Sunteți pe pagina 1din 2

Federal Register / Vol. 71, No.

211 / Wednesday, November 1, 2006 / Notices 64331

DEPARTMENT OF TRANSPORTATION Issued in Washington, DC on October 25, Manager, Federal Highway


2006. Administration, Jackson Federal
Federal Aviation Administration Eve Taylor Adams, Building, 915 2nd Avenue, Room 3142,
[Summary Notice No. PE–2006–38] Acting Director, Office of Rulemaking. Seattle, Washington, 98174; telephone:
(206) 220–7536; and e-mail:
Petitions for Exemption
Petitions for Exemption; Summary of Steve.Boch@fhwa.dot.gov. The FHWA
Petitions Received Docket No.: FAA–2006–25888. Washington Division’s Oversight
Petitioner: United Airlines. Manager’s regular office hours are
AGENCY: Federal Aviation Section of 14 CFR Affected: 14 CFR between 8 a.m. and 4:30 p.m. (Pacific
Administration (FAA), DOT. Part 43 Appendix A. Time). You may also contact Allison
ACTION: Notice of petitions for Description of Relief Sought: The Ray, I–405 Environmental Manager,
exemption received. exemption, if granted, would allow Washington State Department of
United to classify repairs and alterations Transportation, 600–108th Avenue NE.,
SUMMARY: Pursuant to FAA’s rulemaking using decision diagrams based on 14
provisions governing the application, Suite 405, Bellevue, Washington, 98004;
CFR 1.1 rather than 14 CFR part 43 telephone: (425) 456–8500; and e-mail:
processing, and disposition of petitions Appendix A.
for exemption part 11 of Title 14, Code rayalli@wsdot.wa.gov. The I–405
Docket No.: FAA–2006–25888. Corridor Program’s regular office hours
of Federal Regulations (14 CFR), this Petitioner: American Airlines, Inc.
notice contains a summary of certain are between 8 a.m. and 5 p.m. (Pacific
Section of 14 CFR Affected: 14 CFR Time).
petitions seeking relief from specified Part 43 Appendix A.
requirements of 14 CFR. The purpose of Description of Relief Sought: The SUPPLEMENTARY INFORMATION: Notice is
this notice is to improve the public’s exemption, if granted, would allow hereby given that the FHWA and other
awareness of, and participation in, this American Airlines to determine the Federal agencies have taken final agency
aspect of FAA’s regulatory activities. major or minor classification of a repair actions by issuing licenses, permits, and
Neither publication of this notice nor or alteration using methodology based approvals for the I–405 Corridor from
the inclusion or omission of information on the definitions for major repair and the interchange with Interstate 5 in
in the summary is intended to affect the major alteration given in part 43 Tukwila to the interchange with
legal status of any petition or its final Appendix A. Interstate 5 in Lynnwood and related I–
disposition. 405 Corridor Program projects in King
[FR Doc. E6–18394 Filed 10–31–06; 8:45 am]
DATES: Comments on petitions received and Snohomish Counties, Washington.
BILLING CODE 4910–13–P
must identify the petition docket Corridor improvements, phased over the
number involved and must be received next 20 to 30 years based on the
on or before November 21, 2006. DEPARTMENT OF TRANSPORTATION availability of funding, include adding
ADDRESSES: You may submit comments up to two new lanes in each direction
(identified by DOT DMS Docket Number Federal Highway Administration to I–405, a corridor-wide bus rapid
FAA–2006–25888 or FAA–2006–26060) transit system and increased local
by any of the following methods: Notice of Final Federal Agency Actions transit. Corridor improvements also
• Web Site: http://dms.dot.gov. on Proposed Highways in Washington include improving the SR 167/I–405
Follow the instructions for submitting interchange and some key arterials,
comments on the DOT electronic docket AGENCY: Federal Highway expanding transit centers, adding
site. Administration (FHWA), DOT. approximately 5,000 park-and-ride
• Fax: 1–202–493–2251. ACTION: Notice of Limitation on Claims spaces, and providing improved and
• Mail: Docket Management Facility; for Judicial Review of Actions by FHWA new pedestrian / bicycle connections.
U.S. Department of Transportation, 400 and Other Federal Agencies.
The actions by the Federal agencies
Seventh Street, SW., Nassif Building, on this project, and the laws under
SUMMARY: This notice announces actions
Room PL–401, Washington, DC 20590– which such actions were taken, are
001. taken by the FHWA and other Federal
agencies that are final within the described in the corridor-level final
• Hand Delivery: Room PL–401 on
meaning of 23 U.S.C. 139(l)(1)–(2). The environmental impact statement (FEIS),
the plaza level of the Nassif Building,
actions relate to various proposed Record of Decision (ROD), in project-
400 Seventh Street, SW., Washington,
level environmental assessments (EA)
DC, between 9 a.m. and 5 p.m., Monday transit and road improvement projects
and Finding of No Significant Impact
through Friday, except Federal holidays. within the Interstate 405 (I–405)
Corridor in the State of Washington. (FONSI), and a documented categorical
Docket: For access to the docket to
Those actions grant licenses, permits, exclusion (CE), and in other documents
read background documents or
and approvals for the projects. in the FHWA administrative record for
comments received, go to http://
the project. The FEIS, EAs, CE, and
dms.dot.gov at any time or to Room PL– DATES: By this notice, the FHWA is
advising the public of final agency other documents from the FHWA
401 on the plaza level of the Nassif
actions subject to 23 U.S.C. 139(l)(1)– administrative record files for the listed
Building, 400 Seventh Street, SW.,
(2). A claim seeking judicial review of projects are available by contacting the
Washington, DC, between 9 a.m. and 5
the Federal agency actions on any of the FHWA or the Washington State
p.m., Monday through Friday, except
listed highway projects will be barred Department of Transportation at the
Federal holidays.
unless the claim is filed on or before addresses provided above.
FOR FURTHER INFORMATION CONTACT:
Susan Lender (202) 267–8029 or Frances April 30, 2007. If the Federal law that This notice applies to all Federal
Shaver (202) 267–9681, Office of authorizes judicial review of a claim agency decisions on the listed projects
sroberts on PROD1PC70 with NOTICES

Rulemaking (ARM–1), Federal Aviation provides a time period of less than 180 as of the issuance date of this notice and
Administration, 800 Independence days for filing such claim, then that all laws under which such actions were
Avenue, SW., Washington, DC 20591. shorter time period still applies. taken, including but not limited to:
This notice is published pursuant to FOR FURTHER INFORMATION CONTACT: 1. General: National Environmental
14 CFR 11.85 and 11.91. Stephen Boch, Major Project Oversight Policy Act [42 U.S.C. 4321–4351];

VerDate Aug<31>2005 17:36 Oct 31, 2006 Jkt 211001 PO 00000 Frm 00095 Fmt 4703 Sfmt 4703 E:\FR\FM\01NON1.SGM 01NON1
64332 Federal Register / Vol. 71, No. 211 / Wednesday, November 1, 2006 / Notices

Federal-Aid Highway Act [23 U.S.C. Indian Tribal Governments; E.O. 11514 auxiliary lane, a new three-lane
109]. Protection and Enhancement of southbound structure over I–90 and
2. Air: Clean Air Act, as amended [42 Environmental Quality; E.O. 13112 converting the existing southbound
U.S.C. 7401–7671(q)]. Invasive Species. structure to a northbound HOV lane.
3. Land: Section 4(f) of the The projects subject to this notice are: NEPA document: DCE, signed June 9,
Department of Transportation Act of 1. Project Location: Tukwila, Renton, 2006.
1966 [49 U.S.C. 303]; Landscaping and Newcastle, Bellevue, Kirkland, Bothell,
(Catalog of Federal Domestic Assistance
Scenic Enhancement (Wildflowers) [23 and Lynnwood; King and Snohomish Program Number 20.205, Highway Planning
U.S.C. 319]. Counties; I–405. Project Reference and Construction. The regulations
4. Wildlife: Endangered Species Act Number: STP 4053(840). Project type: implementing Executive Order 12372
[16 U.S.C. 1531–1544]; Anadromous The ‘‘I–405 Corridor Program’’ consists regarding intergovernmental consultation on
Fish Conservation Act [16 U.S.C. of multi-modal improvements along the Federal programs and activities apply to this
757(a)–757(g)]; Fish and Wildlife approximate 30-mile corridor of I–405. program.)
Coordination Act [16 U.S.C. 661– NEPA document: Corridor-level FEIS, Authority: 23 U.S.C. 139(l)(1)–(2).
667(d)]; Magnuson-Stevenson Fishery June 2002; Record of Decision (ROD), Issued on: October 26, 2006.
Conservation and Management Act of October 9, 2002.
Stephen P. Boch,
1976, as amended [16 U.S.C. 1801 et 2. Project Location: Bellevue,
seq.]. Kirkland and Bothell; King County; I– Major Project Oversight Manager, Seattle,
5. Historic and Cultural Resources: 405. Project Reference Number: Since Washington.
Section 106 of the National Historic federal funding is not currently [FR Doc. E6–18369 Filed 10–31–06; 8:45 am]
Preservation Act of 1966, as amended available for this project, an FHWA BILLING CODE 4910–RY–P
[16 U.S.C. 470(f) et seq.]; Archaeological project number has not been
Resources Protection Act of 1977 [16 established. Project type: The ‘‘I–405 SR
U.S.C. 470(aa)–11]; Archaeological and 520 to SR 522—Kirkland Nickel Project’’ DEPARTMENT OF TRANSPORTATION
Historic Preservation Act [16 U.S.C. is located along a 7.6-mile section of I–
Federal Transit Administration
469–469(c)]; Native American Grave 405 between SR 520 and SR 522. It
Protection and Repatriation Act [25 consists of a new northbound general- Preparation of an Environmental
U.S.C. 3001–3013]. purpose lane on I–405 from the NE 70th Impact Statement for the Dumbarton
6. Social and Economic: Civil Rights Street interchange to the NE 124th Rail Corridor Project in the Southern
Act of 1964 [42 U.S.C. 2000(d)– Street interchange, a new southbound Portion of the San Francisco Bay Area,
2000(d)(1)]; American Indian Religious general-purpose lane from just south of CA
Freedom Act [42 U.S.C. 1996]; Farmland the SR 522 interchange to just north of
Protection Policy Act [7 U.S.C. 4201– the SR 520 interchange, and AGENCY: Federal Transit Administration
4209]; the Uniform Relocation reconfiguration of the interchange at NE (FTA), Department of Transportation
Assistance and Real Property 116th Street to improve traffic (DOT).
Acquisition Policies Act of 1970, as operations. NEPA document: EA, ACTION: Notice of Intent (NOI) to prepare
amended [42 U.S.C. 61]. February 2005; Finding of No Environmental Impact Statement (EIS).
7. Wetlands and Water Resources: Significant Impact (FONSI), signed
Clean Water Act, 33 U.S.C. 1251–1377 April 14, 2005. SUMMARY: The Federal Transit
(Section 404, Section 401, Section 319); 3. Project Location: Bellevue, King Administration and the Peninsula
Coastal Zone Management Act [16 County, I–405. Project Reference Corridor Joint Powers Board (PCJPB) are
U.S.C. 1451–1465]; Land and Water Number: Since federal funding is not planning to prepare an Environmental
Conservation Fund [16 U.S.C. 4601– currently available for this project, an Impact Statement/Environmental
4604]; Safe Drinking Water Act [42 FHWA project number has not been Impact Report for the Dumbarton Rail
U.S.C. 300(f)–300(j)(6)]; Rivers and established. Project type: The ‘‘I–405 Corridor (DRC) Project, an
Harbors Act of 1899 [33 U.S.C. 401– Bellevue Nickel Improvement Project— approximately 21-mile commuter rail
406]; TEA–21 Wetlands Mitigation [23 I–90 to Southeast 8th Street’’ extends extension on existing rail alignment to
U.S.C. 103(b)(6)(m), 133(b)(11)]; Flood along a 2-mile section of I–405 between provide commuter rail service between
Disaster Protection Act [42 U.S.C. 4001– I–90 and SE 8th Street. It consists of one the Peninsula and the East Bay across
4128]. new general-purpose lane in each the southern part of the San Francisco
8. Hazardous Materials: direction along I–405 and extends the Bay. The EIS will be prepared in
Comprehensive Environmental existing outside southbound HOV lane accordance with regulations
Response, Compensation, and Liability north from I–90 near the Wilburton implementing the National
Act [42 U.S.C. 9601–9675]; Superfund tunnel to SE 8th Street. NEPA Environmental Policy Act (NEPA) as
Amendments and Reauthorization Act document: EA, January 2006; Finding of well as provisions of the recently
of 1986 [PL 99–499]; Resource No Significant Impact (FONSI), signed enacted Safe, Accountable, Flexible,
Conservation and Recovery Act [42 August 11, 2006. Efficient Transportation Equity Act: A
U.S.C. 6901–6992(k)]. 4. Project Location: Bellevue, King Legacy for Users. The purpose of this
9. Executive Orders: E.O. 11990 County, I–405. Project Reference Notice of Intent is to alert interested
Protection of Wetlands; E.O. 11988 Number: Since federal funding is not parties regarding the plan to prepare the
Floodplain Management; E.O. 12898, currently available for this project, an EIS, to provide information on the
Federal Actions to Address FHWA project number has not been proposed transit project, to invite
Environmental Justice in Minority established. Project type: The ‘‘I–405, participation in the EIS process,
Populations and Low Income 112th Ave SE to I–90 Widening Project’’ including comments on the scope of the
sroberts on PROD1PC70 with NOTICES

Populations; E.O. 11593 Protection and extends along a 2-mile section of I–405 EIS proposed in this notice, and to
Enhancement of Cultural Resources; starting at the I–405 and 112th Ave SE announce that public scoping meetings
E.O. 13007 Indian Sacred Sites; E.O. interchange and extending to just north will be conducted.
13287 Preserve America; E.O. 13175 of the I–90 and I–405 interchange. It DATES: Written comments on the scope
Consultation and Coordination with consists of one new northbound of the EIS should be sent to Marie Pang,

VerDate Aug<31>2005 17:36 Oct 31, 2006 Jkt 211001 PO 00000 Frm 00096 Fmt 4703 Sfmt 4703 E:\FR\FM\01NON1.SGM 01NON1

S-ar putea să vă placă și