Sunteți pe pagina 1din 2

68608 Federal Register / Vol. 71, No.

227 / Monday, November 27, 2006 / Notices

surface area of 1,114 acres at normal preliminary permit application must ‘‘PROTEST’’, or ‘‘MOTION TO
water surface elevation of 1,565 feet conform with 18 CFR 4.30(b) and 4.36. INTERVENE’’, as applicable, and the
above mean sea level (msl); (2) a one- n. Competing Development Project Number of the particular
half mile-long, 34-foot-diameter tunnel Application—Any qualified application to which the filing refers.
to connect the upper reservoir with the development applicant desiring to file a Any of the above-named documents
existing Don Pedro Reservoir; (3) a competing development application must be filed by providing the original
powerhouse with pump/turbines having must submit to the Commission, on or and the number of copies provided by
an installed capacity of approximately before a specified comment date for the the Commission’s regulations to: The
880 megawatts (MW); (4) an intake on particular application, either a Secretary, Federal Energy Regulatory
the existing Don Pedro Reservoir, which competing development application or a Commission, 888 First Street, NE.,
would be used as the lower reservoir; (5) notice of intent to file such an Washington, DC 20426. An additional
a 47-mile-long, 230-kilovolt application. Submission of a timely copy must be sent to Director, Division
transmission line. Alternative A of the notice of intent to file a development of Hydropower Administration and
proposed project would have an annual application allows an interested person Compliance, Federal Energy Regulatory
generation of 1,541,000 MWh. to file the competing application no Commission, at the above-mentioned
Alternative B—(1) an upper reservoir later than 120 days after the specified address. A copy of any notice of intent,
with a maximum storage capacity of comment date for the particular competing application or motion to
13,000 acre-feet and a surface area of application. A competing license intervene must also be served upon each
166 acres at normal water surface application must conform with 18 CFR representative of the Applicant
elevation of 1,560 feet above mean sea 4.30(b) and 4.36. specified in the particular application.
level (msl); (2) a 1.1-mile-long, 25-foot- o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state,
diameter tunnel to connect the upper must specify the exact name, business and local agencies are invited to file
reservoir with the existing Don Pedro address, and telephone number of the comments on the described application.
Reservoir; (3) a powerhouse with pump/ prospective applicant, and must include A copy of the application may be
turbines having an installed capacity of an unequivocal statement of intent to obtained by agencies directly from the
approximately 440 MW; (4) an intake on submit, if such an application may be Applicant. If an agency does not file
the existing Don Pedro Reservoir, which filed, either a preliminary permit comments within the time specified for
would be used as the lower reservoir; (5) application or a development filing comments, it will be presumed to
a 47-mile-long, 230-kilovolt application (specify which type of have no comments. One copy of an
transmission line. Alternative B of the application). A notice of intent must be agency’s comments must also be sent to
proposed project would have an annual served on the applicant(s) named in this the Applicant’s representatives.
public notice.
generation of 770,000 MWh.
p. Proposed Scope of Studies under Magalie R. Salas,
k. Location of Applications: A copy of Permit—A preliminary permit, if issued, Secretary.
the application is available for does not authorize construction. The [FR Doc. E6–19928 Filed 11–24–06; 8:45 am]
inspection and reproduction at the term of the proposed preliminary permit BILLING CODE 6717–01–P
Commission in the Public Reference would be 36 months. The work
Room or may be viewed on the proposed under the preliminary permit
Commission’s Web site at http:// would include economic analysis, DEPARTMENT OF ENERGY
www.ferc.gov using the ‘‘eLibrary’’ link. preparation of preliminary engineering
Enter the docket number excluding the plans, and a study of environmental Federal Energy Regulatory
last three digits in the docket number impacts. Based on the results of these Commission
field to access the document. For studies, the Applicant would decide
assistance, call toll-free 1–866–208– whether to proceed with the preparation Notice of Application Accepted for
3676 or e-mail of a development application to Filing and Soliciting Motions To
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. Intervene, Protests, and Comments
call (202) 502–8659. A copy is also q. Comments, Protests, or Motions to
available for inspection and November 17, 2006.
Intervene—Anyone may submit
reproduction at the address in item g Take notice that the following
comments, a protest, or a motion to
above. hydroelectric application has been filed
intervene in accordance with the
l. Individuals desiring to be included with the Commission and is available
requirements of Rules of Practice and
on the Commission’s mailing list should for public inspection:
Procedure, 18 CFR 385.210, .211, .214. a. Type of Application: Preliminary
so indicate by writing to the Secretary In determining the appropriate action to
of the Commission. Permit.
take, the Commission will consider all b. Project No.: 12735–000.
m. Competing Preliminary Permit— protests or other comments filed, but c. Date filed: August 31, 2006.
Anyone desiring to file a competing only those who file a motion to d. Applicant: Midwest Hydraulic, Inc.
application for preliminary permit for a intervene in accordance with the e. Name of Project: Stebbinsville
proposed project must submit the Commission’s Rules may become a Hydroelectric Project.
competing application itself, or a notice party to the proceeding. Any comments, f. Location: The project would be
of intent to file such an application, to protests, or motions to intervene must located on the Yahara River, Porter
the Commission on or before the be received on or before the specified Township, Rock County, Wisconsin.
specified comment date for the comment date for the particular The Stebbinsville Dam is owned by
particular application (see 18 CFR 4.36). application. Wisconsin Edison Corporation.
Submission of a timely notice of intent r. Filing and Service of Responsive g. Filed Pursuant to: Federal Power
sroberts on PROD1PC70 with NOTICES

allows an interested person to file the Documents—Any filings must bear in Act, 16 U.S.C. 791(a)–825(r).
competing preliminary permit all capital letters the title h. Applicant Contacts: Mr. William
application no later than 30 days after ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Pickrell, Midwest Hydraulic, Inc., P.O.
the specified comment date for the TO FILE COMPETING APPLICATION’’, Box 167, Neshkoro, WI 54960, phone:
particular application. A competing ‘‘COMPETING APPLICATION’’, (920)–293–4628.

VerDate Aug<31>2005 16:58 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1
Federal Register / Vol. 71, No. 227 / Monday, November 27, 2006 / Notices 68609

i. FERC Contact: Etta Foster, (202) preliminary permit application must filing’’ link. The Commission strongly
502–8769. conform with 18 CFR 4.30(b) and 4.36. encourages electronic filing.
j. Deadline for filing comments, o. Competing Development s. Filing and Service of Responsive
protests, and motions to intervene: Application—Any qualified Documents—Any filings must bear in
January 23, 2007. development applicant desiring to file a all capital letters the title
The Commission’s Rules of Practice competing development application ‘‘COMMENTS’’,
and Procedure require all intervenors must submit to the Commission, on or ‘‘RECOMMENDATIONS FOR TERMS
filing documents with the Commission before a specified comment date for the AND CONDITIONS’’, ‘‘PROTEST’’,
to serve a copy of that document on particular application, either a ‘‘COMPETING APPLICATION’’ or
each person in the official service list competing development application or a ‘‘MOTION TO INTERVENE’’, as
for the project. Further, if an intervenor notice of intent to file such an applicable, and the Project Number of
files comments or documents with the application. Submission of a timely the particular application to which the
Commission relating to the merits of an notice of intent to file a development filing refers. Any of the above-named
issue that may affect the responsibilities application allows an interested person documents must be filed by providing
of a particular resource agency, they to file the competing application no the original and the number of copies
must also serve a copy of the document later than 120 days after the specified provided by the Commission’s
on that resource agency. comment date for the particular regulations to: The Secretary, Federal
k. Description of Project: The application. A competing license Energy Regulatory Commission, 888
proposed project would consist of: (1) application must conform with 18 CFR First Street, NE., Washington, DC 20426.
The existing 21.6-foot-high, 291-foot- 4.30(b) and 4.36. A copy of any motion to intervene must
long, Stebbinsville Dam; (2) an existing p. Notice of Intent—A notice of intent also be served upon each representative
reservoir having a surface area of 80 must specify the exact name, business of the Applicant specified in the
acres, and a storage area of 480 acre-feet; address, and telephone number of the particular application.
(3) a proposed powerhouse containing a prospective applicant, and must include t. Agency Comments—Federal, state,
single 375-kW generating unit; (4) a 40- an unequivocal statement of intent to and local agencies are invited to file
foot-long transmission line, and (5) submit, if such an application may be comments on the described application.
appurtenant facilities. The project is filed, either a preliminary permit A copy of the application may be
estimated to have an annual generation application or a development obtained by agencies directly from the
of 1,350,000 kWh, which would be sold application (specify which type of Applicant. If an agency does not file
to a local utility. application). A notice of intent must be comments within the time specified for
l. Locations of Applications: A copy of served on the applicant(s) named in this filing comments, it will be presumed to
the application is available for public notice. have no comments. One copy of an
inspection and reproduction at the q. Proposed Scope of Studies under agency’s comments must also be sent to
Commission in the Public Reference Permit—A preliminary permit, if issued, the Applicant’s representatives.
Room, located at 888 First Street NE., does not authorize construction. The Magalie R. Salas,
Room 2A, Washington DC 20426, or by term of the proposed preliminary permit
Secretary.
calling (202) 502–8371. This filing may would be 36 months. The work
also be viewed on the Commission’s proposed under the preliminary permit [FR Doc. E6–19945 Filed 11–24–06; 8:45 am]
Web site at http://www.ferc.gov using would include economic analysis, BILLING CODE 6717–01–P

the ‘‘eLibrary’’ link. Enter the docket preparation of preliminary engineering


number excluding the last three digits in plans, and a study of environmental
the docket number field to access the impacts. Based on the results of these DEPARTMENT OF ENERGY
document. For assistance, call toll-free studies, the Applicant would decide Federal Energy Regulatory
1–866–208–3676 or e-mail whether to proceed with the preparation Commission
FERCOnlineSupport@ferc.gov. For TTY, of a development application to
call (202) 502–8659. A copy is also construct and operate the project. Notice of Application for Amendment
available for inspection and r. Comments, Protests, or Motions to of License and Soliciting Comments,
reproduction at the address in item h Intervene—Anyone may submit Motions To Intervene, and Protests
above. comments, a protest, or a motion to
m. Individuals desiring to be included intervene in accordance with the November 17, 2006.
on the Commission’s mailing list should requirements of Rules of Practice and Take notice that the following
so indicate by writing to the Secretary Procedure, 18 CFR 385.210, .211, .214. application has been filed with the
of the Commission. In determining the appropriate action to Commission and is available for public
n. Competing Preliminary Permit— take, the Commission will consider all inspection:
Anyone desiring to file a competing protests or other comments filed, but a. Application Type: Recreation
application for preliminary permit for a only those who file a motion to Facilities Report.
proposed project must submit the intervene in accordance with the b. Project No: 2110–017.
competing application itself, or a notice Commission’s Rules may become a c. Date Filed: April 5, 2006, and
of intent to file such an application, to party to the proceeding. Any comments, supplemented June 7, 2006.
the Commission on or before the protests, or motions to intervene must d. Applicant: Consolidated Water
specified comment date for the be received on or before the specified Power Company (CWPC).
particular application (see 18 CFR 4.36). comment date for the particular e. Name of Project: Stevens Point.
Submission of a timely notice of intent application. f. Location: The project is located on
sroberts on PROD1PC70 with NOTICES

allows an interested person to file the Comments, protests and interventions the Wisconsin River in Portage County,
competing preliminary permit may be filed electronically via the Wisconsin.
application no later than 30 days after Internet in lieu of paper; See 18 C.F.R. g. Filed Pursuant to: Federal Power
the specified comment date for the 385.2001 (a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a) 825(r) and 799 and
particular application. A competing on the Commission’s web site under ‘‘e- 801.

VerDate Aug<31>2005 16:58 Nov 24, 2006 Jkt 211001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\27NON1.SGM 27NON1