Sunteți pe pagina 1din 63

Microwave Installation Procedure v1.

MICROWAVE INSTALLATION
PROCEDURE v1.1

OptiX RTN 310 and OptiX RTN 900

PT INDOSAT Tbk

PT. Huawei Tech. Investment

PT Indosat Tbk

Approved by:

Approved By:

Name :
Date :

Name :
Date :

Huawei Tech Investment


Team

Microwave Installation Procedure v1.1

REVISION HISTORY
Date

Revision

Description

Authors

2015/Jan/19

V1.0

Initial draft

Toni Riyanto

2015/Feb/17

V1.1

Installing the IDU chassis on outdoor Toni Riyanto


cabinet guideline

2015/Feb/17

V1.1

Define which MetroE


non-MetroE site

2015/Feb/17

V1.1

Use feeder clamp to fix IF cable on Toni Riyanto


the ladder

2015/Feb/17

V1.1

MW installation configuration

Toni Riyanto

2015/Feb/17

V1.1

IP Communication parameter

Toni Riyanto

site

and Toni Riyanto

Microwave Installation Procedure V1.1

Table of Contents
1. Preparation.....................................................................................................................................3
2. Safety Equipment ..........................................................................................................................4
3. Outdoor Installation ......................................................................................................................5
3.1 MW Antenna 0.3m 0.6m .....................................................................................................5
3.1.1 Antenna Installation Condition ....................................................................................5
3.1.2 Inspection of antenna accessories ..............................................................................5
3.1.3 Hanging Bracket Assembly .......................................................................................6
3.1.4 Antenna Installation Manner .......................................................................................7
3.1.5 Anti-Fall Clamp Installation .........................................................................................7
3.1.6 Hanging Bracket Installation .......................................................................................8
3.1.7 Antenna Polarization ...................................................................................................8
3.2 MW Antenna 1.8m .................................................................................................................9
3.2.1 Cheking Parts of Antenna ...........................................................................................9
3.2.2 Fixing Hanging Bracket to Reflector ........................................................................ 10
3.2.3 Installation of Adjustable Rod................................................................................... 11
3.2.4 Antenna Polarization Adjustment ............................................................................. 11
3.2.5 Antenna Adjustment ................................................................................................. 12
3.3 MW Antenna 2.4m .............................................................................................................. 13
3.3.1 Cheking Parts of Antenna ........................................................................................ 13
3.3.2 Fixing Hanging Bracket to Reflector ........................................................................ 14
3.3.3 Antenna Polarization Adjustment ............................................................................. 15
3.3.4 Installation of Adjustable Rod................................................................................... 15
3.3.5 Antenna Adjustment ................................................................................................. 16
3.4 ODU/ Hybrid Coupler/ Waveguide ...................................................................................... 17
3.4.1 ODU ......................................................................................................................... 17
3.4.1.1 Appearance and Interfaces of the ODU ................................................................ 17
3.4.1.2 Appearance and Interfaces of the OptiX RTN 310 ODU ...................................... 17
3.4.1.3 Installation the ODU on Dual-Polarized Antenna .......................................... 18
3.4.2 Hybrid Coupler ......................................................................................................... 18
3.4.2.1 Appearance and Interfaces of the Hybrid Coupler ................................................ 18
3.4.2.2 Changing the Polarization Direction of the Hybrid Coupler .................................. 19
3.4.3 Waveguide ............................................................................................................... 19
3.4.3.1 Appearance of the Flexible Waveguide ................................................................ 19
3.4.3.2 Installing the Flexible Waveguide ......................................................................... 20
3.4.3.3 Installing Guide for the Flexible Guide Fixture ...................................................... 21
3.4.3.4 Fixing the Flexible Waveguide Fixture on the Pole ............................................... 21
4. Indoor Installation ...................................................................................................................... 23
4.1 Installing the Chassis in the 19-Inch Cabinet ..................................................................... 23
4.1.1 OptiX RTN 310 ......................................................................................................... 23
4.1.2 OptiX RTN 950A ...................................................................................................... 24
4.1.3 OptiX RTN 980 ......................................................................................................... 26
4.2 Connector Installation ......................................................................................................... 27
4.2.1 Terminating the TNC Connector .............................................................................. 27
4.2.2 Terminating the N Connector ................................................................................... 29
4.2.3 Terminating the RJ45 Connector ............................................................................. 30
4.2.4 Assemble P&E Cables ............................................................................................. 31
4.2.5 Assemble OT Terminal and Power Cable ................................................................ 34
4.2.6 Assemble Cord End Terminal and Power Cable ..................................................... 35
5. Cable Installation ........................................................................................................................ 36
5.1 Cable Connection ............................................................................................................... 36
5.2 Installing OptiX RTN 310 PGND Cable .............................................................................. 37

Microwave Installation Procedure V1.1

5.3 Installing OptiX RTN 950A PGND Cable ............................................................................ 37


5.4 Installing OptiX RTN 980 PGND Cable .............................................................................. 38
5.5 Installing OptiX RTN 310 Power Cable .............................................................................. 39
5.6 Installing OptiX RTN 950A Power Cable ............................................................................ 40
5.7 Installing OptiX RTN 980 Power Cable .............................................................................. 41
5.8 Installing OptiX RTN 950A E1 Cable .................................................................................. 42
5.9 Installing OptiX RTN 980 E1 Cable .................................................................................... 42
5.10 Installing NM Cable (for Multiple Interconnected NEs at a Site) ...................................... 43
5.11 Installing Fiber................................................................................................................... 43
5.12 Routing IF Cable ............................................................................................................... 44
5.13 Grounding Points of the IF Cable ..................................................................................... 45
5.14 Installing the PGND Cable of the ODU ............................................................................. 46
5.15 Waterproofing Outdoor Connector.................................................................................... 47
6. Cable Installation ........................................................................................................................ 48
6.1 Antenna ............................................................................................................................... 48
6.1.1 One antenna on site ................................................................................................. 48
6.1.2 Two Antenna on site ................................................................................................. 48
6.2 ODU .................................................................................................................................... 49
6.2.1 1+0 Configuration ..................................................................................................... 49
6.2.2 1+1 Protection Configuration .................................................................................... 50
6.2.3 2+0 Protection Configuration .................................................................................... 50
6.3 Cable ................................................................................................................................... 51
6.3.1 PGND Cable of the ODU .......................................................................................... 51
6.3.2 IF Cable .................................................................................................................... 52
6.3.3 PGND Cable of the IDU ............................................................................................ 53
6.3.4 Ethernet LAN Cable .................................................................................................. 53
6.3.5 E1 Cable ................................................................................................................... 54
6.3.6 Optical Cable ............................................................................................................ 54
6.4 IDU ...................................................................................................................................... 55
6.5 DCPDB ............................................................................................................................... 55

ii

Microwave Installation Procedure V1.1

1. Preparation
1.1 Be sure to wear a company uniform, wearing Huawei Pass ID, a letter of
assignment from Huawei, and certification of each personnel.
1.2 Make sure Permit for entry to the site is ok.
1.3 Make sure Lock site and site address is ok.
1.4 Be sure to bring technical documents such as Engineering Design, BOQ, Delivery
Note, and installation guide.
1.5 Be sure to bring and use safety equipment and bring P3K supplies.
1.6 Be sure to bring equipment and measuring installations are complete.

Page 3, Total 63

Microwave Installation Procedure V1.1

2. Safety Equipment

Page 4, Total 63

Microwave Installation Procedure V1.1

3. Outdoor Installation
3.1 MW Antenna 0.3m 0.6m
3.1.1 Antenna Installation Condition
Antenna could be mounted on diameter of 60~ 110mm vertical mounting pipe

3.1.2 Inspection of antenna accessories

Page 5, Total 63

Microwave Installation Procedure V1.1

3.1.3 Hanging Bracket Assembly

Page 6, Total 63

Microwave Installation Procedure V1.1

3.1.4 Antenna Installation Manner


Antenna right installation

Antenna left installation

3.1.5 Anti-Fall Clamp Installation


To ensure the safety during the processes of antenna installation and adjustment, user
should install the anti-fall clamp before the antenna installation.

Page 7, Total 63

Microwave Installation Procedure V1.1

3.1.6 Hanging Bracket Installation


Hanging bracket right installation

Hanging bracket left installation

3.1.7 Antenna Polarization

Page 8, Total 63

Microwave Installation Procedure V1.1

3.2 MW Antenna 1.8m


3.2.1 Checking Parts of Antenna

Page 9, Total 63

Microwave Installation Procedure V1.1

3.2.2 Fixing Hanging Bracket to Reflector

Page 10, Total 63

Microwave Installation Procedure V1.1

3.2.3 Installation of Adjustable Rod

3.2.4 Antenna Polarization Adjustment

Page 11, Total 63

Microwave Installation Procedure V1.1

3.2.5 Antenna Adjustment


Azimuth adjustment of antenna

Elevation adjustment of antenna

Page 12, Total 63

Microwave Installation Procedure V1.1

3.3 MW Antenna 2.4m


3.3.1 Checking Parts of Antenna

Page 13, Total 63

Microwave Installation Procedure V1.1

3.3.2 Fixing Hanging Bracket to Reflector

Page 14, Total 63

Microwave Installation Procedure V1.1

3.4.3 Antenna Polarization Adjustment

3.4.4 Installation of Adjustment Rod

Page 15, Total 63

Microwave Installation Procedure V1.1

3.4.5 Antenna Adjustment


Azimuth adjustment of antenna

Elevation adjustment of Antenna

Page 16, Total 63

Microwave Installation Procedure V1.1

3.4 ODU/ Hybrid Coupler/ Waveguide


3.4.1

ODU

3.4.1.1 Appearance and Interfaces of the XMC ODU

3.4.1.2 Appearance and Interfaces of the OptiX RTN 310 ODU

Page 17, Total 63

Microwave Installation Procedure V1.1

3.4.1.3 Installation the ODU on Dual-Polarized Antenna

3.4.2

Hybrid Coupler

3.4.2.1 Appearance and Interfaces of the Hybrid Coupler

Page 18, Total 63

Microwave Installation Procedure V1.1

3.4.2.2 Changing the Polarization Direction of the Hybrid Coupler

3.4.3 Waveguide
3.4.3.1 Appearance of the Flexible Waveguide

Page 19, Total 63

Microwave Installation Procedure V1.1

3.4.3.2 Installing the Flexible Waveguide

Page 20, Total 63

Microwave Installation Procedure V1.1

3.4.3.3 Installing Guide for the Flexible Waveguide Fixture

3.4.3.4 Fixing the Flexible Waveguide Fixture on the Pole

Page 21, Total 63

Microwave Installation Procedure V1.1

Page 22, Total 63

Microwave Installation Procedure V1.1

4. Indoor Installation
4.1 Installing the Chassis in the 19-Inch Cabinet
4.1.1

OptiX RTN 310

Page 23, Total 63

Microwave Installation Procedure V1.1

4.1.2

OptiX RTN 950A

Page 24, Total 63

Microwave Installation Procedure V1.1

Page 25, Total 63

Microwave Installation Procedure V1.1

4.1.3

OptiX RTN 980

Page 26, Total 63

Microwave Installation Procedure V1.1

Page 27, Total 63

Microwave Installation Procedure V1.1

4.2 Installing the Chassis in the Outdoor Cabinet

i. Place the first IDU in the top position, if there is a second IDU place
beneath distance between IDU 1U.
ii. Install IDU grounding cable and connect to ground point on the cabinet.
iii. Install IDU power cable and connect to the power supply. Number of IDU
power cable base on BOQ.
iv. Install IF cable base on IDU cable layout.
v. Install ethernet service LAN cable for 2G/3G traffic:
a. GE port on the Power Injector (PI) of RTN310.
b. GE4 port on CSHO of RTN950A.
c. FE4 port on EM6Fof RTN980.

Page 28, Total 63

Microwave Installation Procedure V1.1

4.3 Microwave Installation Configuration

4.3.1 Antenna installed based on Link Budget requirement


4.3.2 ODU and Coupler (if any) installed properly on antenna by waveguide
4.3.3 IF cable installation follow design layout
Outdoor service cabinet-Rear view

Page 29, Total 63

Microwave Installation Procedure V1.1

View of coaxial cable from ODU to IDU inside outdoor service cabinet

View of IP LAN cable from IDU to BBU inside outdoor service cabinet

Page 30, Total 63

Microwave Installation Procedure V1.1

Use feeder clamp for coaxial cable

View of route cables of IDU power cable

MCB allocation for IDU

4.3.4 Ground kit for IF cable and ODU installed based on requirement
4.3.5 Waterproof and anticorrosive measures must be adopted for outdoor equip
4.3.6 IDU installed following site engineering design

Page 31, Total 63

Microwave Installation Procedure V1.1

4.2 Connector Installation


4.2.1

Terminating the TNC connectors


One end of the 5D IF cable needs to be terminated with a type-N connector and
is connected to the ODU or lightning arrester. The other end of the 5D IF cable
needs to be terminated with a TNC connector and is connected directly to the IF
cable.

i.

Use an electric knife to strip back the 16 mm cable sheath.

ii.

Fit the lock nut and clamp 1 on the cable.

iii.

Fit clamp 2
a. Fold back the braided shield to cover clamp 1.
b. Tidy the braided shield and use clamp 2 to bind the braided shield.
c. Cut the redundant part of the shielding layer.

iv.

Use the electric knife to strip back the dialectric insulating layer in front of
clamp 2. During the operation, the exposed cable wire should be 6 mm
long.

Page 32, Total 63

Microwave Installation Procedure V1.1

v.

Fit the connector.

vi.

Connect the connector and the lock nut. Use a wrench to tighten the
connection. Use a wrench to rotate the lock nut and another wrench to
position the body of the connector. The recommended torque is 152 N.m.

Page 33, Total 63

Microwave Installation Procedure V1.1

4.2.2

Terminating the N connectors

Page 34, Total 63

Microwave Installation Procedure V1.1

4.2.3

Terminating the RJ45 Connector

a. Straight Cable

b. Crossover Cable

Page 35, Total 63

Microwave Installation Procedure V1.1

4.2.4
i.

Assembling P&E Cables


Assemble the P&E connector on the RTN 310 side

Page 36, Total 63

Microwave Installation Procedure V1.1

ii.

Assemble the P&E connector and MGMT connector on the PI side

Page 37, Total 63

Microwave Installation Procedure V1.1

Page 38, Total 63

Microwave Installation Procedure V1.1

4.2.5

Assembling OT Terminal and Power Cable

Page 39, Total 63

Microwave Installation Procedure V1.1

4.2.6

Assembling Cord End Terminal and Power Cable

Page 40, Total 63

Microwave Installation Procedure V1.1

5. Cable Installation
5.1

Cable Connections

OptiX RTN 950A

OptiX RTN 980

Page 41, Total 63

Microwave Installation Procedure V1.1

5.2

Installing OptiX RTN 310 PGND Cable

5.3

Installing OptiX RTN 950A PGND Cable

Page 42, Total 63

Microwave Installation Procedure V1.1

5.4

Installing OptiX RTN 980 PGND Cable

5.5

Installing OptiX RTN 310 Power Cable

The recommended fuse capacity is 6 A to 12 A.


Power over Ethernet supplies power over a maximum distance of 100 m.
Allowable voltage ranges -38.4 V to -57.6 V.

Page 43, Total 63

Microwave Installation Procedure V1.1

5.6

Installing OptiX RTN 950A Power Cable

Page 44, Total 63

Microwave Installation Procedure V1.1

5.7

Installing OptiX RTN 980 Power Cable

Page 45, Total 63

Microwave Installation Procedure V1.1

5.8

Installing OptiX RTN 950A E1 Cable

5.9

Installing OptiX RTN 980 E1 Cable

Page 46, Total 63

Microwave Installation Procedure V1.1

5.10

Installing NMS Cable (for Multiple Interconnected NEs at a site)


a. in MetroE sites

b. In non-MetroE sites

*Inband DCN NMS

Page 47, Total 63

Microwave Installation Procedure V1.1

5.11

Installing Fiber

5.12

Routing IF Cable

IF CABLE

IF CABLE

Page 48, Total 63

Microwave Installation Procedure V1.1

5.13

Grounding Points of the IF Cable

Page 49, Total 63

Microwave Installation Procedure V1.1

Page 50, Total 63

Microwave Installation Procedure V1.1

5.14

Installing the PGND Cable of the ODU

Connect PGND cable of the ODU to nearest grounding bar at below of the
antenna. No ODU grounding to any tower Legs, it is not allowed

5.15

Waterproofing Outdoor Connector

Page 51, Total 63

Microwave Installation Procedure V1.1

a. Ground connections of ODU for Indoor IDU Installation

b. Ground connections of ODU for outdoor IDU Installation in Cabinet


Greenfield

Page 52, Total 63

Microwave Installation Procedure V1.1

Rooftop

Page 53, Total 63

Microwave Installation Procedure V1.1

6. Labeling
6.1 Antenna
6.1.1

One antenna on site

6.1.2

Two antenna on site

Standard_Label
MW_20120219.xlsx

Page 54, Total 63

Microwave Installation Procedure V1.1

6.2 ODU
6.2.1

1+0 configuration

Page 55, Total 63

Microwave Installation Procedure V1.1

6.2.2

1+1 protection configuration


Main

Std by

6.2.3

2 +0 protection configuration

Main 1

Main 2

Page 56, Total 63

Microwave Installation Procedure V1.1

6.3 Cable
6.3.1

PGND Cable of the ODU


ODU point

Grounding Bar point

>> 1+1 protection configuration

Page 57, Total 63

Microwave Installation Procedure V1.1

>> 2+0 protection configuration

6.3.2

IF Cable
1+0 configuration

1+1 protection configuration

Page 58, Total 63

Microwave Installation Procedure V1.1

2+0 protection configuration

6.3.3

PGND Cable of the IDU

6.3.4

Ethernet LAN Cable

Page 59, Total 63

Microwave Installation Procedure V1.1

6.3.5

E1 Cable

6.3.6

Optical Cable

IDU to IDU connection

Page 60, Total 63

Microwave Installation Procedure V1.1

6.4 IDU

6.5 DCPDB

Page 61, Total 63

S-ar putea să vă placă și