Sunteți pe pagina 1din 100

DESIGN OF A GAS PROCESSING PLANT

Submitted By
Suman Sarkar (0802019)
Abdullah Al Mamun (0802021)
Nilay Kumar Sarker (0802031)
Sabbir Alam (0802034)

A Design submitted in partial satisfaction of the requirements for the degree of


B.Sc. in Chemical Engineering

Under the supervision of


Dr. Dil Afroza Begum
Professor
Department of Chemical Engineering
Bangladesh University of Engineering & Technology (BUET)
Dhaka-1000, Bangladeh

June 2014

Acknowledgements
We would like to express our most sincere gratitude to our supervisor, Professor Dr. Dil
Afroza Begum for her inspiration, guidance, support and drive for progress has been a great
motivation during our work. We are deeply indebted to her for her sincere effort to teach us
the art of doing design works as a group. His patience, enthusiasm, immense knowledge and
encouragements have carried us through to the end of the design. Thank you for being the
greatest mentors. This dissertation would not have been possible without her.
We also wish to thank our parents and family members. Their concern, encouragement, and
advice will always be remembered and welcome.

Sincerely,
Suman Sarkar (0802019)
Abdullah Al Mamun (0802021)
Nilay Kumar Sarker (0802031)
Sabbir Alam (0802034)

Table of Contents
Definition of the Project ....................................................................................................... v
1.1 Definition of the Project............................................................................................................... vi
1.2 Raw Material................................................................................................................................ vi
1.3 Product Specification ................................................................................................................... vi
1.4 Utility .......................................................................................................................................... vii
Selection of Process ............................................................................................................. viii
2.1 Selection of the Process .......................................................................................... ix
2.1.1 Different method of Gas sweetening Process ....................................................................... ix
2.1.2 Different method of Gas Dehydration Process ...................................................................... x
2.2 Selection Criteria ......................................................................................................................... xi
2.3 Conclusion ................................................................................................................................... xi
Process Description ................................................................................................................ xii
3.1 Process Description .................................................................................................................... xiii
3.2 Sweetening Plant........................................................................................................................ xiii
3.3 Dehydration Plant .......................................................................................................................xiv
3.4 Stabilizing the Condensates ........................................................................................................xiv
Design Basis .................................................................................................................................. xv
4.1 Design Basis................................................................................................................................xvi
4.2 Product Specification ..................................................................................................................xvi
4.3 Raw Material Specification........................................................................................................xvii
4.4 Specification of Utilities ........................................................................................................... xviii
4.5 Meteorological Condition and Soil Properties of the Plant Site ..................................................xx
Process Block Diagram ....................................................................................................... xxiii
Process Flow Diagram .......................................................................................................... xxv
Engineering Calculation: Material and Energy Balance ........................... xxvii
7.1Equipment List ......................................................................................................................... xxviii
Major Equipment Design ..................................................................................................... xxix
8.1 Glycol Absorber design (1/4 of Total Flow) .............................................................................. xxx
8.2 Sizing of Pumps .......................................................................................................................... xli
8.3 Sizing of Gas Liquid Separator ...................................................................................................xlv
8.3 Heat Exchanger ......................................................................................................................... xlvii
8.4 DEA Contractor Design Calculation ............................................................................................ lvii
Mechanical Design .................................................................................................................. lxix

P & ID .............................................................................................................................................. lxxvii


Plot Plan ................................................................................................................................... lxxxiii
14.1 Estimation of Total Capital .................................................................................................. lxxxvi
Appendix ....................................................................................................................................... xcvii
Reference ........................................................................................................................................ c

Definition of the Project

1.1 Definition of the Project


A Natural Gas processing plant with a capacity of 550 MMSCFDPipeline quality Natural gasis to
be produced using raw Natural Gas from the newly invented gas wellis to be set up at Kailashtilla,
Sylhetin Bangladesh including all off sites, auxiliaries and utilities and supporting facilities.

1.2 Raw Material


Raw Natural Gas from 3 producing gas wells (550 MMSCFD)
DEAmine Solution (32.5 USGPM)
TEG (866 USGPM)

1.3 Product Specification


Composition:
COMPONENTS

MOLE FRACTION

Methane

0.930973

Ethane

0.040237

Propane

0.000658

i-Butane

0.000022

n-Butane

0.000014

n-Pentane

0.000007

n-Hexane

0.000002

H2O

0.000101

Nitrogen

0.002029

CO2

0.012562

Properties of product:
Vapour/Phase Fraction

1.0000

Molar Density (kgmole/m3)

3.319

Mass Density (kg/m3)

57.53

Molar Heat Capacity (KJ/kgmole-C)

36.98

Mass Heat Capacity (KJ/kg-C)

2.133

Thermal Conductivity (W/m-k)

4.095e-002

Viscosity (cP)

1.357e-002

Molecular Weight

17.34

Z Factor

1.000

1.4 Utility
Power
Own power generation of total Capacity of 2 MW
Where one is gas generator (1350KW) & a diesel generator (650KW).
Natural Gas
Raw Natural Gas from 3 gas wells.

Selection of Process

2.1 Selection of the Process


2.1.1 Different method of Gas sweetening Process
a) Solid bed Sweetening Process
b) Aquasorption Process (Wash water process)
c) Selexol Process
d) Chemical Absorption process
e) The Holmes-Stretford Process

2.1.1.a Solid bed Sweetening Process


The processes are based upon physical or chemical of adsorption of acid gases on
solid. Simplicity, high selectivity (only H2S is removed) and process efficiency is
independent of pressure are the main advantages of the process. Solid bed Sweetening
Process are of two type- (i) The Iron Sponge Process, (ii) Molecular sieves Process.

2.1.1.bAquasorption Process (Wash water process)


This is an effective process for application of high pressure gas with high acid gas
content and high H2S to CO2 ratio. For high H2S to CO2 ratio gases, operating and
investment can be reduced by applying this process.

2.1.1.c Selexol Process


In selexol process Dimethyl ether of polyethylene glycol (DMPEG) is used as solvent.
Solubility of the acid gas in DMPEG is directly proportional to the partial pressure of
the acid gas component. H2S gas is more soluble than CO2.. Higher hydrocarbons
have the greater solubility.

2.1.1.d Chemical Absorption process


The alkanol-amin processThe alkanol-amine process are the most prominent and widely used process for H2S
and CO2 removal. They give offer good relatively low cost and good flexibility in
design and operation.

Monoethanolamine (MEA), Diethanolamine

(DMA),

Teriethanolamine (TEA) etc are most common alkanol-amin.

The hot carbonate processAn aqueous potassium carbonate solution is the main reagent of hot carbonate
process. High concentration & temperature of potassium carbonate and high partial
pressure of CO2 gas are required for better performance. It is not applicable for gas
stream which contains only H2S.

2.1.1.e The Holmes-Stretford Process


By this process H2S can be removed as elementary carbon but CO2 content remains
unaltered. This process can be designed for large temperature & pressure range.
Lower operating cost and flexibility is the main advantage of this process.

2.1.2 Different method of Gas Dehydration Process


a) Absorption dehydration Process
b) Adsorption Process
Among these, Glycol process for Dehydration and DEAmine Process for Sweetening are
used in this process design.

2.1.2.a Absorption Process


Absorption dehydrationis a process where a liquid dessicant is used for the removal of
water vapor from a gas. Glycol, Ethylene glycol (EG), diethylene glycol (DEG),
triethylene glycol (TEG), etc are the most common absorbent used in absorption
dehydration process

2.1.2.b Adsorption Process


Adsorption dehydrationis a process where a solid desicant is used for the removal of
water vapor from a gas stream. Alumina, silica gel, alumina silica gel, Molecular
sieves are the most common adsorbent used in adsorption dehydration process.

2.2 Selection Criteria


As there are many variable in Natural Gas treating process, it is difficult to choose an
appropriate application area of the process. However among the several factors the most
significant which are to be considered are
The types and concentrations of impurities present in the gas and degree of removal
desired.
Selectivity of acid gas removal required, if any
Temperature and pressure at which the sour gas is available and at which the sweet
gas is to be delivered.
Volume of the gas to be processed and its hydrocarbon composition.
CO2 and H2S ratio in the gas.
The desirability of sulfur recovery due to environmental problems or economics

2.3 Conclusion
Economic analysis over decades with respect to Bangladesh has proved that among all
processes Glycol Dehydration and Amine sweetening process are the most proven ones. So
nowadays this process is highly adopted throughout the world and involves so many possible
variations in approach. Most of the processing plants in Bangladesh are built on these
processes and have been performing at good condition. So, in this design project Glycol
Dehydration and Amine sweetening process was adopted.

Process Description

3.1 Process Description


The process of producing Pipeline quality Natural Gas is divided into two parts.
1) Sweetening
2) Dehydration
3) Stabilizing the Condensates.

3.2 Sweetening Plant


This process flow scheme varies little, regardless of the aqueous amine solution used as the
sweetening agent. Slight modifications can appear linked to the type of amine which is
selected and to the optimization of the scheme for specific purposes.
The general process flow for an amine sweetening plant is shown in PBD. The feed gas (sour
gas) containing H2S and/or CO2 always must enter the plant through an Inlet Separator to
remove free liquids and/or entrained solids. The gas from this separator enters the bottom of
the Absorber and flows upward trough the column in intimate counter-current contact with
the aqueous amine solution (lean solution). In the column the chemical reaction between the
amine and the feed gas acid gas occurs and the amine solution absorbs the acid gas. The
chemical reaction (due to the heat of reaction between the amine and the acid gas) is
exothermic. It will raise the temperature of the gas. Treated gas (sweet gas) leaves the top of
the column and the amine solution loaded with acid gas (rich solution) leaves the bottom of
the column.
The absorber column operates at the feed gas pressure. A minimum pressure of 4/5 b.a is
required to make the process feasible and operable. There is no limitation on high pressure as
far as the process is concerned. If the feed gas be at high temperature, a gas/gas exchanger
(using the hot treated gas as heating medium) will be provided. This equipment will be
installed upstream of the inlet separator.
The rich solution from the Amine Flash Drum then passes through an Amine/Amine Heat
Exchanger. This heat exchanger serves as a heat conservation device and lowers the total heat
requirements for the process. The rich solution is heated by the regenerated solution (lean
solution) coming from the regenerator. Then the rich solution is let down to the operating

pressure of the Regenerator (generally between 1.2 and 2 b.a) also called stripper is a
fractionation column (with trays or packing) with a condenser (using water or air as cooling
medium) and a reboiler.

3.3 Dehydration Plant


Lean, water-free glycol (purity >99%) is fed to the top of an absorber (also known as a
"glycol contactor") where it is contacted with the wet natural gas stream. The glycol removes
water from the natural gas by physical absorption and is carried out the bottom of the column.
Upon exiting the absorber the glycol stream is often referred to as "rich glycol". The dry
natural gas leaves the top of the absorption column and is fed either to a pipeline system or to
a gas plant. Glycol absorbers can be either tray columns or packed columns.
After leaving the absorber, the rich glycol is fed to a flash vessel where hydrocarbon vapors
are removed and any liquid hydrocarbons are skimmed from the glycol. This step is
necessary as the absorber is typically operated at high pressure and the pressure must be
reduced before the regeneration step. Due to the composition of the rich glycol, a vapor phase
having high hydrocarbon content will form when the pressure is lowered.
After leaving the flash vessel, the rich glycol fed to the stripper (also known as a regenerator).
The glycol is thermally regenerated to remove excess water and regain the high glycol purity.

3.4 Stabilizing the Condensates


The liquid outlets from the 2 phase separators are sent to Stabilizer. Here hydrocarbon
condensates are recovered as NGL Gases from the liquid phase. The NGL gas is the
compressed by a compressor and stored into a storage tank. This NGLs are sent to the LPG
plant for further processing.

Design Basis

4.1 Design Basis


The following is the design basis that has been assumed for the Natural Gas Processing plant
producing 550 MMSCFD pipeline quality gas by using DEAmineProcess for Sweetening and
Try Ethyle Glycol process for dehydration. The process will operate 365 days /yr.
Design basis includes site conditions, utilities and climate conditions etc. which influence the
design of individual unit, equipment or facility of the overall project. Selection of the site
conditions is extremely important in determining the ultimate success of the project.

4.2 Product Specification


Composition:
COMPONENTS

MOLE FRACTION

Methane

0.930973

Ethane

0.040237

Propane

0.000658

i-Butane

0.000022

n-Butane

0.000014

n-Pentane

0.000007

n-Hexane

0.000002

H2O

0.000101

Nitrogen

0.002029

CO2

0.012562

H2S

0.0012

Properties of product:
Vapour/Phase Fraction

1.0000

Molar Density (kgmole/m3)

3.319

Mass Density (kg/m3)

57.53

Molar Heat Capacity (KJ/kgmole-C)

36.98

Mass Heat Capacity (KJ/kg-C)

2.133

Thermal Conductivity (W/m-k)

4.095e-002

Viscosity (cP)

1.357e-002

Molecular Weight

17.34

Z Factor

1.000

4.3 Raw Material Specification


Raw Natural Gas
Composition:
COMPONENTS

MOLE FRACTION

Methane

0.8634

Ethane

0.0392

Propane

0.0088

i-Butane

0.0007

n-Butane

0.0005

n-Pentane

0.0005

n-Hexane

0.0003

H2O

0.0467

Nitrogen

0.0018

CO2

0.0204

Pressure

1400 psi

Temperature

77oF

DEAmine
OH

OH
NH

Composition:
Components

Mole fraction
0.2795

DEAmine

0.7187

H2O

0.0018

CO2
Try Ethylene Glycol (TEG)
OH

O
O

OH

Composition:
Components

Mole fraction

Glycol

0.995

H2O

0.005

4.4 Specification of Utilities


Electric Power
Voltage

380/220 V
Frequency

50 Hz

Phase

3 phases

Process Water
Temperature 25 oC
Pressure

0.5 MPa (G)

Quality:
PH

6.5 - 8.5
Total hardness

5 mg

Total basically

5 mg

Total Fe3+

0.1 mg/l

Turbidity

5 mg/l

Circulating Cooling Water


Inlet

Outlet
Temperature

< 30 oC

38 oC

Pressure

0.5 MPa

0.2 MPa

Fouling factor

6x10-4 M2.hr. oC/kcal

Turbidity

50 mg/l

Chlorine

< 5 ppm

PH

6.5 8

Steam
State Saturated
Pressure

7 kg/cm2

Soft Water
Conductivity

< 1x10-6 Ohm-1.cm-1

4.5 Meteorological Condition and Soil Properties of the


Plant Site
Ambient Temperature
Absolute max. Temperature:

35 oC

Absolute min. temperature:

12oC

Designed max. Temperature:

40oC

Designed min. temperature:

5oC

Atmospheric Pressure
Annual average atm. Pressure:

0.11 MPa

Max. average atm. Pressure:

0.15 MPa

Min. average atm. Pressure:

0.09 MPa

Designed average atm. Pressure:

0.2 MPa

Humidity
Annual average relative humidity:

80 %

Max. monthly average relative humidity:

87 %

Min. monthly average relative humidity:

65 %

Designed relative humidity:

90 %

Wind
Wind direction: Generally wind flows from the north to the south in the winter
season and from the south to north in the summer in our country.
Wind Velocity: 45 knot (45 nautical miles per hour or 52 miles/hr)

Rain
Annual avg. rainfall:

2850 mm

Max. Avg. rainfall:

690 mm

Max. Monthly rainfall:

235 mm

Earth bearing capacity


Load bearing capacity:

The soil has a bearing capacity of 0.38 ton/ft2


required piling is used.

Corrosive tendency:

Non Corrosive

Climate Condition
Summer:
Wet bulb Temperature (max)

29C

Dry bulb Temperature (max)

32C

Relative humidity

84%

Wet bulb temperature (min)

22C

Dry bulb Temperature (min)

25C

Dew point

21C

Relative humidity

80%

Winter:
Wet bulb Temperature (max)

22C

Dry bulb Temperature (max)

26C

Dew point

20C

Relative humidity

72%

Wet bulb temperature (min)

11OC

Dry bulb Temperature (min)

9C

Dew point

9C

Relative humidity

65%

Other Information
Natural catastrophe:

A possibility of storm in the months of April-May.

Value of by-products: No economically feasible by-products are


obtained.

Process Block Diagram

Process Flow Diagram

Engineering Calculation:
Material and Energy Balance

7.1Equipment List
Table 7.1: Table of Equipment List

Designation in the HYSYS

Equipment Name

Quantity

Compressor

K-100

Heat Exchanger

E-100, E-102

Adsorber

T-100, T-102

Separator

V-100, V-101, V-104

Pump

P-100, P-101

Storage Tank

V-106

Stripper Column

V-102, V-103

Stabilizer Column

V-105

silulation

Major Equipment Design

8.1 Glycol Absorber design (1/4 of Total Flow)


TOP

Bottom

Vapor rate, ft3/sec

4.1

3.7

Liquid rate, ft3/sec

0.49

0.84

Vapor Density, lb/ft3

3.6

3.92

Liquid Density, lb/ft3

70.31

52.12

Surface tension, dynes/cm

45.87

22.1

Assumptions:
Clean service, no fouling or suspended material
Tray spacing is to be close as possible, because vertical installation space is a
premium.
All equations and data used here refer to the book A P P L I E D PROCESS D E S I G N
FOR CHEMlCAlAND PETROCHEMICA1 PlANTS, Volume 2, Third Edition by Ernest E.
Ludwig.

Calculation of Tower Diameter


Souders-Brown method
W = C(v)[(l) (v)]
At the Surface Tension 22.1,
From Figure 8-82, C = 280 for 12-inch tray spacing.
In this case Vapor rates are close and vdoes not change much from bottom to top of tower.
W = 280 [3.92(52.12 3.92)]= 3848.796 lbs/hr (ft2)
3848.796

= 3600 2.872= 0.3722 ft3/sec (ft2)


Tower cross-section area, A =

4.1

= 0.3722 ft2 = 11.02 ft2

Diameter, D = 4 3.1416 = 3.75 ft


Using Hunt equation:
Assuming Height clear liquid in bubbling zone on tray, hc = hw + how = 3.5 in.
S' = St 2.5 hc = 12 2.5 3.5 = 3.25 in.
At surface tension = 22.1 dynes/cm,
For Liquid entrained, ew = 5% = 0.05

From Figure 8-121, allowable tower velocity = 1.5 ft/sec


3.7

Required tower area = 1.5= 2.47 ft2 (bottom, largest)


Diameter = 4 1.23 3.1416 = 1.78 ft
Selecting tower diameter = 4.0 ft

Tray Layout Based on 4.0 ftDiameter Tower


Using a segmental downcomer on a cross-flow tray.
From the residence time in downcomers for bubble cap trays and at the tray spacing of 12
inches, selecting an allowable liquid velocity of .4 ft/sec.
Downcomer area = . 84 .4= 2.8 ft2
Total tower area =3.1416 4.02 4= 12.57 ft2
2.8

Percent of tower area = 12.57 100 % = 22.3%


Using Figure 8-100 for segmental downcomers, at 22.3% downcomer area, the weir length is
89% of tower diameter.
Weir length, lw= 0.89 4.0 = 3.56 ft
Since standard details for fabrication are already available for a tray with a 19.5-in. weir in a
30-in. tower (65% of dia.), try this asfirst tray examined. This is 6.8% of tower cross
sectional area.
Downcomer area = 0.068 12.57 = 0.86 ft2.

Hole Size
Assuming 3/16-in. dia. 3/5-in. pitch
This is spacing of 2.66do, and is asclose as good design would suggest. Using 1/2-in. tray
thickness.
do

Ratio,= =

3/16
3/5

= 0.3125

Percent hole area = 13% (of perforation area only) as shown in Figure 8-143.

Minimum Hole Velocity: Weeping


1

Assuming vo (v) /2= 13


Assuming Submergence = 4 in. = hsl= hdl (neglecting /2)
water
Dry Tray Pressure drop, hdt = 0.003(vo2 v)
(1 2)/Co2
L
The hole dia
3/16
ratio=
= 1.5
tray thickness
1/2
From Figure 8-126, = 0.2
From Figure 8-128, orifice coefficient, Co= 0.78
hdt =

0.003132 64.2(1.22 )

= 1 in. liquid

52.12.782

Effective head
For hsl= 4, Fs<14
Reading from Figure 8-130; effective head, he= 2.25 in. liquid

Total Wet Tray Pressure Drop


ht= hdt + he = 1+ 2.25 = 3.25in. liquid

Weep Point
Using Figure 8-131 Curve A, and ht= 3.25 in. liquid
1 /2

Reading Weep point velocity = 16 = vom (v)


1

Because vom (v) /2= 16 is greater than the assumed value of 13, the 13 cannot be used.
1

Assuming new Fs = vo (v) /2= 25


Assuming Submergence = 1.25-in. = hsl= hdl (neglecting /2)
water
Dry Tray Pressure drop, hdt = 0.003(vo2 v)
(1 2)/Co2
L
The hole dia
3/16
tray thickness ratio= 1/2 = 1.5
From Figure 8-126, = 0.1
From Figure 8-128, orifice coefficient, Co= 0.78
hdt =

0.003252 64.2(1.12 )
52.12.782

New Effective head

= 3.75 in. liquid

For hsl= ,Fs<14


Reading from Figure 8-130; effective head, he= 1.35 in. liquid

New Total Wet Tray Pressure Drop


ht= hdt + he = 3.75+1.35 = 5.1in. liquid

Using Figure 8-131 Curve A, and ht= 5.1 in. liquid


1 /2

Reading Weep point velocity = 24.6 = vom (v)


1

Because vom (v) /2= 24.6 is smaller than the assumed value of 25, the 25.0 is accepted value.

Maximum Hole Velocity at Flood Conditions


1

Assume F, = vo (v) /2= 30 max.


Submergence = 1.25-in. = hsl= hdl (neglecting /2)
hdt =

0.003302 64.2(1.092 )
52.12.782

= 5.4in. liquid

Effective head, he= 1.35 in. liquid, for Fs>14 and hsl= 1.25 inch
Total wet tray pressure drop, ht= 5.4 + 1.35= 6.75 inches liquid

Liquid Back-up or Height in Downcomer

Hd= ht+ (hw+ how) + + hd


Hd= 6.75 + 1.25 + 0 + 0 (assuming and hd to be confirmed)
Hd= 8.0 in. liquid
The limit on Hd for flooding is St/2= 12/2= 6 in.
Therefore Fs= 30 appears to be a good assumption.

Design Hole Velocity


A velocity represented by Fs factor between minimum and maximum limits is to be selected.
30 >Design >25
A median value of Fs= 27.5 is selected, because freedom to operate above and below the
design value is preferred in this case.

Design Basis
Fs= 27.5
1. Weir Height selection: hw= 3.0 inch
2. Weir Length selection:For good design, ratio of weir length to tower diameter is 0.5
to 1.0

Selected weir length lw = 4.0 ft.


Weir length to tower diameter ratio is 1.0
()
2.5

.84448.8
4.02.5

= 11.78

From figure-8-105, correction factor: Fw: 1.0


2/3

()

Francis Formula , how = .092

2/3

.84 448.8

= .092

4.0

in = 1.9 in

3. Submergence: hsl= (Fw) (hw) + how= (1) (3.0) + 1.9 = 4.9 in. liquid

4. Downcomer pressure loss:


Clearance between bottom of downcomer and plate = 3-in. max. Underflow area = (9.5 in.) (3
in.)/144 = 0.2 ft2. Because this is less than the downflow area, it must be used for pressure
drop determination. No inlet weir used on this design.
.84449 2
Lg 2
hdu= 0.56449A = 0.56[449 0.2] = 9.88 in liquid

5. Dry tray pressure drop:


hdt =

0.00327.52 64.2(1.12 )
52.12.782

= 4.55 in. liquid

6. Effective head:hsl= 4.9 in.


he= 2.55 in. liquid for Fs>14, Figure 8-130

7. Total wet tray pressure drop:


8.
ht= 4.55 + 2.55 = 7.10 in. liquid
9. Total tower pressure drop for 19 trays:
(tower)=

7.119(70.31+52.12)
17282

= 4.78 psi

which is not greater than 5 psi. So, it is satisfactory.

10. Number of holes required:


Assumed Hole size = 3/16 in.
Hole spacing or pitch = 3/5 in.

From Figure 8-144, Holes/(in.2 plate area) = 3.25


Area of a 3/16 -in. hole = 0.0276 in.2

At Design condition: Fs = 27.5

27.5

Top Vapor Velocity, vo,Top = () = 3.6 = 14.5 ft/sec

27.5

Bottom Vapor Velocity, vo,Bottom = = () = 3.92= 13.9 ft/sec


Number of holes required =

Vapor Flow rate 144


vo hole area

4.1144

at Top = 14.5.0276= 1476


3.7144

at Bottom = 13.9.0276= 1389


At Flooding condition: Fs = 30

30

Top Vapor Velocity, vo,Top = () = 3.6 = 15.82 ft/sec

30

Bottom Vapor Velocity, vo,Bottom = = () = 3.92= 15.16 ft/sec


Number of holes required =

Vapor Flow rate 144


vo hole area

4.1144

at Top = 15.82.0276= 1353


3.7144

at Bottom = 15.16.0276= 1274


At Weeping condition: Fs = 25

25

Top Vapor Velocity, vo,Top = () = 3.6 = 13.18 ft/sec

25

Bottom Vapor Velocity, vo,Bottom = = () = 3.92= 12.63 ft/sec


Number of holes required =

Vapor Flow rate 144


vo hole area

4.1144

at Top = 13.18.0276= 1624


3.7144

at Bottom = 12.63.0276= 1529


11. Tower Height:
Height of the column
H = (N-1) + Ht + Hb + Htr
Total tray thickness ,Htr=


12

ft =

190.5
12

ft = 0.8 ft

Space at the top typically an additional 5 to 10 ft is needed to allow for disengaging space.
The bottom of the tower must be tall enough to serve as a liquid reservoir. At bottom portion,
top of both inlet and outlet pipes should be at least 400 to 450 mm below the bottom tray.
Additional top height, Ht= 5ft
Additional bottom height, Hb= 2.2ft
Number of tray, N= 19
H = [{(19-1) 12}/12 + 5 + 2.2 + 0.8]ft
= 26 ft
12. Mechanical tray layout details:
A total of 4-in. on diameter for extension of tray ring-type support into the tower. This
reduces available tray area.
Assuming 6.5-in. clearance (no holes) between inlet downcomer and first row of holes. The
6.5 in. could be reduced to 4 in. minimum if an inlet weir were used.
Assuming 4-in. clearance (no holes) between outlet weir and adjacent row of holes.
Downcomer width = .12 4 = 0.56 ft = 5.76 in (From Figures 8-100 at standard 65% weir
length downcomer width is 12% of Tower diameter).

Area determinations:
Area of segment of circle (2) with chord AD:
Diameter circle (2) = 48 - 4 = 44 in.
Height of chord =

44
2

48

( 2 5.76 6.5)= 10.26 in.

Chord height/circle dia. H/D =

10.26
44

= 0.23

Referring to Perrys Handbook, (pg. 32, 3rd Ed.)


Area = 0.133 442= 258 in2
Area of segment of circle (2) width chord BC:
Height of chord =
H/D =

44
2

48

( 2 5.76 4)== 7.76 in

7.76
44

= 0.176

Area = 0.08 442= 155in2


Area of circle (2) = 442= 6028 in.2
Area available for holes = 6028 (258 + 155) = 5615 in.2

Area required for holes =

1624
3.25

holes/in2= 500 in2.

Number of holes = 1624


Area = 5615 in.2

Other Mechanical Designs:


Maximum Operating Temperature = 38oC = 311k
Maximum Operating Pressure = 1250 psi = 88 kg/cm2

a) Shell Thickness:
Material = SA-516-70 Carbon Steel
Specific Gravity, s = 7.7
Maximum allowable stress, fs = 1300 kg/cm2
Welding efficiency, j = 0.9
Design Pressure, PD = 1.5 Operating Pressure = 1.5 88 = 132 kg/cm2
Internal Shell or column Dia, D = 4 ft = 1.2192 m = 1219.2 mm
Here, C = corrosion Allowance = 3 mm
PDD

1321219.2

Thickness, ts= 2 fs j PD + C = 2 1300 .9 132 + 3 = 73mm

b) Tray:
Thickness = 1/2 inch = 0.5 inch
Material = SA-516-70 Carbon Steel
Sieve Tray,

hole size = 3/16 inch,

pich = 3/5 inch,

Triangular.

Tray Spacing = 12 inch

c) Support for trays:


A total of 4-in. on diameter for extension of tray ring-type support into the tower.
Material: Carbon steel.

d) Downcomer and Weir:


Material = Carbon steel.

e) Support for Column:


Skirt type,

Height = 6.6 ft,

Material = Carbon steel.

f) Heads:
Material = SA-516-70 Carbon steel.
Permissible tensile stress = 1300 kg/cm2
Thickness of Head,
th =

PDRcW
2 fs j
1321219.21.54

2 1300 .9

= 106 mm
= 4.042 inch

g) Insulation and Coating:


Insulating material: Polyurethane
Insulating width: 4 inch

Coating material: Zinc Sulfate


Coating width: 0.06 inch

Rc = Crown Radius =1219.2


1
W = Stress intensification factor = 4 3 +

Rc

Rl

= 1.54 mm
Where, Rl = Knuckle radius = 0.1 Rc

8.2 Sizing of Pumps


Pump (P-100) of Dehydration plant
Given Density, = 972kg/m3 = 60.68 lb/ft3
Viscosity, = 17.48 cP = 11.746 10-3lb/sec.ft
Temperature = 62.370 F
Mass flow rate =14.6487kg/hr = 7110.2 kg/hr = 1.975 kg/sec = 4.35 lb/sec

Volumetric flow rate q =

4.35
0.072 ft3/sec
60.68

= 3.9 q0.45 0.13 [Peters and Timmerhaus]

Di opt

= 3.9 0.0720.45 60.680.13


= 2.035 inch
Let us assume, Nominal diameter = 2 inch and Schedule number = 40
Outer Diameter, OD = 2.38 inch = 0.198 ft
InnerDia, ID = 2.067 inch = 0.172 ft[From table D-13 (Peters and Timmerhaus)]
Area, A = ID2/4 = (0.172)2/4 = 0.0233 ft2

v = q/A =

Re =

Dv

0.072
0.0233

=3.092ft/sec

0.1723.0960.68
11.746 103

= 2814.15

For commercial steel /D = 0.000885 for 2.067 inch dia


page- 68]
From Moody diagram (Franzini, page -226)
Friction factor f = 0.0195

Loss calculation
1. For 90 elbow(2 pcs)
F1= 2k (v2/2g)
=

20.233.09^2
232.2

=0.0682ft
2. For Tee (1pcs)
F2=k (v2/2g)
=

1.83.09^2
232.2

=0.267ft
3. For Gate valve (2 pcs)
F3 = 2k (v2/2g)
20.193.09^2
=
232.2

= 0.0563 ft
4. Entrance loss
F4 = k (v2/2g)

[from Ernest E. Ludwig (vol-1)

0.53.09^2
232.2

= 0.0741ft
5. Exit loss
F5 = k (v2/2g)
=

13.09^2
232.2

= 0.1482ft
6. Friction loss
F6 = f(L/D)(v2/2g)
110

3.09^2

= 0.0195

0.172 232.2
=1.83ft
Total Loss, hL= F = (0.0682+ 0.267+ 0.0563 + 0.0741+ 0.1482+ 1.83)ft
= 2.4438 ft

Energy Calculation:
Using Bernoullis equation
P1/ + Z1 +V12/2g +hA -hL=P2/ +Z2 +V22/2g

Given that
P1= 20 KPa = 2.9 psi
P2= 9020KPa = 1308.6 psi
Z2-Z1= 40ft

V1=V2=3.09ft/sec
= 60% (assume)
P2 P1

hA=

+ (Z2-Z1)+ (V22 - V12)/2g + hL

1308.6 2.9

60.68 32.2

+ 40 + 0 + 2.4438

=43.112ft
P = hq/(500). = (60.6832.20.07243.112)/(5500.6)
= 17.1hp
Assuming over design, shaft power = 17.11.1= 18.8hp

We can select 20 HP centrifugal pump.


So straight centrifugal pump, model DUGL12A-20 was selected.
Specification of pump:
Material: cast iron
RPM: 1750
Flow capacity: 770GPM (max)
Impeller size:
Weight: 255 lbs
Price: $ 4662.00

8.3 Sizing of Gas Liquid Separator


Given,
Vapor density, v= 4.854 lbm/ft3
Liquid density, L = 55.703 lbm/ft3
Molecular weight of vapor, MWvap = 17.766 lbm/ lbmole
Vapor flow rate, V = 18.37 lbmole/sec
k = 0.40for up-flow [Ludwig, vol. 1, Page-256]

Design velocity
l v
v

VD = kv

= 0.40 (

55.703 4.854

4.854

)^0.5

= 1.3 ft/sec
& Actual flow rate
ACFS =

V MWvap
v

= 67.23 ft3/sec
Flow area (cross sectional),
ACFS
Ac= V ft2
D
=

67.23
1.3

= 51.72 ft2

Inner Diameter, ID = (4 Ac /) 0.5 = (4 51.72 /3.14)0.5= 8.12 ft

For vertical separator, (h/D) min = 5


Minimum height, h = 5 8.12 = 40.6 ft

Thickness calculation
Here, operating pressure, P = 800 psi
Design pressure, PD= 1.5 P = 1.5 800 = 1200 psi
Thickness, ts =

PD D
2 j0.2PD

+ Cs

Where
PD = Design pressure
fs= Allowable working stress =1600 psi [ Low-alloy steel for resistance to H2 & He ]
E= Joint efficiency (dimensionless) = 80%
Cs=corrosion allowance= 0.12 inch
ts =

1200 8.12 12
2 1600 0.8 0.2 1200

+ 0.12 = 39.6 inch = 3.3 ft

(Ref: Peter and Timmerhaus, Chap 14, table 3 and 4, page: 537, 538 and 721)

8.3 Heat Exchanger


Thermal Design of Heat Exchanger (E-100)
Tube side (Cold fluid)
Inlet fluid: Glycol to be preheated
Outlet fluid: Preheated glycol to absorber
Inlet temperature: 67.59o F
Outlet temperature: 770F
Tavg = 72.2950F
Density (by interpolation) =70.58 lb/ ft3
Viscosity = 22.52 cP=54.5 lb/ft-hr
Thermal conductivity K= 0.192 Btu/hrft0F
Heat capacity Cp =0.5891 Btu/lb0F
Flow rate, Wg = 4.88 x 105 lb/hr
q = WgCpt = (4.88 x 105 x 0.5891 x 9.41) Btu/hr
= 2.7x 106 Btu/hr

Shell side (Hot fluid)


Inlet fluid: Dry gas
Outlet fluid: Sales gas
Inlet temperature: 99.880 F
Outlet temperature: 94.860F
Tavg = 97.370F

Density (by interpolation) = 3.601 b/ft3


Viscosity = 0.01362 cP=0.0333 lb/ft-hr
Thermal conductivity K = 0.023875 Btu/hrft0F
Heat capacity Cp = 0.5105 Btu/lb0F
Flow rate,Wi = 1.05 x 106 lb/hr
q = WiCpt = (1.05 x 106 x 0.5105 x 5.02) Btu/hr
= 2.7x 106 Btu/hr

Tube side calculation


LMTD calculation:
(First pass counter-current flow)
Hot

Cold

Difference

Higher

99.88 (T2)

67.59 (t1)

32.29

Lower

94.86 (T1)

77 (t2)

17.86

Difference

5.02

9.41

14.43

LMTD =

(22)(11)

(LMTD)' =

(22)
ln(
)
11

4.39

21

S=

5.02

R=

ln(22.88/27.27)

= 25.01oF

21

R=

21
T2t1

S=

9.41

= 0.53

9.41
99.8867.59

= 0.2914

From Fig 18 (kern) Page-828 for 1-Shell pass & 2 or more Tube pass heat exchanger
FT = 0.95 which is satisfactory..
Corrected LMTD = FT x (LMTD)'
= 0.95 25.01
= 24.510F

Calculation of heat transfer area and tube numbers


Q = Uassume Arequired LMTD
For light - heavy organics
Overall U = 10-40 Btu/hr ft20F
Assume, Uassume = 35 Btu/hr ft20F

Q
2.7 10 6

3147.4 ft 2
A=
U assumee LMTD 35 24.51

Iteration- 1
The first iteration is started assuming 1 shell pass & 2 tube pass(np).
Fixed tube plate
1

1in. OD(d0), 14 BWG, 1 4 in. square pitch, ID (di) 0.834 in.


Assuming tube length (Lt) is 20 ft.
So, no of tubes, nt =

d0Lt

= 562

Nearest count from table 9(kern) Page-841 is 574

Now, Reynolds no, Re =

4wgnp
dint

= 892 < 104

Iteration- 2
2nd iteration is started assuming 1 shell pass & 4 tube pass(np).
Fixed tube plate
1

1in. OD(d0), 14 BWG, 1 4 in. square pitch, ID (di) 0.834 in.


Assuming tube length (Lt) is 30 ft.
So, no of tubes, nt =

d0Lt

= 561

Nearest count from table 9(kern) Page-841 is 562


Now, Reynolds no, Re =

4wgnp
dint

= 1100 < 104

Iteration- 3
3rd iteration is started assuming 1 shell pass & 4 tube pass(np).
Fixed tube plate
9

1.25 in. OD(d0), 16 BWG, 1 16 in. square pitch, ID (di) 1.12 in.
Assuming tube length (Lt) is 26 ft.
So, no of tubes, nt =

d0Lt

= 259

Nearest count from table 9(kern) Page-841 is 268


Now, Reynolds no, Re =

4wgnp
dint

= 5647 < 104

Iteration- 4
4th iteration is started assuming 1 shell pass & 6 tube pass(np).
Fixed tube plate
7

1.5 in. OD(d0), 16 BWG, 1 8 in. square pitch, ID (di) 1.37 in.
Assuming tube length (Lt) is 45 ft.
So, no of tubes, nt =

d0Lt

= 178

Nearest count from table 9(kern) Page-841 is 182


Now, Reynolds no, Re =

4wgnp
dint

= 16560 > 104

Therefore, our final tube no 182 & Reynolds no (Re) is 16560 selected shell ID (Ds) is 35 in.
Now,
1

Cp 3
hidi
Nu =
( )0.14
= 0.027 Re0.8

K
k

So, hi = 175.74 Btu/hrft2 0F


hio = hi x

=151.92 Btu/hrft2 0F

Shell side calculation


Assumption:
25 % cut segmental baffles
Baffles spacing, B = 0.5 Ds = 17.5 in = 1.46 ft (half of the shell ID is selected)
7

Pitch, Pt = 1 in. square pitch = 0.15625 ft


8

Clearance, C = Pt do = 0.03125 ft

Shell ID, Ds = 35 in = 2.92 ft


So, flows area, as =

IDshell C B
PT

= 0.8526 ft2
Mass velocity, Gs = Wi / as = 1.23 x 106 lb/hrft2
Equivalent dia, De =

4 P T d 0 2 / 4
d o

= 0.124 ft
Reynolds no, Re =

= 465000

So,
1

Cp 3
hoDe
Nu =
( )0.14
= 0.36 Re0.55

K
k

So, ho = 184 Btu/hrft2 0F


Clean overall heat transfer coefficient (Uc) calculation
Uc =(

+ +

Rd)-1 = 42.3 Btu/hrft20F

Over design calculation:


% of over design =

= 20.86 % < 30 %

So, design is accepted.

Dirt factor calculation


Clean overall heat transfer coefficient, Uc = 42.3 Btu/hrft20F

Assumed overall Coefficient, Ud = 35 Btu/hrft20F


Dirt factor, Rd =

Uc UD
U c U D

= 0.00098
Because for natural gas Rd, allowable=0.001 (Ref: Mechanical Design of Process System (vol2))
Therefore, Rd is acceptable.

Pressure drop calculation


Tube side calculation
Flow area, at=

No of tubes flow area per tube


No of passes
182 0.01021
6

= 0.309 ft2
Mass velocity,Gt = Wg/at = 1.6 104lb/hrft2
For Ret = 16560
From figure 26, tube side friction factors correlation (Kern) Page-836
Friction factor, f = f = 0.288 ft2/ft2
Assume, t =1
So, frictional pressure drop, Pf

f .G 2 t.Lt .np
2.22 Psi
5.22 1010.di.SG.t

Return loss Pr = 1.334 10 (2np 1.5)


-13

.G 2t

= 0.34 Psi

So, total pressure drop in tube side, PT = Pf + Pr = 2.56 Psi < 8.7 psi which is acceptable.

Shell side calculation


7

Pitch, Pt = 1 8 in. square pitch = 0.15625 ft


Clearance, C = Pt do = 0.03125 ft
Shell ID, Ds = 35 in = 2.92 ft
Flows area, as = 0.8526 ft2
Mass velocity, Gs= 1.23 x 106 lb/hrft2
Reynolds no, Re = 465000

No of baffles, nb=

= 30.82 ~ 31

From figure 26, tube side friction factors correlation (Kern) Page-836
Friction factor, f = 0.1296 ft2/ft2

s =1(assuming)

f .G 2 s.Ds.(nb 1)
So, pressure drop = Ps
5.22 1010.De.SG.s
= 9.38 Psi < 14.5 Psi, which is acceptable.

Mechanical design
Tube side properties:
Materials: Stainless Steel
No. of pass: 6

Shell side properties:


Materials: Stainless Steel
No. of shell: 1
Shell dia, Ds = 35 in
Working pressure, P = 1247 Psi
Design pressure, Dp = Wp 1.1 = 1371.7 Psi
Permissible working pressure, f = 11000 Psi
Welding efficiency, j = 0.9

Shell thickness, ts=

P.Ds
2. f . j P

= 2.088 in.
Corrosion allowance =1/8 inch= 3.175 mm
Shell thickness including corrosion allowance = (2.088+1/8)
= 2.205 in.
Nozzles
Take inlet and outlet nozzles as 100mm diameter.
Vent nozzle
Drain nozzle

= 25mm diameter
= 25mm diameter

Relief Valve

= 50 mm diameter.

Nozzle thickness = [ P x Di ] / { 2 f J - P }
= 0.68 mm
Minimum nozzle thickness is 6mm and 8mm is chosen which includes
thecorrosionallowance.
Transverse baffles
Number of Baffles = 31
Baffle cut = 25%
Baffle thickness = 6mm (standard)

Flange design
Flange is ring type with plain face.
Flange material: IS 2004-1962 Class 2 Carbon Steel
Bolting steel: 5% Chromium, Molybdenum Steel
Gasket Material: Asbestos
Shell OD

= 37.205 in

Shell Thickness = 2.205 in


Shell ID

= 35 in

Allowable stress for flange material = 100 N/mm2


Allowable stress of bolting material = 138 N/mm2

Using matche.com we have estimated cost for this heat exchanger is $158900.

8.4 DEA Contractor Design Calculation


TOP

Bottom

Vapor rate, ft3/sec

4.1

3.73

Liquid rate, ft3/sec

0.49

0.85

Vapor Density, lb/ft3

3.65

3.96

Liquid Density, lb/ft3

70.20

52.00

Surface tension, dynes/cm

45.60

22.00

Assumptions:
Clean service,
No fouling or suspended material,
Tray spacing is to be close as possible, because vertical installation space is a
premium.
All equations and data used here refer to the book A P P L I E D PROCESS D E S I G N
FOR CHEMlCAlANDPETROCHEMICA1 PlANTS, Volume 2, Third Edition by Ernest E.
Ludwig.

Calculation of Tower Diameter


Souders-Brown method
W = C(v)[(l) (v)]
At the Surface Tension 22,
From Figure 8-82, C = 280 for 12-inch tray spacing.
In this case Vapor rates are close and vdoes not change much from bottom to top of tower.
W = 280[3.96(52.00 3.96)]= 3862 lbs/hr (ft2)
3862

= 3600 2.872= 0.3735 ft3/sec (ft2)


Tower cross-section area, A =

4.1

= 0.3735 ft2= 10.98 ft2

Diameter, D = 4 3.1416 = 3.73 ft


Using Hunt equation:
Assuming Height clear liquid in bubbling zone on tray, hc = hw + how = 3 in.
S' = St 2.5 hc = 12 2.5 3 = 4.5 in.

At surface tension = 22.0 dynes/cm,


For Liquid entrained, ew = 5% = 0.05
From Figure 8-121, allowable tower velocity = 1.5ft/sec

Required tower area =

3.73
1.5

= 2.49 ft2 (bottom, largest)

Diameter = 4 2.49 3.1416 = 1.78 ft

Selecting tower diameter = 4.0 ft to meet the requirement of both bottom and top
diameter of the absorber.

Tray Layout Based on 4.0ft Diameter Tower


Using a segmental downcomer on a cross-flow tray.
From the residence time in downcomers for bubble cap trays and at the tray spacing of 12
inches, selecting an allowable liquid velocity of 0.3ft/sec.
Downcomer area = 0.85 0.3= 2.83 ft2
Total tower area =3.1416 4.02 4= 12.57ft2
2.83

Percent of tower area = 12.57 100 % = 22.5%


Using Figure 8-100 for segmental downcomers, at 22.5% downcomer area, the weir length is
89% of tower diameter.
Weir length, lw= 0.894 = 3.56 ft
Since standard details for fabrication are already available for a tray with a 19.5-in. weir in a
30-in. tower (65% of dia.), try this asfirst tray examined. This is 6.8% of tower cross
sectional area.
Downcomer area = 0.068 12.57= 0.86 ft2.

Hole Size
Assuming 3/16-in. dia. 1/2-in. pitch
This is spacing of 2.66do, and is asclose as good design would suggest. Use 1/8 in. tray
thickness.
do

Ratio,= =
C= 2.66do

3/16
1/2

= 0.375

Percent hole area = 12.8% (of perforation area only) as shown in Figure 8-143.

Minimum Hole Velocity: Weeping


Assuming Fs= vo (v)1/2= 13
Assuming Submergence = 3 in. = hsl= hdl (neglecting /2)
water
Dry Tray Pressure drop, hdt = 0.003(vo2 v)
(1 2)/Co2
L
The hole dia
3/16
tray thickness ratio= 1/8 = 1.5
From Figure 8-126, = 0.128
From Figure 8-128, orifice coefficient, Co= 0.78
hdt =

0.003132 64.2(1.1282 )
52.782

= 1.01 in. liquid

Effective head
For hsl= 3, Fs<14
Reading from Figure 8-130; effective head, he= 2.1 in. liquid

Total Wet Tray Pressure Drop


ht= hdt + he = 1.01+2.1 = 3.11 in. liquid

Weep Point
Using Figure 8-131 Curve A, and ht= 3.11 in. liquid
Reading Weep point velocity = 16.5 = vom (v)

1 /2

Because vom (v) /2= 16.5 is greater than the assumed value of 13, the 13 cannot be used.
Assuming new Fs = vo (v)1/2= 20
Assuming Submergence = 2.25 in. = hsl= hdl (neglecting /2)
water
Dry Tray Pressure drop, hdt = 0.003(vo2 v)
(1 2)/Co2
L
The hole dia
3/16
ratio=
= 1.5
tray thickness
1/2
From Figure 8-126, = 0.128

From Figure 8-128, orifice coefficient, Co= 0.78


hdt =

0.003202 64.2(1.1282 )
52.782

= 2.4 in. liquid

New Effective head


For hsl= 2.25, Fs>14
Reading from Figure 8-130; effective head, he= 1.65 in. liquid

New Total Wet Tray Pressure Drop


ht= hdt + he = 2.4 +1.65 = 4.05 in. liquid

Using Figure 8-131 Curve A, and ht= 4.05 in. liquid


1 /2

Reading Weep point velocity = 21.6= vom (v)


1

Because vom (v) /2= 21.6 is greater than the assumed value of 20, the 20 cannot be used.
Assuming new Fs = vo (v)1/2= 25
Assuming Submergence = 1.25-in. = hsl= hdl (neglecting /2)
water
Dry Tray Pressure drop, hdt = 0.003(vo2 v)
(1 2)/Co2

L
The hole dia
3/16
tray thickness ratio= 1/2 = 1.5
From Figure 8-126, = 0.128
From Figure 8-128, orifice coefficient, Co= 0.78
hdt =

0.003252 64.2(1.1282 )
52.782

= 3.74 in. liquid

New Effective head


For hsl=1.25,Fs>14
Reading from Figure 8-130; effective head, he= 1.35 in. liquid

New Total Wet Tray Pressure Drop


ht= hdt + he = 3.74 +1.35 = 5.09 in. liquid

Using Figure 8-131 Curve A, and ht= 5.09 in. liquid


1 /2

Reading Weep point velocity = 24.4= vom (v)

Because vom (v) /2= 24.4 is smaller than the assumed value of 25, the 25.0 is accepted value.

Maximum Hole Velocity at Flood Conditions


1

Assume F, = vo (v) /2= 28 max.


Submergence = 1.25-in. = hsl= hdl (neglecting /2)
0.003282 64.2(1.1282 )

Dry Tray Pressure drop, hdt =

52.782

= 4.65 in. liquid

Effective head, he= 1.35 in. liquid, for Fs>14 and hsl= 1.25 inch
Total wet tray pressure drop, ht= 4.65 + 1.35= 6 inches liquid

Liquid Back-up or Height in Downcomer

Hd= ht+ (hw+ how) + + hd


Hd= 6 + 1.25+ 0 + 0 (assuming and hd to be confirmed)
Hd= 7.25 in. liquid
The limit on Hd for flooding is St/2= 12/2= 6 in.
Therefore Fs= 28 appears to be a good assumption.

Design Hole Velocity


A velocity represented by Fs factor between minimum and maximum limits is to be selected.
28>Design >25
A median value of Fs= 26.5 is selected, because freedom to operate above and below the
design value is preferred in this case.

Design Basis
Fs= 26.5
13. Weir Height selection: hw= 3 inch
14. Weir Length selection:For good design, ratio of weir length to tower diameter is 0.5
to 1.0
Selected weir length lw = 4.0 ft.
Weir length to tower diameter ratio is 1.0
()
2.5

.85448.8
4.02.5

= 11.79

From figure-8-105, correction factor: Fw: 1.0


2/3

()

Francis Formula, how = .092

2/3

.85 448.8

= .092

4.0

in = .92 in

15. Submergence: hsl= (Fw) (hw) + how= (1) (3) + 1.92= 4.92 in. liquid

16. Downcomer pressure loss:


Clearance between bottom of downcomer and plate = 3-in. max. Underflow area =
(43.14161.52 in2.)/144 = 0.2ft2. Because this is less than the down flow area, it must be
used for pressure drop determination. No inlet weir used on this design.
.85448.8 2
Lg 2
hdu= 0.56449A = 0.56[ 449 0.2 ] = 10.1 in liquid

17. Dry tray pressure drop:


hdt =

0.00326.52 64.2(1.1282 )

= 4.25in. liquid

52.782

18. Effective head:


hsl= 4.92 in.
he= 2.55 in. liquid for Fs>14, Figure 8-130

19. Total wet tray pressure drop:


ht= 4.25+ 2.55= 6.8 in. liquid

20. Total tower pressure drop for 20 trays:


(Tower)=

6.820(70.2+52)
17282

= 4.8 psi

4.8 psi is not greater than 5 psi. So, it is satisfactory.

21. Number of holes required:


Assumed Hole size = 3/16 in.
Hole spacing or pitch =1/2 in.
From Figure 8-144, Holes/(in.2 plate area) = 5
Area of a 3/16 -in. hole = 0.0276 in.2

At Design condition: Fs = 26.5

26.5

Top Vapor Velocity, vo,Top = () = 3.65 = 13.87 ft/sec

26.5

Bottom Vapor Velocity, vo,Bottom = = () = 3.96= 13.32 ft/sec


Number of holes required =

Vapor Flow rate 144


vo hole area

4.1144

at Top = 13.87.0276= 1542


3.73144

at Bottom = 13.32.0276= 1461


At Flooding condition: Fs = 28

28

Top Vapor Velocity, vo,Top = () = 3.65 = 14.66 ft/sec

28

Bottom Vapor Velocity, vo,Bottom = = () = 3.96= 14.07 ft/sec


Number of holes required =

Vapor Flow rate 144


vo hole area

4.1144

at Top = 14.66.0276= 1460


3.73144

at Bottom = 14.07.0276= 1383

At Weeping condition: Fs = 25

25

Top Vapor Velocity, vo,Top = () = 3.65 = 13.09 ft/sec

25

Bottom Vapor Velocity, vo,Bottom = = () = 3.96= 12.56ft/sec


Number of holes required =

Vapor Flow rate 144


vo hole area

4.1144

at Top = 13.09.0276= 1634


3.73144

at Bottom = 12.56.0276= 1550

22. Mechanical tray layout details:


A total of 5-in. on diameter for extension of tray ring-type support into the tower. This
reduces available tray area.
Assuming 8-in. clearance (no holes) between inlet downcomer and first row of holes. The 8
in. could be reduced to 5 in. minimum if an inlet weir were used.
Assuming 5-in. clearance (no holes) between outlet weir and adjacent row of holes.

Downcomer width = .12 4= 0.56 ft = 5.76 in (From Figures 8-100 at standard 65% weir
length downcomer width is 12% of Tower diameter).

Area determinations:
Area of segment of circle (2) with chord AD:
Diameter circle (2) = 48 - 5 = 43 in.
Height of chord =

43
2

48

( 2 5.76 8)= 11.26 in.

Chord height/circle dia. H/D =

11.26
43

= 0.26

Referring to Perrys Handbook, (pg. 32, 3rd Ed.)


Area = 0.121 432= 224 in2
Area of segment of circle (2) width chord BC:
Height of chord =
H/D=

43
2

48

( 2 5.76 5)== 8.26 in

8.26
43

= 0.19

Referring to Perrys Handbook, (pg. 32, 3rd Ed.)


Area = 0.071 432= 131.3 in2
Area of circle (2) = 432= 1849 in.2
Area available for holes = 1849 (244+ 131.3) = 1473 in.2
Area required for holes =

1634
5

holes/in2= 326.8 in2.

Number of holes = 1634


Area = 1473 in.2

23.Tower Height
Height of column Hc = (Nact 1)HS +Ht+ Hb +Plate Thickness
No. Of plates = 20
Tray Spacing HS =12 inch
Ht = 5 ft for vapor disengagement
Hb = 2.5ft for liquid hold up
Minimum height of column Htower= (20-1) 1+2.5+5+200.1042

Htower = 26.7 ft

24.Other Mechanical Designs:


Maximum Operating Temperature = 40oC = 313k
Maximum Operating Pressure = 1290 psi = 90.75 kg/cm2

a) Shell Thickness:
Material = SA-516-70 Carbon Steel
Specific Gravity, s = 7.7
Maximum allowable stress, fs = 1300 kg/cm2
Welding efficiency, j = 0.9
Design Pressure, PD = 1.5 Operating Pressure = 1.5 90.75 = 136 kg/cm2
Internal Shell or column Dia, D = 4 ft = 1.2192 m = 1219.2 mm
Here, C = corrosion Allowance = 3 mm
PDD

1361219.2

Thickness, ts= 2 fsj PD + C = 2 1300.9 136+ 3 = 78.23 mm


ts= 78.23 mm

b) Tray:
Thickness = 1/8 inch = 0.125 inch
Material = SA-516-70 Carbon Steel
Sieve Tray,

hole size = 3/16inch,

pitch =1/2 inch, Triangular.

Tray Spacing = 12 inch

c) Support for trays:


A total of 5 inch on diameter for extension of tray ring-type support into the tower.
Material: Carbon steel.

d) Downcomer and Weir:


Material = Carbon steel.

e) Support for Column:

Skirt type,

Height = 10 ft ,

Material = Carbon steel.

f) Heads:
Material = SA-516-70 Carbon steel.
Permissible tensile stress = 1300 kg/cm2
Thickness of Head,
th =

PDRcW
2 fsj
1361219.21.54

2 1300.9

= 109 mm
th = 4.16 inch

g) Insulation and Coating:


Insulating material: Polyurethane
Insulating width: 4 inch

Coating material: Zinc Sulfate


Coating width: 0.06 inch

Rc = Crown Radius =1219.2 mm


1
W = Stress intensification factor = 4 3 +

Rc

Rl

= 1.54 mm
Where, Rl = Knuckle radius = 0.1 Rc

Mechanical Design

8.7 ft

12.0 ft

44.0 ft

Vertical section of gas liquid separator

8.7 ft
12.0 ft

Cross section view of gas liquid separator

Pump

Heat Exchanger

Heat Exchanger

P & ID

V2

Y strainer

V4

PUMP

V5

V3
V1
Figure: P & I diagram for centrifugal pump
0-100
deg

S-4

S-1
mV
10-50

S-3

AC

I-3

Xsp

S-2

AT

P-2

P-4

P-2

Vapor
phase
P-8

LI
P-5

P-7

light

P-1
P-6

feed

V-1

E-1

P-3

Figure: P & I diagram for gas liquid separator

Liquid phase

AC

Heated glycol
To absorber

P/I

TT
Dry gas
TI

Preheated glycol

Sales gas

Figure: P & I diagram for Heat exchanger

Plot Plan

Economic Analysis

14.1 Estimation of Total Capital


Investment and Production Cost
Table 12.1: Equipment cost for Heat Exchanger

Equipment

Identification
No.

Quantity

US $

Floating head HE

E-100

80,000

Floating head HE

E-102

158,000

Total=

238,000

Table 12.2: Equipment cost for Pumps


Equipment
Centrifugal
Pump
Centrifugal
Pump

Identification No.

Quantity

US $

P-101

9400

P-100

12900

Total =

22300

Table 12.3: Equipment cost for Compressor

Equipment

Identification
No.

Reciprocating Compressor K-100

Quantity

US $

35600

Table 12.4: Equipment cost for Storage Tanks


Equipment

Storage Tank

Identification
No.
V-106

Quantity

US $

6300

Table 12.5: Equipment cost for Adsorption Column


Equipment

Identification
No.

Quantity

US $

Glycol Absorber

T-101

220,000

DEA Contractor

T-100

260,000

Total =

480,000

Quantity

US $

Table 12.6: Equipment cost for Regenerator Column


Equipment

Identification
No.

Glycol Stripper

V-103

145000

DEA Stripper

V-102

19000

Total =

164000

Quantity

US $

7600

Table 12.7: Equipment cost for Stabilizer

Equipment

Stabilizer

Identification
No.
V-105

Table 12.8: Equipment cost for 2 phase Separators

Equipment

Identification
No.

Quantity

US $

Separator

V-100

2200

Separator

V-101

1900

Separator

V-104

400

Total =

4500

Total Equipment cost in the year 2002 = $ 958300


index value at present
Total Equipment cost at present (2014) = $ 958300 index value at 2002
= $ 958300

443.26
390.4

= $ 1.088 million.

Table 12.9: Estimation of Capital Investment

Items

Percentage

of

Purchased Cost

Equipment Cost

Million $

Purchased equipment

100

1.088

Purchased equipment installation

47

0.511

Instrumentation and control

20

0.22

Piping (installed)

68

0.74

Electrical (installed)

11

0.12

Building

18

0.196

Yard improvement

10

0.1088

Service facilities

70

0.762

Land

0.0653

Total direct plant cost

350

3.81

Engineering and supervision

33

0.36

Construction & expenses

41

0.45

Contractors fee

22

0.24

Contingency

42

0.46

488

5.32

Indirect Cost

Fixed capital investment


(Indirect + Direct cost)

Working capital investment


73.2

0.8

561

6.12

(15% of total capital investment)

Total Capital Investment

Ref: Plant Design and Economics by Peter and Timmerhaus; page-251

Table 12.10: Manufacturing Expenses


(Working day basis 330day/yr)
Cost /yr
Cost type

Item
$ Million
Major Raw Material
Raw Gas

3.75/1000 scf

7.2

TEG

0.75 $/lb

0.82

DEAmine

0.6 $/lb

0.02

Cost of Raw materials

Direct

$ 8.04

Operating labor

(10% of RM)

0.804

Supervisory & Clerical


labor

(10% of Opt.
labor)

0.0804

Utilities

0.55

Maintenance & repair


(20% of FC)

1.064

Opt. expenses (10% of


resistance & repair)

0.1064

Laboratory charges
0.01064
(10% of opt. labor)
Total direct manufacturing expenses

$ 10.66

Overhead (payroll &


plant), Packing, storage
(50% of opt. labor plus
supervision &
maintenance

0.085

Local taxes (9%of Fixed

0.4788

capital)
Insurance (0.4% of fixed
capital)
Total annual indirect manufacturing expenses
Total manufacturing expenses

0.0213

$ 0.5851
$ 11.24

Depreciation (10%
of fixed capital for
machinery &
equipment)
General Expenses

0.532

Administrative Cost (20% of Operating labor)

0.1608

Distribution of selling cost ( 10% of total


manufacturing expenses)

1.124

Research & development (5% of total expenses)

0.18

Total annual expenses

Economic Analysis
Percent rate of return
Gas production = 2.92 105 ft3/hr = 2.32 109 scf/year
LPG production = 2356 ton/year
Total sale = $31.34 million
Total income =31.34 13.24 = $ 18.1 million
Net profit after tax = $ 15.4 million (15% Tax)
Total investment cost = $ 6.12 million

$ 13.24

Depreciation of fixed capital investment (FCI)


Project life = 20 yr
Salvage value at the end of the project life = 0.15.32= $ 0.532 million
Total depreciation = 0.95.32 = $ 4.788 million
Now depreciation by sinking fund method with 15% interest rate,
= Depreciable FCI (A/P, 15%, 20)
0.15 1.1520
= 4.788 1.1520 1
= $ 0.765 million/yr

Cash flow diagram

Payback period calculation


Formula uses
F = P(1 + ) ,
=

(1 + ) 1
(1 + )

Assumed MARR is 15%


1st yr
P0= - $6.12million
So, F1= -$7.04 million
Cost = -$13.24 million
Profit = $15.4 million
So, net cash P1 = -$4.88 million
2nd yr
P1 = -$4.88 million
So, F2= -$5.612 million
Cost = -$13.24 million
Profit = $15.4 million
So, net cash P2 = -$3.452 million

3rd yr
P2 = -$3.452 million
So, F3= -$3.97 million
Cost = -$13.24 million
Profit = $15.4 million
So, net cash P3 = -$1.81 million
4th yr
P3= -$1.81 million
So, F4= -$2.08 million
Cost = -$13.24 million
Profit = $15.4 million
So, net cash P4 = $0.08million
Here, net positive cash flow produced, which indicate the payback period.
By linear interpolation, actual payback period is 3.96 yr (3 yr 11month 15 day)
5th yr
P4= -$0.08 million
So, F5= $0.92 million
Cost = -$13.24 million
Profit = $15.4 million
So, net cashP5 = $ 2.252 million

IRR calculation
In annual worth (AW) method:
Total annual revenue, R= $ (15.4 13.24) = $ 2.16 million
AW= -$6.12 million (A/P, i%, 20) + $ 2.16 million + $ 0.532 million (A/F, i%, 20)
i% (assumption)

AW($,million)

20

0.903

40

-0.2897

By linear interpolation, for AW is 0 i% = 35.17%> 15% (MARR)

ERR calculation
Ek( P/F, %,k)(F/P, i%, N) = Rk(F/P, %, N-k)
Where,
% = 15 %
N = 20 yr
Using the above equation, i% = 19.67 %> 15% (MARR)

Appendix

Reference

Ludwig, E.E Applied Process Design for Chemical and Petrochemical Plants, 3
volm,2ndedn, Gulf Pub.

Peters and Timmerhaus, Plant Design and Economics from Chemical Engineers,
4thedn, McGraw Hill (1991)

Phillip C. Wankat, Equilibrium stage separations, prentice hall

A.K.M. Abdul Quader, Design and Building of Process Plant, World University
Service.

Bassel, W.D, Preliminary Chemical Engineering Plant Design, Elsevier Pub, New
York (1976)

Rudd, D.F. and C.C Watson, Strategy of Process engineering, Wiley (1968)

Vilbrandt, F.C and C.E Dryden, Chemical Engineering Plant Design, 4thedn,
McGraw-Hill (1959)

Modern cost Engineering: Methods and Data, compiled and edited by Chemical
Engineering , McGraw-Hill(1979)

Ludwig, E.E Applied Project Engineering and Management, 3rdedn,Gulf Pub.

George T. Austin, Shreves Chemical Process Industries, 5thedn, McGraw-Hill (1954)

RifatM.Dakhil, SataK.Ajjam; General Operating Problems and Their Solutions of


Natural Gas Sweetening Process (Amine System).

http://www.lessmytax.com/cost-inflation-index/

http://allinfoindia.com/eLearning/Income%20tax/current%20index%20of%20capital
%20gain.htm