MICROWAVE INSTALLATION
PROCEDURE v1.1
PT INDOSAT Tbk
PT Indosat Tbk
Approved by:
Approved By:
Name :
Date :
Name :
Date :
REVISION HISTORY
Date
Revision
Description
Authors
2015/Jan/19
V1.0
Initial draft
Toni Riyanto
2015/Feb/17
V1.1
2015/Feb/17
V1.1
2015/Feb/17
V1.1
2015/Feb/17
V1.1
MW installation configuration
Toni Riyanto
2015/Feb/17
V1.1
IP Communication parameter
Toni Riyanto
site
Table of Contents
1. Preparation.....................................................................................................................................3
2. Safety Equipment ..........................................................................................................................4
3. Outdoor Installation ......................................................................................................................5
3.1 MW Antenna 0.3m 0.6m .....................................................................................................5
3.1.1 Antenna Installation Condition ....................................................................................5
3.1.2 Inspection of antenna accessories ..............................................................................5
3.1.3 Hanging Bracket Assembly .......................................................................................6
3.1.4 Antenna Installation Manner .......................................................................................7
3.1.5 Anti-Fall Clamp Installation .........................................................................................7
3.1.6 Hanging Bracket Installation .......................................................................................8
3.1.7 Antenna Polarization ...................................................................................................8
3.2 MW Antenna 1.8m .................................................................................................................9
3.2.1 Cheking Parts of Antenna ...........................................................................................9
3.2.2 Fixing Hanging Bracket to Reflector ........................................................................ 10
3.2.3 Installation of Adjustable Rod................................................................................... 11
3.2.4 Antenna Polarization Adjustment ............................................................................. 11
3.2.5 Antenna Adjustment ................................................................................................. 12
3.3 MW Antenna 2.4m .............................................................................................................. 13
3.3.1 Cheking Parts of Antenna ........................................................................................ 13
3.3.2 Fixing Hanging Bracket to Reflector ........................................................................ 14
3.3.3 Antenna Polarization Adjustment ............................................................................. 15
3.3.4 Installation of Adjustable Rod................................................................................... 15
3.3.5 Antenna Adjustment ................................................................................................. 16
3.4 ODU/ Hybrid Coupler/ Waveguide ...................................................................................... 17
3.4.1 ODU ......................................................................................................................... 17
3.4.1.1 Appearance and Interfaces of the ODU ................................................................ 17
3.4.1.2 Appearance and Interfaces of the OptiX RTN 310 ODU ...................................... 17
3.4.1.3 Installation the ODU on Dual-Polarized Antenna .......................................... 18
3.4.2 Hybrid Coupler ......................................................................................................... 18
3.4.2.1 Appearance and Interfaces of the Hybrid Coupler ................................................ 18
3.4.2.2 Changing the Polarization Direction of the Hybrid Coupler .................................. 19
3.4.3 Waveguide ............................................................................................................... 19
3.4.3.1 Appearance of the Flexible Waveguide ................................................................ 19
3.4.3.2 Installing the Flexible Waveguide ......................................................................... 20
3.4.3.3 Installing Guide for the Flexible Guide Fixture ...................................................... 21
3.4.3.4 Fixing the Flexible Waveguide Fixture on the Pole ............................................... 21
4. Indoor Installation ...................................................................................................................... 23
4.1 Installing the Chassis in the 19-Inch Cabinet ..................................................................... 23
4.1.1 OptiX RTN 310 ......................................................................................................... 23
4.1.2 OptiX RTN 950A ...................................................................................................... 24
4.1.3 OptiX RTN 980 ......................................................................................................... 26
4.2 Connector Installation ......................................................................................................... 27
4.2.1 Terminating the TNC Connector .............................................................................. 27
4.2.2 Terminating the N Connector ................................................................................... 29
4.2.3 Terminating the RJ45 Connector ............................................................................. 30
4.2.4 Assemble P&E Cables ............................................................................................. 31
4.2.5 Assemble OT Terminal and Power Cable ................................................................ 34
4.2.6 Assemble Cord End Terminal and Power Cable ..................................................... 35
5. Cable Installation ........................................................................................................................ 36
5.1 Cable Connection ............................................................................................................... 36
5.2 Installing OptiX RTN 310 PGND Cable .............................................................................. 37
ii
1. Preparation
1.1 Be sure to wear a company uniform, wearing Huawei Pass ID, a letter of
assignment from Huawei, and certification of each personnel.
1.2 Make sure Permit for entry to the site is ok.
1.3 Make sure Lock site and site address is ok.
1.4 Be sure to bring technical documents such as Engineering Design, BOQ, Delivery
Note, and installation guide.
1.5 Be sure to bring and use safety equipment and bring P3K supplies.
1.6 Be sure to bring equipment and measuring installations are complete.
Page 3, Total 63
2. Safety Equipment
Page 4, Total 63
3. Outdoor Installation
3.1 MW Antenna 0.3m 0.6m
3.1.1 Antenna Installation Condition
Antenna could be mounted on diameter of 60~ 110mm vertical mounting pipe
Page 5, Total 63
Page 6, Total 63
Page 7, Total 63
Page 8, Total 63
Page 9, Total 63
ODU
3.4.2
Hybrid Coupler
3.4.3 Waveguide
3.4.3.1 Appearance of the Flexible Waveguide
4. Indoor Installation
4.1 Installing the Chassis in the 19-Inch Cabinet
4.1.1
4.1.2
4.1.3
i. Place the first IDU in the top position, if there is a second IDU place
beneath distance between IDU 1U.
ii. Install IDU grounding cable and connect to ground point on the cabinet.
iii. Install IDU power cable and connect to the power supply. Number of IDU
power cable base on BOQ.
iv. Install IF cable base on IDU cable layout.
v. Install ethernet service LAN cable for 2G/3G traffic:
a. GE port on the Power Injector (PI) of RTN310.
b. GE4 port on CSHO of RTN950A.
c. FE4 port on EM6Fof RTN980.
View of coaxial cable from ODU to IDU inside outdoor service cabinet
View of IP LAN cable from IDU to BBU inside outdoor service cabinet
4.3.4 Ground kit for IF cable and ODU installed based on requirement
4.3.5 Waterproof and anticorrosive measures must be adopted for outdoor equip
4.3.6 IDU installed following site engineering design
i.
ii.
iii.
Fit clamp 2
a. Fold back the braided shield to cover clamp 1.
b. Tidy the braided shield and use clamp 2 to bind the braided shield.
c. Cut the redundant part of the shielding layer.
iv.
Use the electric knife to strip back the dialectric insulating layer in front of
clamp 2. During the operation, the exposed cable wire should be 6 mm
long.
v.
vi.
Connect the connector and the lock nut. Use a wrench to tighten the
connection. Use a wrench to rotate the lock nut and another wrench to
position the body of the connector. The recommended torque is 152 N.m.
4.2.2
4.2.3
a. Straight Cable
b. Crossover Cable
4.2.4
i.
ii.
4.2.5
4.2.6
5. Cable Installation
5.1
Cable Connections
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
b. In non-MetroE sites
5.11
Installing Fiber
5.12
Routing IF Cable
IF CABLE
IF CABLE
5.13
5.14
Connect PGND cable of the ODU to nearest grounding bar at below of the
antenna. No ODU grounding to any tower Legs, it is not allowed
5.15
Rooftop
6. Labeling
6.1 Antenna
6.1.1
6.1.2
Standard_Label
MW_20120219.xlsx
6.2 ODU
6.2.1
1+0 configuration
6.2.2
Std by
6.2.3
2 +0 protection configuration
Main 1
Main 2
6.3 Cable
6.3.1
6.3.2
IF Cable
1+0 configuration
6.3.3
6.3.4
6.3.5
E1 Cable
6.3.6
Optical Cable
6.4 IDU
6.5 DCPDB