Sunteți pe pagina 1din 2

Federal Register / Vol. 71, No.

168 / Wednesday, August 30, 2006 / Notices 51609

in the e-Library docket number field. alan.mitchnick@ferc.gov; or Emily (866) 208–3372 (voice) or 202–502–8659
For assistance, e-mail FERC Online Carter at (202) 502–6512, (TTY), or send a fax to 202–208–2106
Support at emily.carter@ferc.gov. with the required accommodations.
FERCOnlineSupport@ferc.gov or call All intervening parties are permitted
Magalie R. Salas,
toll-free at 1–866–208–3676, or for TTY, to attend. For further information please
Secretary.
(202) 502–8659. contact Laurel Hyde at (202) 502–8146
You are invited to attend any or all of [FR Doc. E6–14395 Filed 8–29–06; 8:45 am]
or e-mail laurel.hyde@ferc.gov or
the public meetings that will be held to BILLING CODE 6717–01–P
Melissa Nimit at (202) 502–6638 or e-
receive comments on the draft EIS. mail melissa.nimit@ferc.gov.
Additional Public Meeting DEPARTMENT OF ENERGY Magalie R. Salas,
In addition to previously scheduled Secretary.
Federal Energy Regulatory
public meetings in Boise (September 7 [FR Doc. E6–14401 Filed 8–29–06; 8:45 am]
Commission
and 8, 2006) and Weiser (September 12, BILLING CODE 6717–01–P
2006), Idaho, and Halfway, Oregon [Docket Nos. ER06–1099–000; ER06–1099–
(September 11, 2006), FERC staff will 001]
conduct an additional public meeting in DEPARTMENT OF ENERGY
Lewiston, Idaho. The time and location Midwest Independent Transmission
of the additional meeting is as follows: System Operator, Inc.; Notice of Federal Energy Regulatory
Technical Conference Commission
Lewiston, ID
August 25, 2006.
Date: September 13, 2006. Take notice that the Commission will [Project No. 2106—047–California]
Time: 7 to 9 p.m. (PDT). convene a technical conference on
Place: Lewiston Community Center. Pacific Gas and Electric; Notice of Site
September 26, 2006, from 9 a.m. to 4
Address: 1424 Main Street, Lewiston, Visit
p.m. (EST), in Hearing Room 4 at the
ID 83501. (A parking lot is available on
offices of the Federal Energy Regulatory
G Street behind the Community Center.) (August 23, 2006).
At these meetings, resource agency Commission, 888 First Street, NE.,
Washington, DC 20426. On September 19 and September 20,
personnel and other interested persons
The technical conference will address 2006, the Federal Energy Regulatory
will have the opportunity to provide
issues related to the Midwest ISO’s Commission (Commission) Staff and
oral and written comments and proposed shortage and emergency Pacific Gas and Electric Company, the
recommendations regarding the draft procedures, as discussed in the applicant, will conduct an on-site visit
EIS. The meetings will be recorded by Commission’s August 4, 2006 Order in of the McCloud-Pit Project located on
a court reporter, and all statements this proceeding.1 Specifically the the McCloud and Pit Rivers in Shasta
(verbal and written) will become part of Commission directed Commission staff County, California. Under the Integrated
the Commission’s public record for the to examine the reserves impacted and Licensing Process (ILP), the Commission
project. These meetings are posted on circumstances associated with the conducts its National Environmental
the Commission’s calendar located at different steps of the procedures, the Policy Act (NEPA) scoping meeting
http://www.ferc.gov/EventCalendar/ development of the proxy price, the within 90 days of the filing of the
EventsList.aspx along with other related rationale for the pricing mechanism applicant’s Notice of Intent and Pre-
information. adopted, the application of market
Whether or not you attend one of Application Document. A site visit is
power mitigation within the process, the typically held in conjunction with that
these meetings, you are invited to effects upon Revenue Sufficiency
submit written comments on the draft scoping meeting; however, scoping for
Guarantee payments, how demand this project is currently planned for
EIS. Comments should be filed with response may or may not be integrated,
Magalie R. Salas, Secretary, Federal October 23 and 24, 2006 and access to
and the effects upon reliability of the some project facilities may be limited by
Energy Regulatory Commission, 888 new procedures.2 A report on the
First Street, NE., Washington, DC 20426. weather conditions. For this reason, the
technical conference is due to the Commission will host the site visit
All comments must be filed by October Commission no later than November 2,
3, 2006, and should reference Project earlier in the process. The Commission
2006. encourages all interested parties to
No. 1971–079. Comments may be filed Attached to this notice, in Attachment
electronically via the Internet in lieu of participate in this site visit to ensure a
A, are questions to the Midwest ISO. productive scoping meeting in October
paper. The Commission strongly Responses to these questions should be
encourages electronic filings. See 18 2006.
filed no later than September 15, 2006.
CFR 385.2001(a)(1)(iii) and instructions The submitted information will be The site visit is open to the public and
on the Commission’s Web site at discussed at the technical conference resource agencies. Participants are
http://www.ferc.gov under the ‘‘e- and used to supplement the record. responsible for their own transportation,
Library’’ link. Attachment B lists topical areas that the but car pooling is encouraged as much
The Commission staff will consider Midwest ISO will be asked to address at as possible. Some roads in upper
comments made on the draft EIS in the technical conference. watershed locations are unpaved and
preparing a final EIS for the project. FERC conferences are accessible may be in poor condition—4-wheel
Before the Commission makes a under section 508 of the Rehabilitation drive is recommended, but not required.
licensing decision, it will take into Act of 1973. For accessibility Also, portions of the tour may require
account all concerns relevant to the accommodations please send an e-mail hiking steep trails in remote locations,
jlentini on PROD1PC65 with NOTICES

public interest. The final EIS will be to accessibility@ferc.gov or call toll free so please plan accordingly. Tour days
part of the record from which the may be long, so please bring food and
Commission will make its decision. 1 Midwest Indep. Transmission Sys. Operator, water. A tentative schedule is provided
For further information, contact Alan Inc., 116 FERC ¶ 61,124 (2006). below (times given are in Pacific
Mitchnick at (202) 502–6074, 2 Id. at 30. Daylight Savings):

VerDate Aug<31>2005 16:39 Aug 29, 2006 Jkt 208001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\30AUN1.SGM 30AUN1
51610 Federal Register / Vol. 71, No. 168 / Wednesday, August 30, 2006 / Notices

Tuesday, September 19, 2006 DEPARTMENT OF ENERGY Commission will grant such a request
6:45 a.m. Individuals arrive at PG&E’s only when it determines that fairness so
Service Center, located at 20818 Black Federal Energy Regulatory requires. Any person identified below as
Ranch Road, Burney, CA 96013 Commission having made a prohibited off-the-record
8 a.m. Meet at McCloud Reservoir [Docket No. RM98–1–000] communication shall serve the
USFS Tarantula Gulch Boat Ramp document on all parties listed on the
9 a.m. Ah-Di-Na Stream Gage (MC–1) Records Governing Off-the Record official service list for the applicable
10 a.m. Star City Communications; Public Notice proceeding in accordance with Rule
10:30 a.m. McCloud Dam (Top) 2010, 18 CFR 385.2010.
11 a.m. McCloud Dam (Bottom) August 22, 2006.
11:15 a.m. Stream GageMC–7 This constitutes notice, in accordance Exempt off-the-record
11:30 a.m. Hawkins Creek Pipe with 18 CFR 385.2201(b), of the receipt communications are included in the
Crossing of prohibited and exempt off-the-record decisional record of the proceeding,
12:30 a.m. Lunch at USFS Deadlum communications. unless the communication was with a
Campground Order No. 607 (64 FR 51222, cooperating agency as described by 40
1:30 p.m. Hawkins Landing September 22, 1999) requires CFR 1501.6, made under 18 CFR
Campground & Boat Ramp Commission decisional employees, who 385.2201(e)(1)(v).
2 p.m. Iron Canyon Overflow make or receive a prohibited or exempt
2:30 p.m. Iron Canyon Dam off-the-record communication relevant The following is a list of off-the-
3:30 p.m. Iron Canyon Pipe to the merits of a contested proceeding, record communications recently
4 p.m. James B. Black Surge Chamber to deliver to the Secretary of the received by the Secretary of the
4:30 p.m. James B. Black Penstock Commission, a copy of the Commission. The communications
Wednesday, September 20, 2006 communication, if written, or a listed are grouped by docket numbers in
summary of the substance of any oral ascending order. These filings are
6:45 a.m. Individuals arrive at PG&E’s
communication. available for review at the Commission
Service Center, located at 20818 Black
Prohibited communications are in the Public Reference Room or may be
Ranch Road, Burney, CA 96013 included in a public, non-decisional file
8 a.m. James B. Black Powerhouse viewed on the Commission’s Web site at
10 a.m. Pit 6 Dam associated with, but not a part of, the http://www.ferc.gov using the eLibrary
10:30 a.m. Pit 6 Powerhouse decisional record of the proceeding. link. Enter the docket number,
12 p.m. Lunch at Pit 7 Afterbay Dam Unless the Commission determines that excluding the last three digits, in the
2 p.m. Pit 7 Dam the prohibited communication and any docket number field to access the
2:30 p.m. Pit 7 Powerhouse responses thereto should become a part document. For assistance, please contact
3:30 p.m. Stream Gage PH–47 of the decisional record, the prohibited FERC, Online Support at
Please direct any questions regarding off-the-record communication will not
FERCOnlineSupport@ferc.gov or toll
the McCloud-Pit Hydroelectric Project be considered by the Commission in
reaching its decision. Parties to a free at (866) 208–3676, or for TTY,
licensing to Emily Carter, FERC Team contact (202) 502–8659.
Leader, at (202) 502–6512 or proceeding may seek the opportunity to
emily.carter@ferc.gov. respond to any facts or contentions
made in a prohibited off-the-record
Magalie R. Salas, communication, and may request that
Secretary. the Commission place the prohibited
[FR Doc. E6–14391 Filed 8–29–06; 8:45 am] communication and responses thereto
BILLING CODE 6717–01–P in the decisional record. The

Docket No. Date received Presenter or requester

Prohibited:
1. ER06–451–000 ................................................................ 8–17–06 Alan McQueen.
Exempt:
1. CP98–150–006 ................................................................ 8–21–06 Jennifer Kerrigan.
2. CP06–102–000 ................................................................ 8–21–06 Ken Dupuis.
3. Project No. 2030–000 ...................................................... 8–8–06 Hon. Bob Westlund.
4. Project No. 2111–018 ...................................................... 8–21–06 Ann-Ariel Vecchio.
5. TX06–2–000 .................................................................... 8–1–06 Hon. Jim Gibbons, Hon. Jeff Flake, Hon. Barbara Cubin, Hon.
C.L. ‘‘Butch’’ Otter, Hon. Michael K. Simpson.

Magalie R. Salas, ENVIRONMENTAL PROTECTION SUMMARY: This notice announces the


Secretary. AGENCY availability of EPA’s Interim
[FR Doc. E6–14385 Filed 8–29–06; 8:45 am] Reregistration Eligibility Decision
BILLING CODE 6717–01–P [EPA–HQ–OPP–2005–0162; FRL–8088–2] (IRED) for the N-methyl carbamate
pesticide carbofuran, and opens a public
Carbofuran; Interim Reregistration comment period on this document. The
Eligibility Decision; Notice of Agency’s risk assessments and other
Availability related documents also are available in
jlentini on PROD1PC65 with NOTICES

the carbofuran docket. Carbofuran


AGENCY: Environmental Protection works as a cholinesterase inhibitor and
Agency (EPA).
is used to treat pests of food and non-
ACTION: Notice. food crops as either a flowable or

VerDate Aug<31>2005 16:39 Aug 29, 2006 Jkt 208001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\30AUN1.SGM 30AUN1

S-ar putea să vă placă și