Sunteți pe pagina 1din 2

57584 Federal Register / Vol. 71, No.

189 / Friday, September 29, 2006 / Notices

operating period. The preclosure 16. Comment. It is unclear to the NUCLEAR REGULATORY
operating period of the Yucca Mountain commenter whether the guidance COMMISSION
repository may affect the ISG–01 directs NRC staff to use the suggested
methodology results in two ways: (i) In methodology or merely offers an Notice of Availability of Draft Interim
categorization of seismically initiated alternative among possible methods. To Staff Guidance Document HLWRS–
event sequences (e.g., one chance in reduce uncertainty, the commenter ISG–02, Preclosure Safety Analysis—
10,000 of occurrence during the suggests that it would be helpful if NRC Level of Information and Reliability
preclosure period specified in Part 63 provided explicit guidance as to how Estimation
for category 2 event sequences); and (ii) the selection of an appropriate
in development of the SSCs ITS seismic AGENCY: Nuclear Regulatory
methodology would be made, and Commission.
fragility curves, with potential changes
when, if at all, a given methodology ACTION: Notice of availability.
in material properties resulting from
degradation during the preclosure might be unacceptable for use. The
period. Staff believes that the commenter believes that the discretion FOR FURTHER INFORMATION CONTACT: Jon
uncertainties, considered in the seismic in choice of methods appears to Chen, Project Manager, Project
hazard and SSCs ITS fragility curves introduce unwarranted ambiguity and Management Section B, Division of
development, would sufficiently uncertainty. High-Level Waste Repository Safety,
account for potential materials Response. An ISG provides guidance Office of Nuclear Material Safety and
degradation during the preclosure to NRC staff on suggested methodologies Safeguards, U.S. Nuclear Regulatory
period. to use during the review of a potential Commission, Washington, DC 20005–
No changes were made to the ISG as license application, and do not imply a 0001. Telephone: (301) 415–5526; fax
a result of this comment. preferred methodology that an applicant number: (301) 415–5399; e-mail:
15. Comment. Two commenters stated jcc2@nrc.gov.
must use. The review approach in an
that the example provided in Appendix
ISG provides a framework for staff to SUPPLEMENTARY INFORMATION:
A raises questions as to whether NRC
has adequately considered the geometric conduct an efficient review, consistent
I. Introduction
consequence of closely spaced, with regulatory requirements. DOE has
recurring, seismic events in determining the option of proposing alternative The Yucca Mountain Review Plan
the mean seismic hazard and related methodologies to comply with the (YMRP) (July 2003, NUREG–1804,
failure probability of an SSC ITS. regulations, which the staff would Revision 2) provides guidance for U.S.
HLWRS–ISG–01 and/or the YMRP may evaluate during its review of the License Nuclear Regulatory Commission (NRC)
need to be revised to ensure that such Application. Methodologies that staff to evaluate a U.S. Department of
characteristics of seismic hazard and demonstrate compliance with the Energy license application for a geologic
related failure probability are regulations, and have adequate repository. NRC has prepared Interim
appropriately considered in computing technical bases, would be acceptable for Staff Guidance (ISG) to provide
SSC ITS probability of failure during a staff review. clarifications or refinements to the
seismic event. guidance provided in the YMRP. NRC is
No changes were made to the ISG as soliciting public comments on Draft
Response. The example of Appendix a result of this comment.
A is based on a hypothetical seismic HLWRS–ISG–02, which will be
hazard curve selected only for FOR FURTHER INFORMATION CONTACT: Jon considered in the final version or
illustrative purpose. However, for the Chen, Project Manager, Division of subsequent revisions to HLWRS–ISG–
development of the Yucca Mountain High-Level Waste Repository Safety, 02.
site-specific mean seismic hazard curves Office of Nuclear Material Safety and II. Summary
(Reference, Section 6.4), DOE’s current Safeguards, U.S. Nuclear Regulatory
approach evaluates the potential of The purpose of this notice is to
Commission, Washington, DC 20005–
closely spaced, recurring, seismic events provide the public with an opportunity
0001 (Telephone: (301) 415–5526; fax
by considering simultaneous multiple to review and comment on draft
number: (301) 415–5399; e-mail: HLWRS-ISG–02, which is to
ruptures on parallel dipping faults, and jcc2@nrc.gov); Mahendra Shah, Senior
increasing the ground motion supplement the YMRP for the NRC staff
Level Advisor, Division of High-Level review of design and operation
parameters for a given probability of Waste Repository Safety, Office of
exceedance value. Since the effects of information and reliability estimates
Nuclear Material Safety and Safeguards, required for the preclosure safety
the closely spaced, recurring, seismic U.S. Nuclear Regulatory Commission,
events are considered in the seismic analysis. This ISG supplements sections
Washington, DC 20005–0001 2.1.1, 2.1.1.2, 2.1.1.4, 2.1.1.6, and 2.1.1.7
hazard curve, staff believes that the
(Telephone: (301) 415–8537; fax of the YMRP. This guidance also
ISG–01 methodology would result in an
number: (301) 415–5399; e-mail: provides examples that illustrate
appropriate value of the failure
probability of an SSC ITS, and that ISG– mjs3@nrc.gov) commonly used approaches for
01 or the YMRP need not be revised. Dated at Rockville, Maryland, this 22nd estimating reliability and the level and
day of September 2006. types of supporting design and
[Reference: Civilian Radioactive Waste operation information that would be
Management System, Management and For the Nuclear Regulatory Commission.
Operating Contractor (CRWMS, M&O), 1998,
necessary for structures, systems, and
N. King Stablein, components (SSCs) at the geologic
Probabilistic Seismic Hazard Analyses for
Fault Displacement and Vibratory Ground Chief, Project Management Section B, repository operations area. A sufficient
Motion at Yucca Mountain, Nevada (I. G. Division of High-Level Waste Repository level of information and adequate
jlentini on PROD1PC65 with NOTICES

Wong and J. C. Stepp, coordinators), report Safety, Office of Nuclear Material Safety and technical bases for reliability estimates
prepared for U. S. Geological Survey, 3 Safeguards. are needed to demonstrate compliance
Volumes] [FR Doc. E6–16017 Filed 9–28–06; 8:45 am] with the performance objectives in Code
No changes were made to the ISG as BILLING CODE 7590–01–P of Federal Regulations, Title 10, Part 63,
a result of this comment. Section 63.111 (10 CFR 63.111).

VerDate Aug<31>2005 20:43 Sep 28, 2006 Jkt 208001 PO 00000 Frm 00125 Fmt 4703 Sfmt 4703 E:\FR\FM\29SEN1.SGM 29SEN1
Federal Register / Vol. 71, No. 189 / Friday, September 29, 2006 / Notices 57585

III. Further Information can access NRC’s Agencywide table. If an individual does not have
Documents Access and Management access to ADAMS or if there are
The documents related to this action System (ADAMS), which provides text problems in accessing the documents
are available electronically at NRC’s and image files of NRC’s public located in ADAMS, contact the NRC
Electronic Reading Room, at http:// documents. The ADAMS accession Public Document Room Reference (PDR)
www.nrc.gov/reading-rm/adams.html. numbers for the documents related to staff at 1–800–397–4209 or (301) 415–
From this site, a member of the public this notice are provided in the following 4737, or by e-mail, at pdr@nrc.gov.

ADAMS acces-
ISG sion number

Draft HLWRS–ISG–02, ‘‘Preclosure Safety Anaylsis—Level of Information and Reliability Estimation’’ ........................................ ML062360241

These documents may also be viewed Representative (USTR) requests written alteration by Bulgaria and Romania of
electronically on the public computers submissions from the public concerning tariff rate quotas (TRQs) on various
located at NRC’s PDR, O–1F21, One the implications for U.S. trade in goods products (to make them compatible with
White Flint North, 11555 Rockville and services of the anticipated EU TRQs), and harmonization of
Pike, Rockville, MD 20852. The PDR enlargement of the European Union Bulgarian and Romanian country
reproduction contractor will copy (EU) to include Bulgaria and Romania. regulatory requirements with EU
documents, for a fee. Comments and USTR and other agencies are regulations affecting the import of
questions on draft HLWRS–ISG–02 currently engaged in an assessment of various goods and services.
should be directed to the NRC contact the potential impact on U.S. goods and Under WTO rules, the EU must notify
listed below by November 13, 2006. services trade of the anticipated other WTO members of its intent to
Comments received after this date will enlargement of the EU and, in modify or withdraw market access
be considered if it is practical to do so, particular, any compensatory commitments it has made on goods and
but assurance of consideration cannot adjustments that may be due under services in order to expand the EU to
be given to comments received after this WTO rules. Comments from the public include Bulgaria and Romania. To date,
date. in response to this notice will be the EU has not sent such notifications
Contact: Robert Johnson, Project incorporated into that assessment. to the WTO, though the United States
Manager, Licensing and Inspection DATES: Submissions must be received on expects these to be made shortly.
Directorate, High-Level Waste or before noon, October 30, 2006. Goods
Repository Safety Division of the Office ADDRESSES: Submissions by electronic
of Nuclear Material Safety and Applicable GATT 1994 Procedures: If
mail: FR0628@ustr.eop.gov. a WTO Member joining a customs union
Safeguards, U.S. Nuclear Regulatory Submissions by facsimile: Gloria Blue,
Commission, Washington, DC 20005– plans to modify the concessions bound
Executive Secretary, Trade Policy Staff in its WTO Schedule of Concessions
0001. Comments can also be submitted Committee (TPSC), Office of the USTR,
by telephone, fax, or e-mail, which are (‘‘bound concessions’’)—for example, by
at (202) 395–6143. raising duties or adjusting tariff rate
as follows: telephone: (301) 415–6900;
FOR FURTHER INFORMATION CONTACT: For quotas—it must negotiate with certain
fax number: (301) 415–5399; or e-mail:
rkj@nrc.gov. procedural questions concerning public key trading partners under Articles
comments, contact Gloria Blue, XXIV:6 and XXVIII of the General
Dated at Rockville, Maryland, this 25th day Executive Secretary, TPSC, Office of the Agreement on Tariffs and Trade 1994
of September 2006. USTR, 1724 F Street, NW., Washington, (‘‘GATT 1994’’). Unless these
For the Nuclear Regulatory Commission. DC 20508, telephone (202) 395–3475. negotiations result in agreement on
N. King Stablein, Substantive questions concerning this compensatory adjustments to offset the
Chief, Project Management Section B, review should be addressed to Laurie Member’s modification of concessions
Division of High-Level Waste Repository Molnar, Director for European and (for example, through reduction of
Safety, Office of Nuclear Material Safety and Mediterranean Trade Issues, Office of duties on other products), the affected
Safeguards. the U.S. Trade Representative, trading partners are entitled to
[FR Doc. E6–16018 Filed 9–28–06; 8:45 am] Telephone (202) 395–3320. withdraw substantially equivalent
BILLING CODE 7590–01–P
SUPPLEMENTARY INFORMATION: concessions that had previously been
negotiated with the Member.
1. Background Information Submissions: The public is
OFFICE OF THE UNITED STATES On April 25, 2005, Bulgaria and encouraged to identify on a country-
TRADE REPRESENTATIVE Romania signed a Treaty of Accession to specific basis where Bulgaria or
the European Union. The European Romania’s adoption of the EU common
Request for Public Comment on the Commission announced on September external tariff will result in tariff
Implications for U.S. Commercial 26, 2006, that Romania and Bulgaria increases or changes to tariff-rate quotas
Interests of the Accession to the will accede to the European Union on (TRQs) affecting U.S. commercial
European Union of Bulgaria and January 1, 2007. interests in the accession countries.
Romania As part of the EU accession process, Current applied tariff rates for
AGENCY: Office of the United States Bulgaria and Romania are required to Bulgaria can be found on the following
Trade Representative. adopt the EU’s common body of law or Web site: http://www.en.customs.bg/
jlentini on PROD1PC65 with NOTICES

ACTION: Request for Comment. acquis communautaire. This will entail, index_en.html. Current applied tariff
inter alia, adoption by Bulgaria and rates for Romania can be obtained by
SUMMARY: The Trade Policy Staff Romania of the EU’s common external calling the Trade Information Center at
Committee gives notice that the Office tariffs for goods imported from third the Department of Commerce at: 1–800–
of the United States Trade countries, possible adoption or USA–TRADE, selecting the option for

VerDate Aug<31>2005 20:43 Sep 28, 2006 Jkt 208001 PO 00000 Frm 00126 Fmt 4703 Sfmt 4703 E:\FR\FM\29SEN1.SGM 29SEN1

S-ar putea să vă placă și