Sunteți pe pagina 1din 2

57940 Federal Register / Vol. 71, No.

190 / Monday, October 2, 2006 / Notices

Docket Numbers: ER06–917–001. must file in accordance with Rules 211 DEPARTMENT OF ENERGY
Applicants: PacifiCorp. and 214 of the Commission’s Rules of
Description: PacifiCorp submits its Practice and Procedure (18 CFR 385.211 Federal Energy Regulatory
Sixth Revised Volume 11 Pro Forma and 385.214) on or before 5 p.m. Eastern Commission
Open Access Transmission Tariff time on the specified comment date. It
conforming to the requirements of Order Notice of Petition for Declaratory Order
is not necessary to separately intervene
614. and Soliciting Comments, Motions To
again in a subdocket related to a
Filed Date: 8/23/2006. Intervene, and Protests
compliance filing if you have previously
Accession Number: 20060824–0021. intervened in the same docket. Protests September 26, 2006.
Comment Date: 5 p.m. Eastern time
will be considered by the Commission Take notice that the following
on Wednesday, September 13, 2006.
in determining the appropriate action to application has been filed with the
Docket Numbers: ER06–1047–002; be taken, but will not serve to make Commission and is available for public
ER06–451–006. inspection:
protestants parties to the proceeding.
Applicants: Southwest Power Pool, a. Application Type: Petition for
Anyone filing a motion to intervene or
Inc. Declaratory Order.
Description: Southwest Power Pool, protest must serve a copy of that
document on the Applicant. In reference b. Docket No.: DI06–4–000.
Inc. submits a compliance filing c. Date Filed: September 11, 2006.
providing for revisions to its Open to filings initiating a new proceeding,
interventions or protests submitted on d. Applicant: Haneline Power LLC.
Access Transmission Tariff pursuant to e. Name of Project: Henry River
FERC’s 7/20/06 Order. or before the comment deadline need
Project.
Filed Date: 8/21/2006. not be served on persons other than the
f. Location: The Henry River Project is
Accession Number: 20060823–0053. Applicant.
located on the Henry River, Burke
Comment Date: 5 p.m. Eastern time The Commission encourages County, Henry River, North Carolina.
on Monday, September 11, 2006. electronic submission of protests and The project does not occupy any tribal
Docket Numbers: ER06–1272–001. interventions in lieu of paper, using the or Federal lands.
Applicants: Reliant Energy Power FERC Online links at http:// g. Filed Pursuant to: Section 23(b)(1)
Supply, LLC. www.ferc.gov. To facilitate electronic of the Federal Power Act, 16 U.S.C.
Description: Reliant Energy Power service, persons with Internet access 817(b).
Supply, LLC submits a clean version who will eFile a document and/or be h. Applicant Contact: Douglas Allen
and blacklined version of its revised listed as a contact for an intervenor Haneline, 3379 Amity Hill Road,
tariff which was submitted on 7/21/06. Statesville, NC 28677; Telephone: (704)
must create and validate an
Filed Date: 8/22/2006. 450–9129; Fax: (704) 873–0936.
Accession Number: 20060823–0137. eRegistration account using the
eRegistration link. Select the eFiling i. FERC Contact: Any questions on
Comment Date: 5 p.m. Eastern time this notice should be addressed to
on Tuesday, September 12, 2006. link to log on and submit the
intervention or protests. Henry Ecton (202) 502–8768, or E-mail:
Docket Numbers: ER06–1331–001. henry.ecton@ferc.gov.
Applicants: CalPeak Power LLC. Persons unable to file electronically j. Deadline for filing comments and/
Description: CalPeak Power LLC should submit an original and 14 copies or motions: October 27, 2006.
submits a limited amendment to its 8/ of the intervention or protest to the All documents (original and eight
2/06 filing to amend the language in Federal Energy Regulatory Commission, copies) should be filed with: Magalie R.
Section 10 Change in Status etc. 888 First St., NE., Washington, DC Salas, Secretary, Federal Energy
Filed Date: 8/18/2006. 20426. Regulatory Commission, 888 First
Accession Number: 20060823–0054. Street, NE., Washington, DC 20426.
The filings in the above proceedings
Comment Date: 5 p.m. Eastern time Comments, protests, and interventions
on Friday, September 8, 2006. are accessible in the Commission’s
eLibrary system by clicking on the may be filed electronically via the
Docket Numbers: ER06–1355–001. Internet in lieu of paper. Any questions,
appropriate link in the above list. They
Applicants: Evergreen Wind Power, please contact the Secretary’s Office.
LLC. are also available for review in the
Commission’s Public Reference Room in See, 18 CFR 385.2001(a)(1)(iii) and the
Description: Evergreen Wind Power, instructions on the Commission’s Web
LLC submits an amended FERC Electric Washington, DC. There is an
site at: http://www.ferc.gov.
Tariff, Original Volume No. 1. eSubscription link on the Web site that
Please include the docket number
Filed Date: 8/23/2006. enables subscribers to receive e-mail
(DI06–4–000) on any protests,
Accession Number: 20060824–0082. notification when a document is added comments and/or motions filed.
Comment Date: 5 p.m. Eastern time to a subscribed dockets(s). For k. Description of Project: The run-of-
on Wednesday, September 13, 2006. assistance with any FERC Online river project consists of: (1) An existing
Docket Numbers: ER06–1391–000. service, please e-mail 35-foot-high, 220-foot-long concrete and
Applicants: San Diego Gas & Electric FERCOnlineSupport@ferc.gov. or call stone dam, with 36-inch-high
Company. (866) 208–3676 (toll free). For TTY, call flashboards; (2) a reservoir with a
Description: San Diego Gas & Electric (202) 502–8659. surface area of approximately 12 acres;
Co. submits the Power Flow Altering (3) a powerhouse containing one 375
Magalie R. Salas,
Device Memorandum of Understanding kW generator and one 150 kW generator;
with Imperial Irrigation District. Secretary.
(4) a 300-foot-long tailrace; and (5)
Filed Date: 8/22/2006. [FR Doc. E6–16265 Filed 9–29–06; 8:45 am]
rmajette on PROD1PC67 with NOTICES1

appurtenant facilities. The facility is


Accession Number: 20060823–0136. BILLING CODE 6717–01–P connected to an interstate grid.
Comment Date: 5 p.m. Eastern time When a Petition for Declaratory Order
on Tuesday, September 12, 2006. is filed with the Federal Energy
Any person desiring to intervene or to Regulatory Commission, the Federal
protest in any of the above proceedings Power Act requires the Commission to

VerDate Aug<31>2005 15:07 Sep 29, 2006 Jkt 211001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\02OCN1.SGM 02OCN1
Federal Register / Vol. 71, No. 190 / Monday, October 2, 2006 / Notices 57941

investigate and determine if the comments within the time specified for 5041–000, 82 FERC Par. 62, 164 (March
interests of interstate or foreign filing comments, it will be presumed to 10, 1998).
commerce would be affected by the have no comments. One copy of an Rate Order WAPA–98, approved by
project. The Commission also agency’s comments must also be sent to the Secretary of Energy on September
determines whether or not the project: the applicant’s representatives. 13, 2002 (67 FR 60655, September 26,
(1) Would be located on a navigable 2002), extended WAPA–75 through
Magalie R. Salas, September 30, 2004. Rate Order WAPA–
waterway; (2) would occupy or affect
public lands or reservations of the Secretary. 113, approved by the Deputy Secretary
United States; (3) would utilize surplus [FR Doc. E6–16145 Filed 9–29–06; 8:45 am] on September 2, 2004 (69 FR 55429,
water or water power from a BILLING CODE 6717–01–P September 14, 2004), extended WAPA–
government dam; or (4) if applicable, 75 through September 30, 2006.
has involved or would involve any Western is currently conducting a
construction subsequent to 1935 that DEPARTMENT OF ENERGY formal re-marketing process for the
may have increased or would increase Parker-Davis Project. One of the effects
the project’s head or generating Western Area Power Administration of this re-marketing effort is an increase
capacity, or have otherwise significantly in firm electric service capacity that will
Parker-Davis Project—Rate Order No.
modified the project’s pre-1935 design be available October 1, 2008, creating a
WAPA–131
or operation. larger resource pool and making
l. Locations of the application: Copies AGENCY: Western Area Power additional capacity and energy available
of this filing are on file with the Administration, DOE. to new contractors. Western is seeking
Commission and are available for public this extension to provide adequate time
ACTION: Notice of Order Extending Firm
inspection. This filing may be viewed to consider the effect of the additional
on the Web at http://www.ferc.gov using Electric Service and Transmission capacity on the rates and to consider the
the ‘‘eLibrary’’ link. Enter the docket Service Rate Methodologies. input of the public including the
number excluding the last three digits in additional contractors. Because the
SUMMARY: This action is to extend the
the docket number field to access the current rate methodologies contain
existing Parker-Davis Project (P–DP)
document. For assistance, please contact formula rates recalculated from yearly
Firm Electric Service Rate Schedule PD–
FERC Online Support at updated financial and load data and
F6 and the Transmission Service Rate
FERCOnlineSupport@ferc.gov or toll- Western seeks to involve new
Schedules PD–FT6, PD–FCT6, and PD–
free at (866) 208–3676, or TTY, contact contractors in the rate process, Western
NFT6 through September 30, 2008.
(202) 502–8659. proposes to extend the current rate
m. Individuals desiring to be included Without this action, the existing Firm
Electric Service and Transmission schedules under 10 CFR part 903. Rate
on the Commission’s mailing list should Order WAPA–75, previously extended
so indicate by writing to the Secretary Services rates will expire September 30,
2006, and no rates will be in effect for under Rate Order No. WAPA–98 and
of the Commission. Rate Order No. WAPA–113, will be
n. Comments, Protests, and/or these services. These Firm Electric
Service and Transmission Service further extended under Rate Order No.
Motions to Intervene: Anyone may WAPA–131.
submit comments, a protest, or a motion Schedules contain formula rates
Western’s existing formula
to intervene in accordance with the recalculated from yearly updated
Transmission Service Rate Schedules
requirements of Rules of Practice and financial and load data.
and Electric Service Rate Schedules,
Procedure, 18 CFR 385.210, .211, .214. FOR FURTHER INFORMATION CONTACT: Mr. recalculated annually, will recover
In determining the appropriate action to Jack Murray, Rates Team Lead, Desert sufficient project expenses (including
take, the Commission will consider all Southwest Customer Service Region, interest) and capital requirements
protests or other comments filed, but Western Area Power Administration, through September 30, 2008.
only those who file a motion to P.O. Box 6457, Phoenix, AZ 85005– Following review of Western’s
intervene in accordance with the 6457, (602) 605–2442, or e-mail proposal within the DOE, I hereby
Commission’s Rules may become a jmurray@wapa.gov. approve Rate Order No. WAPA–131
party to the proceeding. Any comments, which extends the existing P–DP Firm
protests, or motions to intervene must SUPPLEMENTARY INFORMATION: By
Electric Service and Transmission
be received on or before the specified Delegation Order No. 00–037.00,
Service Rates through September 30,
comment date for the particular effective December 6, 2001, the
2008.
application. Secretary of Energy delegated: (1) The
authority to develop power and Dated: September 22, 2006.
o. Filing and Service of Responsive
Documents: Any filings must bear in all transmission rates to Western’s Clay Sell,
capital letters the title ‘‘COMMENTS’’, Administrator; (2) the authority to Deputy Secretary.
‘‘PROTESTS’’, and/or ‘‘MOTIONS TO confirm, approve, and place such rates Department of Energy, Deputy
INTERVENE’’, as applicable, and the into effect on an interim basis to the Secretary
Docket Number of the particular Deputy Secretary of Energy, and (3) the
application to which the filing refers. A authority to confirm, approve, and place In the Matter of: Western Area Power
copy of any motion to intervene must into effect on a final basis, to remand, Administration Rate Extension for the
also be served upon each representative or to disapprove such rates to the Parker-Davis Project Firm Electric
of the applicant specified in the Federal Energy Regulatory Commission Service and Transmission Service Rate
particular application. (Commission). Methodologies; Order Confirming and
Approving an Extension of the Parker-
rmajette on PROD1PC67 with NOTICES1

p. Agency Comments: Federal, State, This action is to further extend the


and local agencies are invited to file existing Parker-Davis Project Rate Order Davis Project Firm Electric Service and
comments on the described application. No. WAPA–75, that was originally Transmission Service Rate
A copy of the application may be approved for 5 years, beginning Methodologies
obtained by agencies directly from the November 1, 1997, through September These Firm Electric Service and
applicant. If an agency does not file 30, 2002. See FERC Docket No. EF98– Transmission Service Rate

VerDate Aug<31>2005 15:07 Sep 29, 2006 Jkt 211001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\02OCN1.SGM 02OCN1

S-ar putea să vă placă și