Documente Academic
Documente Profesional
Documente Cultură
CURRICULUM VITAE
Carrier Objective :
I wish to develop my career in Telecom field. I would like to work in
Telecomunication environment where I get opportunities to face new challenges that
would help me to enhance my existing skills and develop new skills. I understand about
transmission, Installation, Survey, Commisioning, Network Perfomance Optimizaton. I would
like to with an organization where my work is valued and my decisions are respected so
that I can use my capabilities for the growth of the organization and for my career growth.
Personal Profile :
Name
KTP
Date of Birth
Gender
Status
Address
E-Mail
Phone
Nationality
Religion
Studies
Languages
Hobbies
: Prima Kurniawan
: 352422.311082.0002
: Magetan , October 31th, 1982
: Male
: Married
:Jl. Made Kidul XXII No. 02 RT 03 RW 03 Made Kec. Lamongan Kab. Lamongan, East
Java
: prima.kurniawan411@gmail.com & pk_rif@yahoo.com
: +6285258407676
: Indonesia
: Moslem
: Polytechnic Institute Technology Surabaya Diploma of Telecommunication.
: Indonesian, English
: Reading, Music, Football, Video Education
Education :
1989
1995
1998
2001
1995
1998
2001
2004
:
:
:
:
Training :
Workshop Training Drive Test Huawei TEMS 8.1.3 & 10.0.5 (Nubee Training
Center)
Workshop Training Installation NSN Surpass hiT 7035
Workshop Training Upgrade 3G Huawei BTS3900
Workshop Training Installation MW ZTE
Working Experiences :
PT. GCI Indonesia since Desember 2014 until now
Ref: Indro Purwoatmanto (Project Manager EJ: 081808034274)
Jr. RNO ZTE-Smart-EJ-RNO-RO
PT. Visi Infra Nusantara since Juni 2014 until Desember 2014
Ref: Anton Dewantoro (Project Manager: 082122713787)
RF Engineer Project NPI, GFR & POI (Point Of Interest by Customer) TSEL Huawei 2G/3G East Java
Manage Rigger & DT Team for escalation improvement network
Post processing logfile after escalation physical tunning & adjust parameter.
Devine badspot Coverage & Quality 2G/3G after DT cluster baseline
Make analysis & recomendation improvement Network Coverage per badspot area.
Make analysis & recomendation improvement network quality per badspot area.
Make analysis & recomendation improvement Crossfeeder Full or partial
Make analysis & recomendation improvement Handover Prosedure Complete
Monitoring improvement based on KPI Drive Test & Event Base Calcution
Support & make recommendation Site Audit (measurement Electrical & Mechanical Tilt) for
improvement.
Support Site Audit (measurement Electrical & Mechanical Tilt) for improvement
PT. Metro Global Service since July 2013 until January 2014
Ref: Gerald Richard (RPM: 081386247828)
DT & RF Engineer Project Swap/Co-Sitting Siemens to FMR NSN Telkomsel 2G/3G Balinusra & new
site LTE
Check & Troubleshoot Coverage main site per sector
Check & Troubleshoot Crossfeeder Full or partial
Check & Troubleshoot Handover Prosedure Complete
Check & Troubleshoot Interference
Stationery test Voice Call, SMS, Video Call, Irat 3G to 2G
KPI average Throughput Edge/R99>=200Kbps & HSDPA >=512 Kbps
Make DT report or Site Verification 2G/3G
o Scanner best RSCP & coverage prediction for 3G (acceptance value >= 95%)
o Scanner best Ec/No for 3G (acceptance value >= 90%)
o Scanner Scrambling Code
o Plotting DT RxLev Idle (coverage) & dedicated Mode (acceptance value DCS min 95%)
o Plotting DT RxQual Dedicated Mode (acceptance value DCS min 94%)
o Plotting DT SQI Dedicated Mode (acceptance value DCS min 93%).
o Plotting DT CI Idle & Dedicated Mode.
PT. China Comserve Indonesia since September 2012 until June 2013
Ref: Xyzco Primarosa (RPM-08128200949), Deddy Setiadi (RF-082125992082)
PT. Lintas Media Telekomunikasi since March 2011 until September 2012
Ref: Restu Dwi Andika (DT Coord-085233388998), Yogi Sulisiyanto (DT Analys: 081280277766), Iwan
Santoso (DT Analys-082131161105), Try Ary Prasetyo (RNO-081555600493).
Drive Test Plan Swap 2G/3G Telkomsel East Java Area
Cluster Route: Time Line of Baseline, Badspot Area.
Moving Test VIP Cluster, Customer Complain & Optimation.
Stationary Test: Call Setup Check, SMS, Video Call, Intrasite HO, Interband HO GSM-DCSGSM, Data Capbility (GPRS/EGPRS/HSDPA), Reselection 2G to 3G
SSV (single Site Verification):Crossfeeder check (all and partial), Handover (in-out) success &
Not Block Call/Drop Call
Test Point & Moving Cluster GFR (Frequency Return)
Moving Cluster Activation Vamos New Feature: Handover Success & Backup Block Call With
Site Neighbor
Drive test NPI Axis East Java Area
Moving test Project MCPA-UHGA Plan East Java Area.
Scanning Test Project SSV Axis East Java Area.
Stationary Test: Call Setup Check, SMS, Video Call, Data Capability 2G & 3G, Intracell
Handover, IRAT
Mobility Test: Soft Handover & Croosfeeder check.
Drive test NPI XL 3G East Java
Stationary Test Freg 1st Carrier (10763) & Freq 2nd Carrier (10788): Call Setup 3G, Video Call
3G, Data Capability HSDPA & HSUPA, IRAT
Mobility Test Freg 1st Carrier (10763) & Freq 2nd Carrier (10788): Soft Handover Procedure
Complete, DT Analysis report with KPI
In PT. Mayasakti Telekomunikasi since October,2010 until March 2011
Installation NSN Surpass hiT 7035 & 7070
Migration E1 from SDH to Surpass hiT 7035
Upgrade WBBP BTS Huawei 3900
Installation MW, Commisioning, Test Interference ZTE IP10
In PT. Indosat Reps Blitar May 2008 October 2010
Marketing Communication Blitar area
Create program Marketing
Technical Support BSS
In PT. Indosat Reps Madiun since Juny 2007 August 2008
Marketing Communication Madiun Area
Create program Marketing
Technical Support BSS
Computer Skill: