: +6281938844123 / +6285230509539
: richa.hanik@gmail.com

Education
September 2007September 2011

SarjanaSainsTerapan (S.ST)
PoliteknikElektronikaNegeriSurabaya,
Teknologi Sepuluh Nopember (ITS)
Surabaya, Indonesia
Telecommunication Engineering
GPA: 3.44 (scale 4.00)

SMA Negeri 4 Sidoarjo 2004 - 2007

Training

Drive Test Training at PT. Nubee


RBS Training at PT. XL Axiata Surabaya
Cisco Networking Academy by CISCO, EEPIS-ITS
RAN 3G Wireless Training at PT. Huawei Tech Investment

Institut

Richa Hanik
Jl. Kutuk Tengah RT 9 RW 7 no.227 Sidokare
Sidoarjo, JawaTimur, Indonesia

Email: richa.hanik@gmail.com
Mobile GSM: +6285230509539

Experience
PT Nexwave
as 3G RNO Engineer for Project Indosat Jaguar area Malang
March 2015 April 2015
Prepare and create neighbor/adjacent for swap list by Smart RNO
Prepare and execute standard parameter after site swapped
Neighbor Relation Audit performance based on statistic and drive test
Monitoring, analyze and give remark KPI performance site / cluster after swap
(hourly and daily)
Audit Global parameter (RNC/NodeB/CELL) and adjust parameter for special
condition.
Handling Cluster Achievement and Parameter Discrepancy check.
Monitoring performance after CR executed.
Assist and analyze RF Drive Test data to determine parameter modification
required for network optimization.
Optimization by antenna tilt, antenna azimuth, frequency tuning, and neighbor
scenario.

PT Nexwave
as PLO Engineer (Rental Resource Nokia) for RO H3I Project H3I Balom at Denpasar
August 2014 December 2014
Analyzing RF Drive Test data to determine parameter modification required for
network optimization.
Pre Launch Optimization and making Report Single Site Verification based on
field measurement of the drive test performance.
Create Neighbor / adjacent properly for new sites.
Monitoring and analyze KPI Radio Network performance such as availability,
accessibility, retainability and integrity degradation new sites that impacted to
existing sites.
Optimization by antenna tilt, antenna azimuth, frequency tuning, and neighbor
scenario.
PT Huawei Tech Investment
Division NPM (Network Performance Management) as BSS/RAN Performance Analyst
Engineer for Manage Service Project Huawei H3I East Java Region at Surabaya
July 2012 April 2014
Collect data Main KPI for daily check performance (2G and 3G) East Java Region
by inspur and Netact to be analyzed.
Make hourly, daily and final report to monitor the network performance consist
with 3G KPI : CSSR CS/PS , DCR CS/PS, SHOSR CS/PS, ISHOSR CS/PS, Blocking
(IuB, power, code, CE), Traffic and Throughput. 2G KPI : CSSR, SDSR, PDASR,
HOSR, TCH Drop, SD Drop, TBF Drop, SD Blocking, TCH Blocking, Traffic and

Richa Hanik
Jl. Kutuk Tengah RT 9 RW 7 no.227 Sidokare
Sidoarjo, JawaTimur, Indonesia

Email: richa.hanik@gmail.com
Mobile GSM: +6285230509539

Throughput.
Doing analysis and assessment regarding all BSS problem and issues, and
coordinate with related team to make swift resolution. Consist of 2G Siemens,
2G Nokia, 3G Huawei and 3G Nokia.
Finding and analyzing worst cell contributor and root cause degradation in
every RNC and BSC.
Top Sites/cells monitoring (congestion, drop call and handover)
Monitoring Top sites have alarms which impacted to performance by daily
alarm monitoring.
Improving KPI as well as site level KPI which have below KPI Baseline to reach
target.
Give general recommendation to improve site performance based on the
determined Main KPI (CSSR, DCR, HOSR etc)
Monitoring and create report cells/sites down and Sleeping cells for 2G and 3G
East Java Region, deliver daily update based
Check and monitoring L0 and site unblocked by NIC
Check and analyze the radio performance after Change Request execution from
NPO, RO, Capacity team, and Core Team. Such as SW update, TRX Rebalancing,
Upgrade IuB/power/CE/Code, rehoming activity etc.
Send broadcast daily performance report to all related people (deliver daily update
based).
Create Performance Degradation Ticket / TT if any degradation Main KPI and
assign to Related Team by Inspur Ticket Management Service
Create TT site/cell down and alarm which impacted to performance and assign
TT to FM team to check on site
Monitor Alarm by citrix for 2G siemens, Tang for 2G Nokia, M2000 for 3G Huawei
and OMSElementManager web based for 3G Nokia
Highlight TT Performance degradation which still open and coordination to
related team
Monitoring, analyze and summarize Complain from VIP complain and customer

PT Huawei Tech Investment


Division NPM (Network Performance Management) as BSS/RAN Performance Analyst
Engineer for Manage Service Project Huawei H3I (National Team) at Jakarta
Dec 2011 June 2012
Make quick hourly, daily and final report to monitor the network performance
consist with 3G KPI : CSSR CS/PS , DCR CS/PS, SHOSR CS/PS, ISHOSR CS/PS,
Blocking (IuB, power, code, CE), Traffic CS/PS and Throughput. 2G KPI : CSSR,
SDSR, PDASR, HOSR, TCH Drop, SD Drop, TBF Drop, SD Blocking, TCH Blocking,
Traffic and Throughput.
Monitoring and analyze KPI Radio Network performance such as accessibility,
retainability and integrity degradation every BSC and RNC Basis (2G Siemens
and 3G Huawei) for National Network.
Finding cell contributor and root cause of degradation KPI

Richa Hanik
Jl. Kutuk Tengah RT 9 RW 7 no.227 Sidokare
Sidoarjo, JawaTimur, Indonesia

Email: richa.hanik@gmail.com
Mobile GSM: +6285230509539

Analyze KPI degraded impacted to National Level and give recommendation.


Check the radio performance and analyze after Change Request (CR) execution
from RO, Capacity team, and Core Team.
Follow up to NPO region and FLM Team to do action as recommendation to
improve performance.
Send broadcast daily performance report to all related people.
Check and escalate TT that impacted to National Performance.
Request TT regarding performance degradation to NOC (Front office) and escalate
to related team (BO, FM team, optimization team, Configuration team, Planning
Team and other related team).

Skill
Tools Engineering

Inspur, M2000, Citrix, Netact, iManager PRS Client, Tang

Wiresless
Communication

WiMAX, WiFi, XDSL, GSM, CDMA, Radio Link

Telephony
Telecommunication
Base

PABX, SIP, IVR, BSS, MSC .


Analog and Digital Modulation, QoS, OFDM, Transmission
System, Antenna and Propagation.

Computer Networking

Network Administration under Unix/Linux OS, TCP/IP,


Routting, Subnetting.

Operating System

Linuxdebianlenny
/
98/2000/XP/Vista/Seven

Office Software
Programming
Language

MS Office (Word, Excel, PowerPoint)


Visual C++, PHP,HTML,Javascript, Shell Programming,
Bahasa, English

squeeze

Personal Qualification

Self motivated and determination.


Fast learner.
Writing skill.
Creative problem solving.
Able to work individually or to work with the team.
High ability to adaptation.

Windows

Richa Hanik
Jl. Kutuk Tengah RT 9 RW 7 no.227 Sidokare
Sidoarjo, JawaTimur, Indonesia

Email: richa.hanik@gmail.com
Mobile GSM: +6285230509539

Reference Person

Armet Agusra as National Performance Team Leader Huawei for MS NPM H3I
project.
Email : armet.agusra@huawei.com phone : 08989901361
Faiq Ahmadin as RRM NPM Huawei East Java Region for H3I project.
Email : faiq.ahmadin@huawei.com phone : 089653985316

S-ar putea să vă placă și