Documente Academic
Documente Profesional
Documente Cultură
Saru SehgaJ
ECE Department, BMIET,
Sonepat, India
Delhi, India
sarusehgal1987@gmail.com
vikas acharya@rediff.com
_
output
supply.
module,
CPU,
memory
card
and,
power
Power
Supply
can
change
as
per
our
requirements.
Programmable
Supervisory
Control
Logical
and
Data
Ladder
(LAD),
Infrared
(B),
sensor
(IR),
Force
(F),
Conductor (L).
I.
Module
Central
>
Processing
Output
Module
H
Memory
Unit
Controller
Acquisition
Notations
Input
INTRODUCTION
Earlier,
the
chip
based
controller
circuit
"'OlJltlHt
Q.xDUiiolt
Specification
Power Supply
85-264 VAC
24.4-28.8 VDC
functions
available
and
[1].
Diagnostics
applications
can
are
be
centrally
immediately
also,
generates
problems
and
solutions
fault
which
for
the
may
upcoming
affect
in
the
Memory
4096 Byte
50 Hours
Optional Battery
200 Days
Digital VO
8/6
Analog I/O
None
Timer
256
Counter
256
motor,
etc.
and,
Siemens
software
are
A. HARDWARE
1) Siemens S7-200:
With
the
vast
choice
of
similar
systems
from
Original
Equipment
features,
powerful
real-time
great communication
easy-to-operate
software
and
responses,
options and,
hardware capability
system.
It
also
incorporates
compact
Table T
S7-200 CPU Specifications [4]
SCEECS 2014
Fig.3(a). S7-200[4]
winding
provide
different
inherent
current.
The
introduction
of
the
variable
by
power
electronics
system
called
DC
drivers.
SOFTWARE
B.
2) DC Motor:
the
principle
that
when
current
carrying
It is the programming
the
diagram;
these
contact
rails
are
BIL new t cm
(1)
2) In touch:
The
up
and
down
movements,
the
opening
an
Fig. 4. DC Motor
SCEECS 2014
relay
switch
and
gate
brake
signal,
relay
the
which runs
Conditional
branches
are
usually
used
in
Move
motor
reverse
upto desire
level
PUSH BUIIOH
11.1
Ii.l
desire level
LED 1
QI.1
11.3
QI.3
II.
AC con'
11.1
AC con-
11.6
DC con
[8] .
response
to
11.1
output
QI.I
the
S7-m
drive
QI.I
DC COl
A.
PLC
5irnen5
input
SCEECS 2014
Case 1:
1) PLC Application:
as
the
other
controllers
provides.
It's
working
per
language
2) SCADA Application:
view
of
the
working
the
elevator.
For
acuate and the doors will open simply. But if the call
button of the ground floor then motor moves in
the
the
elevator.
Through
SCADA
Case 2:
faulty
SCEECS 2014
Controf',
Training
Manual,
PLC,
SCADA,
MOTOR,
Noida: Sofcon India Pvt. Ltd.
and
iNSTRUMENTATiON.
Case 3:
Case
implementation
of
the
above,
Technology Volume-ll.
some
SCEECS 2014