Documente Academic
Documente Profesional
Documente Cultură
C
m
m
C
miiissssssiiiooonnniiinnnggg,,,
mm
Cooom
t
n
i
a
M
t
n
i
a
M
Mainteeennnaaannnccceee IIInnnssstttrrruuuccctttiiiooonnn
SSFF666 M
Muullttiiffuunnccttiioonnaall C
Coom
mppaacctt PPrreeffaabbrriiccaatteedd D
Deevviiccee
ffoorr EElleeccttrriicc PPoow
e
r
S
t
a
t
i
o
n
u
p
t
o
2
4
5
k
V
wer Station up to 245kV
222G
G
A
E
GJJJA
A777000000333111111 (((E
E))) /// rrreeevvv... --- /// 000222...222000000777
ttyyppee PPA
ASSSS M
M00SS SSB
BB
B
A
ABBBB
Copyright
We reserve all rights to this document and to the object described therein. The recipient of this document
recognizes these rights and will not without our prior written approval make this document available either in
part or in whole to any third party or use it for any purpose other than that for wich it was presented to him.
ABB PT S.p.A
Address
ABB PT S.p.A
U.O. Adda
Via dei Ceramisti
26900 Lodi Italy
tel. +39.0371 452.1
fax +39.0371 452.222
internet : http://www.abb.it
Notes
The operating instructions only constitute a description of the component, and they also provide information on the
operation and maintenance thereof. They do not substitute either for appropriate specialized personnel nor the
applicable regulations.
The operator of the installation is responsible for the employment of adequately trained specialized personnel, as well
as for the adherence to all applicable regulations.
222///444000
CONTENTS
0.
BASE DOCUMENTATION
page 5
1.
INTRODUCTION.
page 6
2.
page 6
3.
3.1.
3.2.
3.2.1.
3.2.2.
3.3.
3.3.1.
3.3.2.
3.4.
3.4.1.
3.4.2.
3.5.
3.5.1.
3.6.
3.6.1.
3.7.
3.8.
3.8.1.
3.8.2.
3.8.3.
3.8.3.1.
3.8.3.2.
3.8.3.3.
DESCRIPTION OF DEVICE..
Accessories
Circuit Breaking Chamber
General
Description
Combined Disconnector
General
Description
Disconnector/Earthuing Switch
General
Description
SF6/Air Bushings
Description
Current transformer
Description
BLK222 Type Motor Charged Spring Operating Device
Disconnector drive BES7
General
Description
Operation
Electrical Drive
Manual Drive
Mechanical Locks
page 6
4.
4.1.
4.2.
4.3.
4.4.
RUPTURE DISC.
Description
Package
Assembly
Check to be Made During Operation
page 9
5.
DENSITY SWITCH.
page 10
6.
SHIPPING...
page 10
7.
INCOMING CHECK
page 10
8.
STORAGE
page 11
9.
9.1.
9.2.
9.3.
9.4.
9.5.
9.5.1.
9.5.2.
9.6.
9.7.
9.8.
9.8.1.
INSTALLATION..
Introduction
Fixing Vertical Structure (if present)
Positioning and Assembling the main shipping Unit (standard execution)
Rotating the Side Poles
Assembling the Driving Gears on the Side Poles
Combined Disconnector
Disconnector/Earthing Switch
Laying the L.V. Cables and Connections
Connecting the earth Cables
Filling at Rated Pressure with special mixture
Checking the gas seal
page 11
10.
10.1.
10.2.
page 13
11.
END OF LIFE
page 14
12.
page 14
13.
page 14
14.
page 14
15.
page 15
16.
page 16
17.
page 17
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
333///444000
CONTENT OF FIGURES
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
fig.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15_1
15_2
16
17
18
19
CB chamber breaking..
Combined Disconnector.....
Disconnector/Earthing Switch......
SF6 / air bushing
Current Transformer
Disconnector Drive BES7...
Manual Drive, Mechanical Locks......................................................................
Rupture Disc.......................................................................................................
Shipping..
Fixing vertical structure..............................................................
Positioning PASS M0S SBB.
Assembling PASS M0S SBB
Rotating poles
Assembling shaft of the Combined Disconnector.
Assembling connecting rods Disconnector/Earthing Switch.
Closing block of disconnector..
Laying the low voltage cables..
CT connection (if present).
Connecting the earth cables..
Filling at rated pressure of SF6 / CF4 ..
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
pag.
5
13
16
16
17
17
17
17
17
18
18
18
CONTENT OF TABLES
tab.
tab.
tab.
tab.
tab.
tab.
tab.
tab.
tab.
tab.
tab.
tab.
1
2
3
4
5
6
7
8
9
10
11
12
Basic Documentation...
Filling pressure for PASS M0S SBB .............................
Set of spare parts for operation
Special Tools, Appliances and SF6 gas handling equipment
Consumables and ancillary materials : SF6 insulating gas
Consumables and ancillary materials : Cleaning material
Consumables and ancillary materials : Cleaning agents
Consumables and ancillary materials : Greases and oils..
Consumables and ancillary materials : Stickers..
Tools and equipment : Standard tools.
Tools and equipment : Special tools
Tools and equipment : Equipment
444///444000
0.
BASIC DOCUMENTATION
The complete operating instructions for a SF6 Multifunctional Compact prefabricated Device type PASS
M0S consists of the Basic Documentation and the supplied documentation. The scope of delivery is
installation specific. A complete set for this installation contains the following documents:
Title
Volume-number
2GJA700311 (E)
FM 431E
or 2GJA700130 E
MDS 100 / ex
ASSEMBLYING PROTECTION
2GJA700197 (I/E)
FD 595 I/E
2GJA700116 (E)
2GJA600188 (E)
FD217-E
FD 626E
tab.1
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
555///444000
1. INTRODUCTION
The PASS M0S is a compact multifunctional unit (see Layout and Single Line Diagram) consisting of a
limited number of subassemblies designed and tested at the factory and transportable to the site where it
may be installed rapidly and safely.
2. MAIN FEATURES AND ADVANTAGES COMPARED TO CONVENTIONAL EQUIPMENT
-
3. DESCRIPTION OF DEVICE
The PASS M0S (see Layout) consists of three separate switching poles, with the circuit breaking chamber
set horizontally. The combined disconnector is housed inside the casing of each switching pole.
One BLK222 drive controls own switching pole; one BES7 drive controls the combined disconnectors;
onother BES7 controls the disconnector/earthing switch.
The SF6/air bushings, for the connection with the overhead lines and busbar system, are installed at the
input/output.
These bushings are fitted with multi-ratio conventional current transformers with several windings.
The equipment is assembled on a support structure that shall be achored to the ground by means chemical
screw anchors, usually. The control cabinets are fitted to one of these structure.
3.1. Accessories
The PASS M0S SBB is provided with the following accessories (assembled on each pole):
-
The PASS M0S SBB is provided with the following accessories (assembled on the unit):
-
666///444000
involucre (1)
fixed contact (2) connected to the mobile contact of the combined disconnector;
mobile contact (3);
blow nozzle (4);
contact spring (5)
switching fingers (6);
upper shield (7);
lower shield (8);
support insulating cylinder (9);
drive rod (10);
opening spring (11) (inside the housing);
dehydrators (12);
bushing coupling terminal (13);
rupture disk (14);
view port (16);
housing (17).
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
777///444000
3.8.3. Operation
3.8.3.1. Electrical Drive
When the open/close button is pressed on the bay cabinet or remptely the motor rotates and, by mean of
gear reduction motor, causes the main shaft to rotate and, then, the mobile contact inside the disconnector.
The disconnector drive is situated on the central pole and motion is transmitted to the side poles by 2 shafts
gear boxes (disconnector drive for earth side-line and line-side are situated on lateral pole and motion is
transmitted to other poles by means connecting roads).
888///444000
the
(7)
will
the
line closed;
neutral position
earth closed
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
999///444000
Warning: whenever the safety device has to be removed, it must be replaced together with its seals.
4.2. Package
Each rupture disc is packaged singly in polystyrene containers (as spare part).
The bursting pressure and manufacturing number are indicated externally on its side.
4.3. Assembly
The rupture disc device is completely assembled at the factory and is only to be replaced in the case of
servicing or overhauling.
To replace it, proceed as follows:
-
remove the protective plate (6) by loosening the two M6 screws (13);
remove the four M12 screws (7), with torque 4.8 daNm and remove the protective shield (3) and the
protective lid (4);
remove the n.8 M12 screws (14) that secure the flange (2), with a torque of 4.8 daNm;
remove the ring (1), the disc (5) and the seals (9) and (11);
replace the disc (5) with its seals (9), (11) and (8);
having cleaned the surfaces of the seals thoroughly and greased them slightly, assemble by following
the reverse of the steps described above;
insert the new disc with its convex side facing towards the inside of the gas compartment;
assemble the flange (2) with the screws (14) tightening them alternately in a cross arrangement,
applying the specified torque;
centre the protective lid (4) so that, when the screws are tightened, only the rim is pressed (no other part
of the protective lid must be pressed).
111000///444000
6. SHIPPING (fig.9)
The PASS M0S is completely tested at the factory. The mechanical and dielectric tests are carried out on
the whole module completely assembled. The PASS M0S device is shipped with the circuit breaker open
and with its closing springs unloaded, and the combined disconnector closed on the earth side.
In standard configuration the poles are already conditioned and filled with SF6 gas at a reduced pressure of
0.02-0.03 MPa rel. at 20C. The weight of the transport unit is about 3400 kg.
Warning: do not operate the circuit breaker at this low pressure. Only operate the circuit breaker
when the pressure is 0,72 MPa relative (20C).
At the end of the factory test the double disconnector and the low voltage circuits of the cabinet are
disconnected; the driving gears of the disconnectors and earthing switch are disconnected. The side poles
are rotated 30 and set in a vertical position. The maximum height is less than 3650 mm and the width is less
than 3050 mm; the PASS M0S module may therefore be carried by means of transport. The remaining parts
completing the device, such as the control cabinet, the supporting structure, the tools and any spare parts,
are much smaller than the module, and therefore present no particular transport problems.
7. INCOMING CHECK
On receipt of the material, check the entire module, in particular the density switches, the controls of the
circuit breaker and disconnector and the bushings. Check that the equipment shows no signs of breakage or
tampering. If any problems are found, inform the Shipping office of ABB PT U.O. Adda immediately.
8. STORAGE
If the equipment is stored before assembly, it must be kept in a covered, dry place. If this equipment is
stored outside, it must be placed in a dry, drained place and all packages must be covered with tarpaulins.
The integrity of the packages and their covers must be checked periodically.
(See also document 2GJA700116 (E)).
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
111111///444000
9. INSTALLATION
9.1. Introduction
The main operations to be performed to install this equipment are:
-
check the necessary building works (if to be assembled on plinths or a platform made of reinforced
concrete);
fix the vertical frames by means of chemical or expansion plugs to the reinforced concrete plinths
(if present);
position and assemble the main shipping unit;
rotate side poles by 30
assemble driving gears on side poles of disconnectors;
connect L.V. cables;
connect earth cables;
fill with special mixture SF6 / CF4 at rated pressure.
111222///444000
5) with manual operation close the disconnector in busbar position and verify, in the same way, all
moving contacts are equally inserted in their fix contacts;
6) if further setting is necessary loosen the two M10 nuts (6) and rotate the regulation flange (3),
relative the moving contact to achive correct positioning, tight the two M10 nuts (6);
7) drill (8) 5 (+0 / +0,12) and pin all the three flanges with spring pins 5x20 (item SA20/0520)
supplied;
8) the threaded rod (9), fig. 17_1, is the single block of line disconnector; when the disconnector is in
closed position between the lever (2) and the threaded rod (9) there is a yoke of 1mm. The nuts (10)
are wrench tight;
9) with line closed, regulate the clerance between the pin (9) and the lever (2) on 2mm, sure tightening
the nuts (10).
9.6. Laying the L.V. Cables and Connections (fig.16)
In the standard conditions, the cables are completely connected on the cabinet side and are equipped at the
other end with connector. Only the cables of the current transformers have no connector.
Remove the lids of the cable channels already fixed to the transportable assembly unit of the PASS M0S
device; insert and lay the cables tidily inside the channels, avoiding excessive bending and tugging of the
cable before replacing the lids on the channels; tie the cables together with bands. The cables with a
connector bear a label on the mobile part, with the abbreviation of the connector. This abbreviation is also
indicated on the fixed part to which this connector will be connected.
See the wiring diagram for the names of the L.V. circuits.
To connect the C.T. (fig.17), remove the lid (1) by unscrewing the screws (2), unscrew the cable gland (3),
insert the cable from which a suitable length of the shield has been removed; connect the wires as indicated
in the circuit diagram choosing the desired ratio; tighten the cable clip securely, and replace the lid. Repeat
this operation for all current transformers present.
9.7. Connecting the Earth Cables (fig.18)
The two vertical frames must be connected to the earth with at least M12 bolts (1). Check the presence of
the earth cable (2) on the control cabinet and circuit breaker box (3).
9.8. Filling at Rated Pressure with special mixture (fig.19)
The PASS M0S already contains a slight overpressure of SF6, so it simply has to be filled as described
below:
-
111333///444000
FILLING PRESSURE
Nominal filling pressure (MPa rel.)
0,720
0,300
0,480
0,780
% (abs)
Gas
45
55
SF6
CF4
tab. 2
If the reaches the pressure is effected on density switch is not necessary to do some correction.
If reading is done with sample pressure gauge, it need do a correction of filling pressure, working of ambient
temperature. So for different temperatures by 20C the filling pressure, for PASS M0S, it will be as table 1 of
FD217-E.
At the end of the filling operation:
-
NOTE 1 : The operations described above are also to be performed even if you simply need
to refilling.
NOTE 2: (fig.19) the filling devices (see from pos. 7 till to pos. 17) and the pressure gauge (pos.3) are
not included in the supply. The pressure gauge shows only relative pressure: Pabs=Prel+Patm.
9.8.1. Checking the gas seal
After M0S module is filled to service gas pressure, check for SF6 gas leaks at all joints e flanges using SF6
leak detector, not included with M0S.
111444///444000
one crank for changing spring of drive BLK222, located inside the control cabinet;
one crank for turn disconnecotor drive BES7;
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
111555///444000
12. SET OF SPARE PARTS FOR OPERATION (NOT INCLUDED IN THE SUPPLY)
(otherwise confirmed)
Item
1
2
3
4
5
6
7
8
9
10
Description
Drive mechanism for pole of circuit breaker (BLK222)
Drive mechanism for disconnector (BES7)
Opening coil
Closing coil
Rupture disk
Set of heaters (2 for each type)
Set of relays (1 for each type)
Set of O-Rings (2 for each type)
Set of terminal blocks (3 for each type)
Complete spare pole
Units
1
1
1
1
1
1
1
1
1
1
tab. 3
13. SPECIAL TOOLS, APPLIANCES AND SF6 GAS HANDLING EQUIPMENT
The tools, appliances and SF6 gas equipment necessary for assembly, operation and maintenance
not included in the supply (otherwise confirmed):
Item
1
2
3
4
5
6
7
8
9
Description
Circuit breaker (Hand-crank) (supplied)
Tools for overhauling and maintenance work
SF6 bottle (kg43)
bottle carrying trolley
Empty bottle
SF6 filling equipment
SF6 dewpoint testing equipment
SF6 gas leak detector
SF6 filtering and recovering service wagon (option)
tab. 4
14. PREVENTIVE MAINTENANCE GUIDE (SEE DOCUMENT 2GJA600188E)
111666///444000
Units
1
1
1
1
1
1
1
1
1
Designation
SF6 insulating gas
Application
Order number
Supplier: see 2GJA600187 (E)
point: 1.5.5.
tab. 5
15.2. Cleaning material
Quantity
1
1
1
1
Designation
Clean rags without threads
Sand paper
Scraper
Metal brush
Application
Order number
Off-the-shelf
Off-the-shelf
Off-the-shelf
Off-the-shelf
Application
Order number
Off-the-shelf
Off-the-shelf
Application
Seals
Main contacts
Closing spring BLK
De-couplersi BLK
Kinematic elements BLK
Order number
Off-the-shelf
Off-the-shelf
Off-the-shelf
Application
Order number
UA500267P01
Off-the-shelf
tab. 6
15.3. Cleaning agents
Quantity
1
1
Designation
Ethyl alcohol
Volatile agents
tab. 7
15.4. Greases and oils
Quantity
1
1
1
1
Designation
Grease:RHODIA Pat 4
Grease: ASEOL utea 806/12
Grease: ASEOL NLGI1 1730
Grease: AEROSHELL 22
Off-the-shelf
tab. 8
15.5. Stickers
Quantity
1
1
Designation
FD Plast
Silicone
tab. 9
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
111777///444000
Designation
Tools to be fitted
Application
Order number
Off-the-shelf
tab. 10
16.2. Special tools
Quantity
1
1
Designation
Loading and de-loading crank
Application
BLK Drive
Crank
Drive BES7
Order number
UA310779P01
or 2GJA300875R01
UA420553R01
tab. 11
16.3. Equipment
Quantity
1
Designation
Control and recharging unit
for SF6
Application
tab. 12
17. TORQUE WRENCH SETTING FOR BOLT AND STUD
see document FD 626E
111888///444000
Order number
UA414631R06
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
111999///444000
fig. 1
1. involucre
2. fixed contact
3. mobile contact
4. blow nozzle
5. contact spring
6. switching fingers
7. upper shield
8. lower shield
Combined Disconnector
fig. 2
222000///444000
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
mobile contact
fixed contact side bushing
fixed contact side earthing cover
fixed chamber support
chamber shield
rotating insulator
rotating insulator shield
cover drive side
bearing
seals
seals
earthing cover
view port
1.
2.
3.
4.
5.
6.
7.
8.
9.
mobile contact
fixed contact side C.B.
rotating insulator
rotating insulator shield
covering
port hole
seals
drive side cover
bearing
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
fig. 3
222111///444000
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
flange
flange
insulating disc
flange
reinforced cylinder made of
glass, aramid and polyester
endless fibres
silicone rubber
shield
internal plate
primary busbar
flange
busbar head
upper cover
bar hold
fig. 4
222222///444000
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
metal casing
core
resin
seal
fixing cover
tinned copper plat
data plate
plate P..
cable glands
secondary terminal box
resin
schema plate
terminal *)
ABB
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
222333///444000
fig. 5
fig. 6
222444///444000
1.
2.
3.
4.
5.
6.
7.
8.
9.
electric motor
gear reduction motor
main shaft
secondary terminals box
position indicator : red close; green open (generic)
electro-magnet to handle manual drive
mechanical unlock for manual drive
crank for manual operation
connectors for electrical connection
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
fig. 7
222555///444000
6.
7.
8.
electromagnet
Mechanical unlock for manual drive
crank
10. disk
11. hinge pin
12. padlock
Rupture disc
222666///444000
fig. 8
1.
2.
3.
4.
5.
6.
7.
8.
9.
11.
13.
14.
ring
flange
protective shield
protective lid
rupture disk
protective plate
screw
seal
seal
seal
screw
screw
Shipping
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
fig. 9
222777///444000
fig. 10
222888///444000
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
fig. 11
222999///444000
333000///444000
fig. 12
1.
2.
Rotating poles
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
fig. 13
333111///444000
fig. 14
333222///444000
1.
2.
3.
4.
5.
6.
7.
8.
flange
torque tube
coupling pin
central bevel gear box
screw
nut
half flange
torque pin
2
2
1
1
5
3
8
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
fig. 15_1
333333///444000
2
10
Block of lever
fig. 15_2
333444///444000
Typical laying of the voltage cables inherent the PASS M0S SBB (this configuration and similar)
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
333555///444000
fig. 16
1.
2.
3.
4.
cover
screws
cable gland
terminals
fig. 17
333666///444000
1.
2.
3.
4.
5.
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
333777///444000
fig. 18
1. cap
2. valve
3. pressure gauge
4. nut
5. cap
SF6 filling
fig. 19
333888///444000
222G
G
A
E
GJJJA
A777000000333111111 (((E
E)))///rrreeevvv... ---///000222...222000000777
333999///444000
AB B
ABB PT S.p.A
U.O. Adda
Via dei Ceramisti
26900 Lodi - Italy
tel. +39 0371 452.1
fax. +39 0371 452.222
e-mail : abb-adda.itadd@it.abb.com
internet : http://www.abb.com/it
444000///444000