Sunteți pe pagina 1din 3

64952 Federal Register / Vol. 71, No.

214 / Monday, November 6, 2006 / Notices

meetings@erg.com, subject line: evaluate the latest methods, techniques, ENVIRONMENTAL PROTECTION
Observational Studies. If you need ethical standards, and approaches for AGENCY
technical information about the planned design and implementation of
[FRL–8235–3]
document, please contact Roy observational exposure measurement
Fortmann, National Exposure Research studies and compile a set of state-of-the- Notice of Availability of Final NPDES
Laboratory (NERL); telephone: 919–541– science approaches in a single General Permit for Small Municipal
1021; facsimile: 919–541–0905; e-mail document. Examples of study elements Separate Storm Sewer Systems in the
Fortmann.roy@epa.gov. for which state-of-the-science Commonwealth of Puerto Rico and
SUPPLEMENTARY INFORMATION: approaches will be evaluated and Federal Facilities in the
compiled in the document include Commonwealth of Puerto Rico
Information About the Workshop and
identification of community groups and AGENCY: Environmental Protection
Planned Document
interactions with communities during Agency (EPA).
Observational exposure measurement the scoping and planning of studies,
studies are performed by researchers ACTION: Notice of Final NPDES General
participant recruitment methods, Permits—PRR040000 and PRR04000F.
both within and outside of EPA to informed consent procedures,
measure people’s contact with identification and reporting SUMMARY: The Director of the Caribbean
chemicals in their everyday unanticipated results, communication of Environmental Protection Division
environments during their normal daily (CEPD), Environmental Protection
study results, etc. EPA expects that the
activities. These studies involve Agency-Region 2, is issuing notice for a
final document will be used by EPA
measurements of chemicals in final National Pollutant Discharge
researchers and others in the scientific
environmental media (e.g., air, water, Elimination System (NPDES) general
food, soil, and dust); collection of community to design and perform
observational exposure measurement permit and accompanying response to
information about the voluntary study comments for discharges from small
participants, their homes, their work studies.
municipal separate storm sewer systems
environments, and their activities; and Researchers in NERL intend to work (Small MS4) within urbanized areas to
analysis of voluntary human samples with the public and experts from waters of the Commonwealth of Puerto
such as blood or urine to determine the outside of the Agency to evaluate and Rico. This NPDES general permit
amounts of contact. These observational compile the state-of-the-science establishes Notice of Intent (NOI)
studies do not involve any additional approaches. The Workshop announced requirements, standards, prohibitions
contact with the chemicals being in this Notice is expected to bring and management practices for
studied by the people who volunteer to together experts in the areas of human discharges of storm water from
participate in the studies. EPA’s exposure science, community research, municipal separate storm sewer systems
observational studies generally collect ethics, children’s health, and other within urbanized areas owned by the
information that is critical to meeting relevant disciplines to discuss and Commonwealth of Puerto Rico, or
the goal of improving public health. In compile information that EPA can use to political subdivisions of the
these studies, EPA identifies the develop a draft document. EPA has Commonwealth of Puerto Rico
chemicals that people are coming in asked the Panel to provide (including ‘‘municipios’’), as well as the
contact with; the concentrations of those recommendations on the content of the United States, and other systems located
chemicals; the most important sources document, sources of information for within an urbanized area that fall within
of chemicals in people’s lives; and the document, and an evaluation of the the definition of an MS4. These include,
when, where, how often, and why for example, State departments of
state-of-the-science for approaches for
people come into contact with transportation (DOTs), public
specific elements of the design and
chemicals in the environment. The universities, penitentiaries, military
implementation of observational
information collected in observational installations and similar institutions
exposure measurement studies. Using
studies can be used to better understand with separate storm sewers drainage
potential risks and health effects from information gathered at the Workshop, area. Owners and/or operators of small
chemicals in the environment and to EPA plans to develop a draft document, MS4s that discharge storm water will be
develop risk mitigation strategies and tentatively titled ‘‘State-of-the-Science required to submit a NOI to EPA–CEPD
methods. Approaches for Observational Exposure to be covered by the general permit and
EPA strives to follow the most up-to- Measurement Studies.’’ When will receive a written notification from
date approaches in designing and completed, EPA expects to release the EPA–CEPD of permit coverage and
performing observational studies. These draft document as an external review authorization to discharge under the
approaches are developed by experts in document for public comment. EPA also general permit. The eligibility
both academia and various Federal expects to hire a contractor to conduct requirements are discussed in the
agencies. The approaches evolve over an independent external scientific peer permit. The municipality must meet the
time to meet changing and more review of the draft document. eligibility requirements of the permit
stringent ethical standards and study Availability of the document for public prior to submission of the NOI. This
requirements. EPA wants to ensure that comment and the schedule and location general permit does not cover new
the observational studies conducted by of the independent external peer review sources as defined under 40 CFR 122.2.
the Agency for measuring people’s will be announced in the Federal Publication of this final general permit
contact with environmental chemicals Register. and response to comments complies
continue to be based on the most up-to- with the requirements of 40 Code of
Dated: October 31, 2006.
date sound science and the highest Federal Regulations (CFR) 124.10.
rwilkins on PROD1PC63 with NOTICES

ethical standards. Therefore, there is a Lawrence W. Reiter,


DATES: The effective date of this permit
need to evaluate the latest approaches Director, National Exposure Research is November 6, 2006. The permit will
and ensure that EPA is using the state- Laboratory. expire on November 7, 2011.
of-the-science approaches. In this [FR Doc. E6–18655 Filed 11–3–06; 8:45 am] Public Meeting Information: EPA—
project, EPA intends to review and BILLING CODE 6560–50–P Region 2 has participated in several

VerDate Aug<31>2005 17:31 Nov 03, 2006 Jkt 211001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\06NON1.SGM 06NON1
Federal Register / Vol. 71, No. 214 / Monday, November 6, 2006 / Notices 64953

conference meetings to provide (4) The operator name(s), address(es), (8) An estimate of the square mileage
information about the Storm Water telephone number(s), ownership status, served by the MS4(s);
Phase II program and its requirements. and status as a Federal, State, local, (9) Descriptions of the best
On September 28, 2006, CEPD offered a tribal or other public entity. management practices (BMPs) to be
full day workshop on Small MS4 (Suggestion: This item should identify implemented by the applicant or
requirements and conditions from the names and titles of the primary another entity for each of the six storm
today’s general permit. The workshop administrative and/or technical staff water minimum control measures
included a overview presentation on the contacts for the municipal operator(s), if described in 40 CFR 122.34(b)(1)
storm water program, the conditions of different from item #2.) through (b)(6);
the general permit under Phase 2, the (5) A listing of any permits or (10) Descriptions of the measurable
six minimum requirement that the construction approvals received or goals for each BMPs, including (as
Small MS4 must meet, tools/resources applied for under any of the following appropriate) the months and years in
and a question and answer session. programs: Resource Conservation or which the action will be taken,
Notification Requirements: General Recovery Act; Underground Injection including interim milestones and the
permits for storm water discharges Control under the Safe Drinking Water frequency of the action; and
associated with Small MS4s within an Act; NPDES program under the Clean (11) The person(s) responsible for
urbanized area require the submittal of Water Act; Prevention of Significant implementing or coordinating the
a Notices of Intent (NOI) prior to the Deterioration program under the Clean applicant’s storm water management
authorization of such discharges. Air Act; Nonattainment program under program (SWMP).
the Clean Air Act; the National (Suggestion: Your description of the
Today’s general permit establishes NOI
Emission Standards for Hazardous Air SWMP should identify those measures
requirements to be covered under this
Pollutants preconstruction approval that are already in place or are
permit and must be sent to EPA-Region
under the Clean Air Act, Ocean underway, as well as measures that
2, Caribbean Environmental Protection
Dumping Permits under the Marine remain to be developed or implemented.
Division, Centro Europa Building, Suite As the operator of the MS4, you have
417, 1492 Ponce de Leon Avenue, San Protection Research and Sanctuaries
Act; Dredge or fill permits under section the flexibility to determine the BMPs
Juan, Puerto Rico 00907–4127; Attn: and measurable goals, for each
Sergio Bosques. Municipios, including 404 of the Clean Water Act; or other
relevant environmental permits, minimum control measure, that are
State departments of transportation most appropriate for the system. It is not
(DOTs), public universities, including State permits.
(6) A topographic map (or other map required that all BMPs be fully
penitentiaries, military installations and implemented and in place at the time of
if a topographic map is unavailable)
similar institutions, must submit an NOI application. As stated in 40 CFR
extending one mile beyond the property
and other required information by 122.34(a), EPA will require full
boundaries of the source, depicting the
February 5, 2007. A discharger is not implementation of the applicant’s
facility and each of its intake and
precluded from submitting an NOI at a SWMP no later than the end of the first
discharge structures; each of its
later date. However, EPA may bring permit term (NPDES permits are
hazardous waste treatment, storage, or
appropriate enforcement actions. The typically issued for a 5 year period). The
disposal facilities; each well where
NOI is found in Appendix C of today’s application package should fully
fluids from the facility are injected
general permit and contains the summarize the SWMP that is
underground; and those wells, springs,
following information: anticipated for the area, and should
other surface water bodies, and drinking
(1) Activities by the applicant that acknowledge those BMPs that remain to
water wells listed in public records or
require obtaining an NPDES permit. be developed, including time lines and
otherwise known to the applicant in the
(Suggestion: This item can be map area. milestones for implementation.)
addressed by a statement such as: ‘‘The (Suggestion: A map of the storm sewer Today’s final general permit requires
Applicant Name operates a municipal system(s), showing the location of all all regulated small MS4s to develop and
separate storm sewer system located in outfalls and names and location of all implement a SWMP. Program
(city name)’’.) waters of the United States that receive components include, at a minimum, 6
(2) Name, mailing address, and discharges from those outfalls, is most minimum measures to address: public
location of the facility for which the appropriate for fulfilling this education and outreach; public
application is submitted. requirement. If a map of such detail is involvement; illicit discharge detection
(Suggestion: In the context of the MS4 not available, please include any and elimination; construction site runoff
permitting program, this item should reasonably available version of such a control; post-construction storm water
list the name(s), title(s), affiliation(s), map and a schedule of when such a map management in new development and
mailing address(es), and telephone will be available. (See 40 CFR redevelopment; and pollution
number(s) of the operator(s) of the 122.34(b)(3)(ii)(A) for a description of prevention and good housekeeping of
MS4(s).) the mapping requirement.)) municipal operations. A regulated small
(3) Standard Industrial Classification (7) A brief description of the nature of MS4 is required to submit to CEPD the
(SIC) Code that reflects the service the business. SWMP, and an electronic copy,
provided by the facility. (Suggestion: In the context of the MS4 including the BMPs to be implemented
(Suggestion: Generally speaking, the permitting program, briefly describe the and the measurable goals for each of the
SIC code established by the Federal MS4 in terms of its general minimum control measures listed
Office of Management and Budget for characteristics, such as: capacity, above. After submitting the required
public administration/general Federal, general operation, or other relevant NOI within February 5, 2007, the
State or local government activities is information.) SWMP, including the electronic version
rwilkins on PROD1PC63 with NOTICES

9199. For additional information on SIC The following additional information must be submitted within August 3,
codes, check the Occupational Safety is required as part of an NPDES 2007 to CEPD to the above address.
and Health Administration’s Web site application from regulated small MS4(s) After February 5, 2007, all notified
at: http://www.osha.gov/cgi-bin/sic/ according to 40 CFR 122.33(b)(2)(i) and Small MS4s will have 180 days of their
sicser5.) 40 CFR 122.34(d)(1): notification to submit an NOI and

VerDate Aug<31>2005 17:31 Nov 03, 2006 Jkt 211001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\06NON1.SGM 06NON1
64954 Federal Register / Vol. 71, No. 214 / Monday, November 6, 2006 / Notices

SWMP, including an electronic version storm water management program and Dated: September 21, 2006.
of the information. This shall be also meet permit conditions. EPA believes Carl-Axel P. Soderberg,
submitted to the address specified that the flexibility provided in today’s Director, Caribbean Environmental Protection
above. general permit facilitates watershed Division, Region 2.
FOR FURTHER INFORMATION CONTACT: planning and compliance. Today’s [FR Doc. E6–18643 Filed 11–3–06; 8:45 am]
Additional information concerning the permit requires storm sewer system BILLING CODE 6560–50–P
permit may be obtained between the map, regulatory mechanism to prevent
hours of 8:30 a.m. and 4:30 p.m., illicit discharges, plan to detect and
Monday through Friday, excluding address non-storm water discharges,
holidays, from: Sergio Bosques, education and measurable goals. FEDERAL ELECTION COMMISSION
Caribbean Environmental Protection B. Executive Order 12866 Sunshine Act Meeting Notice
Division, Environmental Protection
Agency, Region 2, Centro Europa EPA has determined that this general DATE & TIME: Thursday, November 9,
Building, Suite 417, 1492 Ponce de Leon permit is not a ‘‘significant regulatory 2006 at 10 a.m.
Avenue, San Juan, Puerto Rico 00907– action’’ under the terms of Executive
4127; telephone: 787–977–5838; e-mail: Order 12866 and is therefore not subject PLACE: 999 E Street, NW., Washington,
bosques.sergio@epa.gov. to OMB review. DC (Ninth Floor).
SUPPLEMENTARY INFORMATION: STATUS: This meeting will be open to the
C. Paperwork Reduction Act public.
A. Statutory and Regulatory History
EPA has reviewed the requirements ITEMS TO BE DISCUSSED:
Section 405 of the Water Quality Act
imposed on regulated facilities resulting Correction and Approval of Minutes.
of 1987 (WQA) added section 402(p) of
from the final construction general Advisory Opinion 2006–30: ActBlue,
the Clean Water Act (CWA), which
permit under the Paperwork Reduction by Jonathan Zucker, Senior Strategist
directed EPA to develop a phased
Act of 1980, 44 U.S.C. 3501 et seq. The and Counsel.
approach to regulate storm water
information collection requirements of Management and Administrative
discharges under the NPDES program.
this proposed permit are similar to other Matters.
EPA published a final regulation on the
Regional general permits which were
second phase of this program on PERSON TO CONTACT FOR INFORMATION:
December 9, 1999, in the Federal previously approved by the Office of
Management and Budget under the Mr. Robert Biersack, Press Officer.
Register, establishing permit application
requirements for ‘‘storm water provisions of the Paperwork Reduction Mary W. Dove,
discharges associated with municipal Act, 44 U.S.C. 3501 et seq., and assigned Secretary of the Commission.
separate storm sewer systems in OMB control numbers. However, [FR Doc. 06–9105 Filed 11–2–06; 2:29 pm]
urbanized areas’’. information collection requirements of BILLING CODE 6715–01–M
EPA believes that this Phase 2 rule this proposed small municipal separate
provides consistency in terms of storm sewer system general permit will
program coverage and requirements for be submitted to OMB for review and
existing and newly designated sources. approval and will be published in a FEDERAL HOUSING FINANCE BOARD
For example, the rule includes most of Federal Register notice.
the municipal donut holes, those MS4s Sunshine Act Meeting Notice;
D. Regulatory Flexibility Act
located in incorporated places, Announcing an Open Meeting of the
townships or towns with a population The Regulatory Flexibility Act (RFA), Board of Directors
under 100,000 that are within Phase I 5 U.S.C. 601 et seq., requires that EPA
counties. These MS4s were not prepare a regulatory flexibility analysis TIME AND DATE: The open meeting of the
addressed by the NPDES storm water for rules subject to the requirements of Board of Directors is scheduled to begin
program until the Phase 2 rule while 5 U.S.C. 553(b) that have a significant at 10 a.m. on Wednesday, November 8,
MS4s in the surrounding county are impact on a substantial number of small 2006.
addressed. In addition, the minimum entities. The permit issued today, PLACE: Board Room, First Floor, Federal
control measures required in the Phase however, is not a ‘‘rule’’ subject to the Housing Finance Board, 1625 Eye
2 rule for regulated small MS4s are very requirements of 5 U.S.C. 553(b) and is Street, NW., Washington, DC 20006.
similar to a number of the permit therefore not subject to the Regulatory STATUS: The meeting will be open to the
requirements for medium and large Flexibility Act. public.
MS4s under the storm water program.
Following the Phase 2 rule, permit E. Unfunded Mandates Reform Act MATTER TO BE CONSIDERED AT THE OPEN
requirements for all regulated MS4s will PORTION: Federal Home Loan Bank of
Section 201 of the Unfunded Chicago Request to Redeem Excess
require implementation of BMPs. Mandates Reform Act (UMRA), Public Stock.
Organization of Today’s Permit Law 104–4, generally requires Federal
agencies to assess the effects of their CONTACT PERSON FOR MORE INFORMATION:
Today’s permit covers storm water Shelia Willis, Paralegal Specialist,
discharges from a wide variety of ‘‘regulatory actions’’ (defined to be the
same as ‘‘rules’’ subject to the RFA) on Office of General Counsel, at 202–408–
conveyances and/or systems within 2876 or williss@fhfb.gov.
urbanized areas in Puerto Rico. Because State and local governments and the
private sector. The permit issued today, Dated: November 8, 2006.
the conditions which affect the presence
rwilkins on PROD1PC63 with NOTICES

of pollutants in storm water discharges however, is not a ‘‘rule’’ subject to the By the Federal Housing Finance Board.
vary among urbanized areas and RFA and is therefore not subject to the John P. Kennedy,
watersheds, today’s general permit requirements of UMRA. General Counsel.
provides broad discretion to the Authority: Clean Water Act, 33 U.S.C. 1251 [FR Doc. 06–9098 Filed 11–2–06; 10:58 am]
permittee to develop and implement a et seq. BILLING CODE 6725–01–P

VerDate Aug<31>2005 17:31 Nov 03, 2006 Jkt 211001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\06NON1.SGM 06NON1

S-ar putea să vă placă și