64698 Federal Register / Vol. 71, No.

213 / Friday, November 3, 2006 / Notices

Filed Date: 10/25/2006. service, please e-mail For further information, contact
Accession Number: 20061027–0008. FERCOnlineSupport@ferc.gov. or call Stephen Bowler at (202) 502–6861 or
Comment Date: 5 p.m. Eastern Time (866) 208–3676 (toll free). For TTY, call stephen.bowler@ferc.gov.
on Wednesday, November 15, 2006. (202) 502–8659.
Docket Numbers: ER07–71–000. Magalie R. Salas,
Applicants: Xcel Energy Services, Inc. Magalie R. Salas, Secretary.
Description: Xcel Energy Services, Secretary. [FR Doc. E6–18539 Filed 11–2–06; 8:45 am]
Inc. on behalf of Northern States Power [FR Doc. E6–18529 Filed 11–2–06; 8:45 am] BILLING CODE 6717–01–P
Co. submits a Transmission Facilities BILLING CODE 6717–01–P
Use Agreement with the City of
Glencoe, MN. DEPARTMENT OF ENERGY
Filed Date: 10/25/2006. DEPARTMENT OF ENERGY
Accession Number: 20061027–0007. Federal Energy Regulatory
Comment Date: 5 p.m. Eastern Time Federal Energy Regulatory Commission
on Wednesday, November 15, 2006. Commission
Any person desiring to intervene or to [Docket No. CP06–464–000]
protest in any of the above proceedings
must file in accordance with Rules 211 [Project Nos. 2149–068 and 2149–075 ANR Pipeline Company; Notice of
and 214 of the Commission’s Rules of Washington] Intent To Prepare an Environmental
Practice and Procedure (18 CFR 385.211 Assessment for the Proposed Storage
and 385.214) on or before 5 p.m. Eastern Public Utility District No. 1 of Douglas
Enhancement Project—2008 and
time on the specified comment date. It County, WA; Notice of Availability of
Request for Comments on
is not necessary to separately intervene Final Environmental Assessment
Environmental Issues
again in a subdocket related to a October 27, 2006.
compliance filing if you have previously October 27, 2006.
intervened in the same docket. Protests In accordance with the National The staff of the Federal Energy
will be considered by the Commission Environmental Policy Act of 1969 and Regulatory Commission (FERC or
in determining the appropriate action to the Federal Energy Regulatory Commission) will prepare an
be taken, but will not serve to make Commission’s (Commission) environmental assessment (EA) that will
protestants parties to the proceeding. regulations, 18 CFR Part 380 (Order No. discuss the environmental impacts of
Anyone filing a motion to intervene or 486, 52 FR 47897), the Office of Energy the Storage Enhancement Project—2008
protest must serve a copy of that Projects has reviewed the application (STEP–2008 Project) involving
document on the Applicant. In reference for amendment of license for a non- construction and operation of facilities
to filings initiating a new proceeding, project use of project lands for the Wells by ANR Pipeline Company (ANR) in
interventions or protests submitted on Hydroelectric Project, located on the Kalkaska County, Michigan. The STEP–
or before the comment deadline need Upper Columbia River in Douglas, 2008 Project would convert the nearly
not be served on persons other than the Okanogan, and Chelan Counties, depleted Cold Springs 1 production
Applicant. Washington, and has prepared a Final reservoir into a gas storage facility.
The Commission encourages Environmental Assessment (FEA) for This notice announces the opening of
electronic submission of protests and the project. the scoping period that will be used to
interventions in lieu of paper, using the The FEA contains the staff’s analysis gather environmental input from the
FERC Online links at http:// of the potential environmental impacts public and interested agencies on the
www.ferc.gov. To facilitate electronic of the non-project use of project lands project. Please note that the scoping
service, persons with Internet access and concludes that approving the period will close on November 28, 2006.
who will eFile a document and/or be amendment, with appropriate This notice is being sent to potentially
listed as a contact for an intervenor environmental protective measures, affected landowners; Federal, State, and
must create and validate an would not constitute a major federal local government agencies; elected
eRegistration account using the action that would significantly affect the officials; environmental and public
eRegistration link. Select the eFiling quality of the human environment. interest groups; Native American Tribes,
link to log on and submit the other interested parties; local libraries
intervention or protests. A copy of the FEA is available for and newspapers. State and local
Persons unable to file electronically review at the Commission in the Public government representatives are asked to
should submit an original and 14 copies Reference Room or may be viewed on notify their constituents of this planned
of the intervention or protest to the the Commission’s Web site at http:// project and encourage them to comment
Federal Energy Regulatory Commission, www.ferc.gov using the ‘‘eLibrary’’ link. on their areas of concern.
888 First St., NE., Washington, DC Enter the docket number excluding the If you are a landowner receiving this
20426. last three digits in the docket number notice, you may be contacted by a
The filings in the above proceedings field to access the document. For pipeline company representative about
are accessible in the Commission’s assistance, contact FERC Online the acquisition of an easement to
eLibrary system by clicking on the Support at FERCOnlineSupport@ construct, operate, and maintain the
appropriate link in the above list. They ferc.gov or toll-free at 1–866–208–3676, proposed facilities. The pipeline
are also available for review in the or for TTY, (202) 502–8659. company would seek to negotiate a
Commission’s Public Reference Room in You may also register online at mutually acceptable agreement.
mstockstill on PROD1PC68 with NOTICES

Washington, DC. There is an http://www.ferc.gov/docs-filing/ However, if the project is approved by


eSubscription link on the Web site that esubscription.asp to be notified via e- the Commission, that approval conveys
enables subscribers to receive e-mail mail of new filings and issuances with it the right of eminent domain.
notification when a document is added related to this or other pending projects. Therefore, if easement negotiations fail
to a subscribed dockets(s). For For assistance, contact FERC Online to produce an agreement, the pipeline
assistance with any FERC Online Support. company could initiate condemnation

VerDate Aug<31>2005 15:24 Nov 02, 2006 Jkt 211001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\03NON1.SGM 03NON1
Federal Register / Vol. 71, No. 213 / Friday, November 3, 2006 / Notices 64699

proceedings in accordance with State 12.7 acres for both construction and Currently Identified Environmental
law. operation on land that has been Issues
A fact sheet prepared by the FERC previously disturbed. The proposed In the EA, we will discuss impacts
entitled ‘‘An Interstate Natural Gas Cold Springs 1 storage field boundary that could occur as a result of the
Facility On My Land? What Do I Need would encompass about 810 acres, construction and operation of the
To Know?’’ is available for viewing on including 155 acres within the reservoir project. We will also evaluate possible
the FERC Internet Web site (http:// proper and about 655 acres of buffer alternatives to the proposed project or
www.ferc.gov). This fact sheet addresses area. Construction of the proposed portions of the project.
a number of typically asked questions, facilities would occur on land currently We have already identified some
including the use of eminent domain owned by ANR or on state land that issues that we think deserve attention
and how to participate in the
ANR plans to purchase. based on a preliminary review of the
Commission’s proceedings.
proposed facilities and environmental
Summary of the Proposed Project 1 The EA Process information provided by ANR. This
To achieve the conversion of the The National Environmental Policy preliminary list of issues may be
nearly depleted Cold Springs 1 Act (NEPA) requires the Commission to changed based on your comments and
production reservoir into a gas storage take into account the environmental our analysis.
facility and to provide the increased impacts that could result from an action • Potential noise levels due to the
deliverability, ANR proposes to drill six operation of the compressor stations;
whenever it considers the issuance of a
new injection/withdrawal wells, and
Certificate of Public Convenience and
construct a 7,000-horsepower • Conversion of about 13.5 acres of
Necessity. The EA will be used by the
compressor station, install a 500-foot- state owned land to private land.
Commission in its decision-making
long gathering pipeline, install 700 feet process to determine whether the Public Participation
of 20-inch-diameter transmission project is in the public convenience and You can make a difference by
pipeline, install a 500-foot-long liquid necessity. NEPA also requires us 3 to providing us with your specific
re-injection pipeline, and convert the discover and address concerns the comments or concerns about the project.
existing State Blue Lake No. 1–6 Well to public may have about proposals to be By becoming a commenter, your
an observation well. An existing 2.4-
considered by the Commission. This concerns will be addressed in the EA
mile-long, 24-inch-diameter pipeline
process is referred to as ‘‘scoping’’. The and considered by the Commission.
would connect the storage field to
main goal of the scoping process is to Your comments should focus on the
ANR’s interstate pipeline system. The
focus the analysis in the EA on the potential environmental effects of the
STEP–2008 Project would provide 14.7
important environmental issues. By this proposal, reasonable alternatives to the
billion cubic feet of incremental storage
Notice of Intent, the Commission staff proposal (including alternative locations
capacity and increased deliverability to
requests public comments on the scope and routes), and measures to avoid or
satisfy the market demand for storage
of the issues to address in the EA. All lessen environmental impact. The more
services. The maximum reservoir
comments received are considered specific your comments, the more useful
pressure would be 4,680 pounds per
during the preparation of the EA. they will be. Please carefully follow
square inch absolute at the base of the
these instructions to ensure that your
caprock which is about 6,500 feet deep. By this notice, we are also asking
The general location of ANR’s comments are received in time and
Federal, State, and local agencies with properly recorded:
proposed facilities is shown on the map jurisdiction and/or special expertise
attached as Appendix 1.2 • Send an original and two copies of
with respect to environmental issues to your letter to: Magalie R. Salas,
Land Requirements for Construction formally cooperate with us in the Secretary, Federal Energy Regulatory
Construction and operation of ANR’s preparation of the EA. Agencies that Commission, 888 First St., NE., Room
proposed facilities would require about would like to request cooperating status 1A, Washington, DC 20426.
26.2 acres of land. The amount of land should follow the instructions for filing • Label one copy of the comments for
required for installation of the new comments below (see Public the attention of Gas Branch 1;
wells, connecting pipelines, and access Participation). • Reference Docket No. CP06–464–
roads would be about 13.5 acres. Our independent analysis of the 000; and
Following construction, about 2.4 acres issues will be included in the EA. • Mail your comments so that they
would be maintained as graveled well Depending on the comments received will be received in Washington, DC on
pads and access roads, and the during the scoping process, the EA may or before November 28, 2006.
remaining 11.1 acres would be be published and mailed to Federal, Please note that the Commission
maintained as herbaceous cover along strongly encourages electronic filing of
State, and local agencies, public interest
the pipeline rights-of-way. The any comments or interventions or
groups, interested individuals, affected
compressor station would require about protests to this proceeding. See 18 CFR
landowners, newspapers, libraries, and 385.2001(a)(1)(iii) and the instructions
1 ANR’s application was filed with the
the Commission’s official service list for on the Commission’s Web site at
Commission under section 7 of the Natural Gas Act this proceeding. A comment period will http://www.ferc.gov under the ‘‘e-
and Part 157 of the Commission’s regulations. be allotted for review if the EA is Filing’’ link and the link to the User’s
2 The appendices referenced in this notice are not published. We will consider all Guide. Before you can file comments
being printed in the Federal Register. Copies of all comments on the EA before we make
appendices, other than Appendix 1 (maps), are you will need to create an account
mstockstill on PROD1PC68 with NOTICES

avaialble on the Commission’s Web site at the our recommendations to the which can be created on-line.
‘‘eLibary’’ link or from the Commission’s Public Commission.
Reference Room, 888 First Street, NE., Washington, Becoming an Intervenor
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibary refer to the last page of 3 ‘‘We’’,
‘‘us’’, and ‘‘our’’, refer to the In addition to involvement in the EA
this notice. Copies of the appendices were sent to environmental staff of the Office of Energy Projects scoping process, you may want to
all those receiving this notice in the mail. (OEP). become an official party to the

VerDate Aug<31>2005 15:24 Nov 02, 2006 Jkt 211001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\03NON1.SGM 03NON1
64700 Federal Register / Vol. 71, No. 213 / Friday, November 3, 2006 / Notices

proceeding, or ‘‘intervenor’’. To become FERC Online Support at Street, NE., Washington, DC 20426.
an intervenor you must file a motion to FERCOnlineSupport@ferc.gov or toll Please include the project number (P–
intervene according to Rule 214 of the free at 1–866–208–3676, or for TTY, 12740–000) on any comments, protests,
Commission’s Rules of Practice and contact (202) 502–8659. The eLibrary or motions filed.
Procedure (18 CFR 385.214). Intervenors link also provides access to the texts of k. Description of Project: The
have the right to seek rehearing of the formal documents issued by the proposed project would utilize the
Commission’s decision. Motions to Commission, such as orders, notices, existing U.S. Army Corps of Engineers’
Intervene should be electronically and rulemakings. Flannagan Dam and would consist of:
submitted using the Commission’s In addition, the Commission now (1) A proposed penstock; (2) a proposed
eFiling system at http://www.ferc.gov. offers a free service called eSubscription powerhouse containing one generating
Persons without Internet access should which allows you to keep track of all unit with an installed capacity of 5,000-
send an original and 14 copies of their formal issuances and submittals in kilowatts; (3) a proposed transmission
motion to the Secretary of the specific dockets. This can reduce the line; and (4) appurtenant facilities. The
Commission at the address indicated amount of time you spend researching proposed project would have an
previously. Persons filing Motions to proceedings by automatically providing estimated annual generation of
Intervene on or before the comment you with notification of these filings, approximately 17-gigawatts. The
deadline indicated above must send a document summaries and direct links to applicant plans to sell the generated
copy of the motion to the Applicant. All the documents. Go to http:// energy.
filings, including late interventions, www.ferc.gov/esubscribenow.htm. l. Location of Application: A copy of
submitted after the comment deadline the application is available for
must be served on the Applicant and all Magalie R. Salas, inspection and reproduction at the
other intervenors identified on the Secretary. Commission in the Public Reference
Commission’s service list for this [FR Doc. E6–18540 Filed 11–2–06; 8:45 am] Room, located at 888 First Street, NE.,
proceeding. Persons on the service list BILLING CODE 6717–01–P Room 2A, Washington, DC 20426, or by
with e-mail addresses may be served calling (202) 502–8371. This filing may
electronically; others must be served a also be viewed on the Commission’s
hard copy of the filing. DEPARTMENT OF ENERGY Web site at http://www.ferc.gov using
Affected landowners and parties with the ‘‘eLibrary’’ link. Enter the docket
environmental concerns may be granted Federal Energy Regulatory number excluding the last three digits in
intervenor status upon showing good Commission the docket number field to access the
cause by stating that they have a clear document. For assistance, call toll-free
Notice of Application Accepted for 1–866–208–3676 or e-mail
and direct interest in this proceeding
which would not be adequately Filing and Soliciting Motions To FERCOnlineSupport@ferc.gov. For TTY,
represented by any other parties. You do Intervene, Protests and Comments call (202) 502–8659. A copy is also
not need intervenor status to have your October 27, 2006. available for inspection and
environmental comments considered. Take notice that the following reproduction at the address in item h
hydroelectric application has been filed above.
Environmental Mailing List m. Individuals desiring to be included
with the Commission and is available
An effort is being made to send this for public inspection: on the Commission’s mailing list should
notice to all individuals, organizations, a. Type of Application: Preliminary so indicate by writing to the Secretary
and government entities interested in Permit. of the Commission.
and/or potentially affected by the b. Project No.: 12740–000. n. Competing Preliminary Permit—
proposed project. This includes all c. Date filed: September 18, 2006. Anyone desiring to file a competing
landowners who are potential right-of- d. Applicant: Hydro Matrix Limited application for preliminary permit for a
way grantors, whose property may be Partnership. proposed project must submit the
used temporarily for project purposes, e. Name of Project: Flannagan competing application itself, or a notice
or who own homes within distances Hydroelectric Project. of intent to file such an application, to
defined in the Commission’s regulations f. Location: On the Pound River, in the Commission on or before the
of certain aboveground facilities. If you Dickenson County, Virginia. The specified comment date for the
wish to remain on our environmental Flannagan Dam is owned and particular application (see 18 CFR 4.36).
mailing list, please return the maintained by the U.S. Army Corps of Submission of a timely notice of intent
Information Request form included in Engineers. allows an interested person to file the
Appendix 2. If you do not return this g. Filed Pursuant to: Federal Power competing preliminary permit
form, you will be removed from our Act, 16 U.S.C. 791(a)–825(r). application no later than 30 days after
mailing list. h. Applicant Contact: Mr. James B. the specified comment date for the
Price, PhD, President, W.V. Hydro, Inc. particular application. A competing
Additional Information preliminary permit application must
Partner, P.O. Box 5550, Aiken, SC
Additional information about the 29804, (803) 642–2749, conform with 18 CFR 4.30(b) and 4.36.
project is available from the jimpricehydro@bellsouth.net. o. Competing Development
Commission’s Office of External Affairs, i. FERC Contact: Patricia W. Gillis at Application—Any qualified
at 1–866–208–FERC or on the FERC (202) 502–8735. development applicant desiring to file a
Internet Web site (http://www.ferc.gov) j. Deadline for filing comments, competing development application
using the eLibrary link. Click on the protests, and motions to intervene: 60 must submit to the Commission, on or
mstockstill on PROD1PC68 with NOTICES

eLibrary link, click on ‘‘General Search’’ days from the issuance date of this before a specified comment date for the
and enter the docket number excluding notice. particular application, either a
the last three digits in the Docket All documents (original and eight competing development application or a
Number field (i.e., CP06–464). Be sure copies) should be filed with Magalie R. notice of intent to file such an
you have selected an appropriate date Salas, Secretary, Federal Energy application. Submission of a timely
range. For assistance, please contact Regulatory Commission, 888 First notice of intent to file a development