Sunteți pe pagina 1din 2

50410 Federal Register / Vol. 71, No.

165 / Friday, August 25, 2006 / Notices

Western will continue to provide ENVIRONMENTAL PROTECTION Investment Plan would influence the
annual rates to the BCP Contractors by AGENCY ecological future of the Ohio River
October 1 of each year using the same System, and requested additional
[ER–FRL–6678–6]
ratesetting formula. The rates are information regarding adaptive
reviewed annually and adjusted upward Environmental Impact Statements and management, institutional
or downward to assure sufficient Regulations; Availability of EPA arrangements, environmental justice,
revenues exist to achieve payment of all Comments cumulative impact analysis, mitigation,
costs and financial obligations and water quality. Rating EC2.
associated with the project. Each fiscal Availability of EPA comments EIS No. 20060238, ERP No. D–NRS–
year, Western prepares a PRS to update prepared pursuant to the Environmental H34031–00, West Tarkio Creek
Review Process (ERP), under section Watershed Plan, Construction of a
actual revenues and expenses and
309 of the Clean Air Act and Section Multiple-Purpose Structure for Rural
include future estimates of annual
102(2)(c) of the National Environmental Water Supply, Recreational
revenues and expenses for the BCP, Policy Act as amended. Requests for Opportunities and Agricultural
including interest and capitalized costs. copies of EPA comments can be directed Pollution Control, Page, Montgomery
Western’s BCP electric service to the Office of Federal Activities at and Fremont Counties, IA and
ratesetting formula set forth in Rate 202–564–7167. An explanation of the Atchison County, MO.
Order No. WAPA–70 was approved on ratings assigned to draft environmental Summary: EPA does not object to the
April 19, 1996, in Docket No. EF96– impact statements (EISs) was published proposed project, but recommended that
5091–000 at 75 FERC ¶ 62,050, for the in FR dated April 7, 2006 (71 FR 17845). the Final EIS provide additional
period beginning November 1, 1995, Draft EISs clarification on several issues, including
and ending September 30, 2000. Rate the range of reasonable alternatives and
Order No. WAPA–94, extending the EIS No. 20060069, ERP No. D–FHW– cumulative impacts. Rating LO.
existing ratesetting formula beginning K40260–CA, Interstate 5/Cosumnes EIS No. 20060266, ERP No. D–FTA–
on October 1, 2000, and ending River Boulevard Interchange Project, G40190–TX, North Corridor Fixed
September 30, 2005, was approved on Extension of Cosumnes River Guideway Project, Propose Transit
Boulevard from Franklin Boulevard to Improvements from University of
July 31, 2001, in Docket No. EF00–
Freeport Boulevard with an Houston (UH)-Downtown Station to
5092–000 at 96 FERC ¶ 61,171. Rate
Interchange at Interstate 5, South of Northline Mall, Harris County, TX.
Order No. WAPA–120, extending the
the Pocket/Meadowview Road Summary: EPA does not object to the
existing ratesetting formula for another Interchange and North of the Laguna
five-year period beginning on October 1, proposed action. Rating LO.
Boulevard Interchange, City of
2005, and ending September 30, 2010, EIS No. 20060007, ERP No. DS–COE–
Sacramento, Sacramento County, CA.
was approved on June 22, 2006, in B32009–MA, Boston Harbor Inner
Summary: EPA does not object to the Harbor Maintenance Dredging Project,
Docket No. EF05–5091–000 at 115 FERC proposed project. Rating LO.
¶ 61,362. The BCP ratesetting formula Updated Information, Boston Harbor,
includes a base charge, an energy rate, EIS No. 20060162, ERP No. D–FHW– Mystic River and Chelsea River, MA.
G40189–00, TIER 1—DEIS Trans- Summary: EPA requested additional
and a capacity rate. The ratesetting
Texas Corridor—35 (TTC–35) System, information concerning impacts to
formula was used to determine the BCP
Improvement to International, winter flounder spawning and
FY 2007 Base Charge and Rates. Interstate and Intrastate Movement of anadromous fish migration and
Western proposes the FY 2007 base Goods and People, Oklahoma-Mexico/ measures that could be taken to avoid
charge of $67,509,136, the energy rate of Gulf Coast Element. those impacts. EPA also made
8.51 mills/kWh, and the capacity rate of Summary: EPA expressed suggestions concerning water quality
$1.63/kWmonth be approved on a final environmental concerns about air monitoring during project
basis. quality and water quality impacts. implementation and offered to
Consistent with procedures set forth Rating EC2. participate in a workgroup to develop
in 10 CFR part 903 and 18 CFR part 300, EIS No. 20060192, ERP No. D–AFS– an appropriately scaled sampling effort.
Western held a consultation and L65511–ID, Myrtle Creek Healthy Rating EC2.
comment period. The notice of the Forest Restoration Act Project, Final EISs
proposed FY 2007 Rates for electric Proposes Aquatic and Vegetation
EIS No. 20060226, ERP No. F–FHW–
service was published in the Federal Improvement Treatments, Panhandle
K40249–CA, Lincoln Bypass
Register on March 2, 2006 (71 FR National Forests, Bonners Ferry
Construction, South of Industrial
10664). Ranger District, City of Bonners Ferry,
Boulevard to North of Riosa Road,
Boundary County, ID.
Under Delegation Order Nos. 00– Funding and US Army COE Section
037.00 and 00–001.00B, and in Summary: EPA does not object to 404 Permit, Issuance, Placer County,
compliance with 10 CFR part 903 and proposed action. Rating LO. CA.
18 CFR part 300, I hereby approve the EIS No. 20060200, ERP No. D–COE– Summary: EPA continues to have
FY 2007 Rates for BCP Electric Service F39140–00, PROGRAMMATIC—Ohio environmental concerns about the
on a final basis under Rate Schedule River Mainstem System Study, proposed project because of potential
BCP–F7, through September 30, 2007. System Investment Plan (SIP) for impacts to aquatic resources,
Maintaining Safe, Environmentally recommends that FHWA clarify the full
cprice-sewell on PROD1PC66 with NOTICES

Dated: August 10, 2006. Sustainable and Reliable Navigation extent.


Clay Sell, on the Ohio River, IL, IN, OH, KY, PA EIS No. 20060244, ERP No. F–IBR–
Deputy Secretary. and WV. K65285–CA, San Luis Drainage
[FR Doc. E6–14181 Filed 8–24–06; 8:45 am] Summary: EPA expressed Feature Re-evaluation Project, Provide
BILLING CODE 6450–01–P environmental concerns about how Agricultural Drainage Service to the
implementation of the System San Luis Unit, Several Counties, CA.

VerDate Aug<31>2005 14:57 Aug 24, 2006 Jkt 208001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\25AUN1.SGM 25AUN1
Federal Register / Vol. 71, No. 165 / Friday, August 25, 2006 / Notices 50411

Summary: EPA was supportive of the Weekly receipt of Environmental Impact parishes in eastern Texas and
selection of the Drainage Impaired Land Statements northern Louisiana, Wait Period Ends:
Retirement Alternative, but expressed Filed 08/14/2006 Through 08/17/2006 09/25/2006, Contact: Todd Selmak 1–
environmental concerns about treatment Pursuant to 40 CFR 1506.9. 866–208–3372.
methods to remove selenium from EIS No. 20060344, Final EIS, AFS, AZ, Dated: August 22, 2006.
drainage water and potential impacts to Deep Lake Allotment Project, Ken Mittelholtz,
air quality. EPA requested additional Proposes to Re-authorize Grazing, Environmental Protection Specialist, Office
analysis and monitoring commitments Mormon Lake Ranger District, of Federal Activities.
prior to implementation of any Coconino National District, Coconino [FR Doc. E6–14145 Filed 8–24–06; 8:45 am]
alternative and expressed continued County, AZ , Wait Period Ends: 09/ BILLING CODE 6560–50–P
objections if an out of valley alternative. 25/2006, Contact: Katherine Sanchez
EIS No. 20060259, ERP No. F–BLM– Meador 928–526–0866.
J02042–UT, Uinta Basin Natural Gas EIS No. 20060345, Draft EIS, AFS, WA, ENVIRONMENTAL PROTECTION
Project, Proposal to Produce and Buckhorn Access Project, To Utilize AGENCY
Transport Natural Gas in the Atchee the Marias Creek Route to Construct
Wash Oil and Gas Production Region, and Reconstruct Roads, Funding, [FRL–8213–2]
Resource Development Group, Right- NPDES Permit and U.S. Army COE
of-Way Grant, U.S. COE Section 404 Section 404 Permit, Okanogan and EPA Science Advisory Board;
Permit and Endangered Species Act Wenatchee National Forests, Tonasket Notification of a Public Telephone
Permit, Uintah County, UT. Ranger District, Okanogan County, Conference of the Science Advisory
Summary: No formal comment letter WA, Comment Period Ends: 10/10/ Board
was sent to the preparing agency. 2006, Contact: Jan Flatten 509–826–
AGENCY: Environmental Protection
EIS No. 20060263, ERP No. F–BIA– 3277.
Agency.
F65058–MI, Nottawaseppi Huron EIS No. 20060346, Final EIS, SFW, CA,
San Diego Bay National Wildlife ACTION: Notice.
Band of Potawatomi Indians (the
Tribe), Proposes Fee-to-Trust Transfer Refuge Comprehensive Conservation SUMMARY: The Environmental Protection
and Casino Project, Calhoun County, Plan, Implementation, Sweetwater Agency (EPA) Science Advisory Board
MI. Marsh and South San Diego Bay (SAB) Staff Office announces a public
Units, San Diego County, CA, Wait telephone conference of the Chartered
Summary: EPA’s previous concerns Period Ends: 09/25/2006, Contact:
have been resolved; therefore, EPA does Board to review three draft SAB Panel
Victoria Touchstone 760–431–9440 Reports.
not object to the proposed action. Ext. 349.
EIS No. 20060332, ERP No. FC–NOA– DATES: The SAB will meet via telephone
EIS No. 20060347, Draft EIS, BLM, ID,
E86002–00, Amendment 26 to the Cottonwood Resource Management conference on September 21, 2006, and
Gulf of Mexico Reef Fish Fishery Plan, Implementation, Latah, if necessary continue on September 22,
Management Plan, Proposed Clearwater, Nez Perce, Lewis, Idaho 2006, to review three SAB draft reports:
Individual Fishing Quota (IFQ) and Adams Counties, ID, Comment (1) Review of 2005 Agency Draft entitled
Program to Reduce Overcapacity in Period Ends: 11/22/2006, Contact: Expansion and Upgrade of the RadNet
the Commercial Red Snapper Fishery. Chuck Dillon 208–962–3686. Air Monitoring Network, Vol. 1&2,
Summary: EPA does not object to the EIS No. 20060348, Draft EIS, NPS, MN, Concept and Plan; (2) SAB Advisory on
proposed action. Disposition of Bureau of Mines EPA’s Second Generation Model; and
Property, Twin Cities Research Center (3) Peer Review of the ‘‘All-Ages Lead
EIS No. 20060228, ERP No. FS–COE– Model (AALM) Version 1.05. The
B32009–MA, Boston Harbor Inner Main Campus, Implementation,
Hennepin County, MN, Comment meeting will begin at 1 p.m. and end at
Harbor Maintenance Dredging Project, 4 p.m. (Eastern Time) on September 21,
Updated Information, Boston Harbor, Period Ends: 10/09/2006, Contact:
Kim M. Berns 651–290–3030 Ext. 244. 2006. If additional time is needed to
Mystic River and Chelsea River, MA. complete any of these reviews, the
Summary: EPA does not object to the EIS No. 20060349, Draft EIS, DOE, FL,
Orlando Gasification Project (DOE/ meeting will be reconvened at 1 p.m.
proposed project. (Eastern Time), Friday, September 22,
EIS–0383) To Provide Cost-Shared
Dated: August 22, 2006. Funding for Construction and 2006.
Robert W. Hargrove, Operation of Facilities at Orlando Location: Telephone conference call
Director, NEPA Compliance Division, Office Utilities Commission’s Station Energy only.
of Federal Activities. Center near Orlando, FL, Comment FOR FURTHER INFORMATION CONTACT: Any
[FR Doc. E6–14150 Filed 8–24–06; 8:45 am] Period Ends: 10/10/2006, Contact: member of the public wishing to obtain
BILLING CODE 6560–50–P Richard A. Hargis 412–386–6065. general information concerning this
EIS No. 20060350, Final EIS, BLM, AK, telephone conference should contact
Ring of Fire Resource Management Mr. Thomas Miller, Designated Federal
ENVIRONMENTAL PROTECTION Plan, Implementation, Alaska Officer (DFO), EPA Science Advisory
AGENCY Peninsula, Kodiak Island and Board (1400F), U.S. Environmental
Aleutian Islands, AK, Wait Period Protection Agency, 1200 Pennsylvania
[ER–FRL–6678–5] Ends: 09/25/2006, Contact: Robert Avenue, NW., Washington, DC 20460;
Lloyd 907–267–1246. via telephone/voice mail: (202) 343–
cprice-sewell on PROD1PC66 with NOTICES

Environmental Impacts Statements;


Notice of Availability EIS No. 20060351, Final EIS, FRC, 00, 9982; fax: (202) 233–0643; or e-mail at:
Carthage to Perryville Project, miller.tom@epa.gov. General
Responsible Agency: Office of Federal Construction and Operation of a information concerning the EPA Science
Activities, General Information (202) Natural Gas Pipeline Facilities, Advisory Board can be found on the
564–7167 or http://www.epa.gov/ CenterPoint Energy Gas Transmission, EPA Web Site at: http://www.epa.gov/
compliance/nepa/. Located in various counties and sab.

VerDate Aug<31>2005 14:57 Aug 24, 2006 Jkt 208001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\25AUN1.SGM 25AUN1

S-ar putea să vă placă și