Sunteți pe pagina 1din 2

43730 Federal Register / Vol. 71, No.

148 / Wednesday, August 2, 2006 / Notices

intervene in accordance with the d. Applicant: Public Utility District so indicate by writing to the Secretary
Commission’s Rules may become a No. 1 of Snohomish County, of the Commission.
party to the proceeding. Any comments, Washington. n. Competing Preliminary Permit—
protests, or motions to intervene must e. Name of Project: Guemes Channel Anyone desiring to file a competing
be received on or before the specified Tidal Energy Project. application for preliminary permit for a
comment date for the particular f. Location: The project would be proposed project must submit the
application. located in a section of Guemes Channel competing application itself, or a notice
Comments, protests and interventions between Guemes Island and Fidalgo of intent to file such an application, to
may be filed electronically via the Island in Skagit County, Washington. the Commission on or before the
Internet in lieu of paper; See 18 CFR g. Filed Pursuant to: Federal Power specified comment date for the
385.2001 (a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)–825(r). particular application (see 18 CFR 4.36).
on the Commission’s Web site under ‘‘e- h. Applicant Contacts: Mr. Steven Submission of a timely notice of intent
filing’’ link. The Commission strongly Klein, General Manager, P.O. Box 1107, allows an interested person to file the
encourages electronic filing. 2320 California Street, Everett, WA competing preliminary permit
p. Filing and Service of Responsive 98206, (425) 783–8473. application no later than 30 days after
Documents: Any filings must bear in all i. FERC Contact: Chris Yeakel, (202) the specified comment date for the
capital letters the title ‘‘COMMENTS’’, 502–8132. particular application. A competing
‘‘RECOMMENDATIONS FOR TERMS j. Deadline for filing comments, preliminary permit application must
AND CONDITIONS’’, ‘‘PROTEST’’, OR protests, and motions to intervene: 60 conform with 18 CFR 4.30(b) and 4.36.
‘‘MOTION TO INTERVENE’’, as o. Competing Development
days from the issuance date of this
applicable, and the Project Number of Application—Any qualified
notice.
the particular application to which the development applicant desiring to file a
The Commission’s Rules of Practice
filing refers. Any of the above-named competing development application
and Procedure require all intervenors
must submit to the Commission, on or
documents must be filed by providing filing documents with the Commission
before a specified comment date for the
the original and the number of copies to serve a copy of that document on
particular application, either a
provided by the Commission’s each person in the official service list
competing development application or a
regulations to: The Secretary, Federal for the project. Further, if an intervenor notice of intent to file such an
Energy Regulatory Commission, 888 files comments or documents with the application. Submission of a timely
First Street, NE., Washington, DC 20426. Commission relating to the merits of an notice of intent to file a development
A copy of any motion to intervene must issue that may affect the responsibilities application allows an interested person
also be served upon each representative of a particular resource agency, they to file the competing application no
of the Applicant specified in the must also serve a copy of the document later than 120 days after the specified
particular application. on that resource agency. comment date for the particular
q. Agency Comments: Federal, state, k. Description of Project: The application. A competing license
and local agencies are invited to file proposed project would consist of: (1) application must conform with 18 CFR
comments on the described application. 166 Tidal In Stream Energy Conversion 4.30(b) and 4.36.
A copy of the application may be (TISEC) devices consisting of, (2) p. Notice of Intent—A notice of intent
obtained by agencies directly from the rotating propeller blades 10 meters in must specify the exact name, business
Applicant. If an agency does not file diameter, (3) integrated generators with address, and telephone number of the
comments within the time specified for a capacity of 66 kW, (4) anchoring prospective applicant, and must include
filing comments, it will be presumed to systems, (5) mooring lines, and (6) an unequivocal statement of intent to
have no comments. One copy of an interconnection transmission lines. The submit, if such an application may be
agency’s comments must also be sent to project is estimated to have an annual filed, either a preliminary permit
the Applicant’s representatives. generation of 28.5 gigawatt-hours per- application or a development
year, which would be distributed by the application (specify which type of
Magalie R. Salas,
Snohomish County Public Utility application). A notice of intent must be
Secretary.
District. served on the applicant(s) named in this
[FR Doc. E6–12385 Filed 8–1–06; 8:45 am] l. Locations of Applications: A copy of public notice.
BILLING CODE 6717–01–P the application is available for q. Proposed Scope of Studies Under
inspection and reproduction at the Permit—A preliminary permit, if issued,
Commission in the Public Reference does not authorize construction. The
DEPARTMENT OF ENERGY Room, located at 888 First Street, NE, term of the proposed preliminary permit
Federal Energy Regulatory Room 2A, Washington DC 20426, or by would be 36 months. The work
Commission calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis,
Notice of Application Accepted for Web site at http://www.ferc.gov using preparation of preliminary engineering
Filing and Soliciting Motions To the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
Intervene, Protests, and Comments number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the studies, the Applicant would decide
July 25, 2006. document. For assistance, call toll-free whether to proceed with the preparation
Take notice that the following 1–866–208–3676 or e-mail of a development application to
hydroelectric application has been filed FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
with the Commission and is available call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to
wwhite on PROD1PC61 with NOTICES

for public inspection: available for inspection and Intervene—Anyone may submit
a. Type of Application: Preliminary reproduction at the address in item h comments, a protest, or a motion to
Permit. above. intervene in accordance with the
b. Project No.: 12698–000. m. Individuals desiring to be included requirements of Rules of Practice and
c. Date filed: June 15, 2006. on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.

VerDate Aug<31>2005 16:40 Aug 01, 2006 Jkt 208001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\02AUN1.SGM 02AUN1
Federal Register / Vol. 71, No. 148 / Wednesday, August 2, 2006 / Notices 43731

In determining the appropriate action to with the Commission and is available reproduction at the address in item h
take, the Commission will consider all for public inspection: above.
protests or other comments filed, but a. Type of Application: Preliminary m. Individuals desiring to be included
only those who file a motion to Permit. on the Commission’s mailing list should
intervene in accordance with the b. Project No.: 12704–000. so indicate by writing to the Secretary
Commission’s Rules may become a c. Date filed: June 28, 2006. of the Commission.
party to the proceeding. Any comments, d. Applicant: Tidewalker Associates. n. Competing Preliminary Permit:
protests, or motions to intervene must e. Name of Project: Half-Moon Cove Anyone desiring to file a competing
be received on or before the specified Tidal Power Project. application for preliminary permit for a
comment date for the particular f. Location: The project would be proposed project must submit the
application. located in Half-Moon Cove in the competing application itself, or a notice
Comments, protests and interventions Cobscook Bay in Washington County, of intent to file such an application, to
may be filed electronically via the Maine. the Commission on or before the
Internet in lieu of paper; See 18 C.F.R. g. Filed Pursuant to: Federal Power specified comment date for the
385.2001 (a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)–825(r). particular application (see 18 CFR 4.36).
on the Commission’s Web site under ‘‘e- h. Applicant Contacts: Dr. Normand Submission of a timely notice of intent
filing’’ link. The Commission strongly allows an interested person to file the
Laberge, P.E., 46 Place Cove Road,
encourages electronic filing. competing preliminary permit
Trescott, Maine 04652, phone (207)
application no later than 30 days after
s. Filing and Service of Responsive 733–5513.
the specified comment date for the
Documents—Any filings must bear in i. FERC Contact: Chris Yeakel, (202)
particular application. A competing
all capital letters the title 502–8132.
preliminary permit application must
‘‘COMMENTS’’, j. Deadline for filing comments,
conform with 18 CFR 4.30(b) and 4.36.
‘‘RECOMMENDATIONS FOR TERMS protests, and motions to intervene: 60 o. Competing Development
AND CONDITIONS’’, ‘‘PROTEST’’, days from the issuance date of this Application: Any qualified development
‘‘COMPETING APPLICATION’’ or notice. applicant desiring to file a competing
‘‘MOTION TO INTERVENE’’, as The Commission’s Rules of Practice development application must submit to
applicable, and the Project Number of and Procedure require all intervenors the Commission, on or before a
the particular application to which the filing documents with the Commission specified comment date for the
filing refers. Any of the above-named to serve a copy of that document on particular application, either a
documents must be filed by providing each person in the official service list competing development application or a
the original and the number of copies for the project. Further, if an intervenor notice of intent to file such an
provided by the Commission’s files comments or documents with the application. Submission of a timely
regulations to: The Secretary, Federal Commission relating to the merits of an notice of intent to file a development
Energy Regulatory Commission, 888 issue that may affect the responsibilities application allows an interested person
First Street, NE., Washington, DC 20426. of a particular resource agency, they to file the competing application no
A copy of any motion to intervene must must also serve a copy of the document later than 120 days after the specified
also be served upon each representative on that resource agency. comment date for the particular
of the Applicant specified in the k. Description of Project: The application. A competing license
particular application. proposed project would consist of: (1) A application must conform with 18 CFR
t. Agency Comments—Federal, state, rock-fill dam with a clay core 4.30(b) and 4.36.
and local agencies are invited to file approximately 1210 feet-long with a p. Notice of Intent: A notice of intent
comments on the described application. crest elevation of approximately 27 feet must specify the exact name, business
A copy of the application may be above mean-sea-level, (2) three bulb- address, and telephone number of the
obtained by agencies directly from the type turbines with a capacity of 4.5 MW prospective applicant, and must include
Applicant. If an agency does not file each, (3) a concrete powerhouse located an unequivocal statement of intent to
comments within the time specified for in the center of the dam, (4) submit, if such an application may be
filing comments, it will be presumed to interconnection transmission lines, and filed, either a preliminary permit
have no comments. One copy of an (5) appurtenant equipment. The project application or a development
agency’s comments must also be sent to is estimated to have a total generation application (specify which type of
the Applicant’s representatives. capacity of 13.5 megawatts, which application). A notice of intent must be
would be distributed by a local utility. served on the applicant(s) named in this
Magalie R. Salas,
l. Locations of Applications: A copy of public notice.
Secretary. the application is available for q. Proposed Scope of Studies under
[FR Doc. E6–12386 Filed 8–1–06; 8:45 am] inspection and reproduction at the Permit: A preliminary permit, if issued,
BILLING CODE 6717–01–P Commission in the Public Reference does not authorize construction. The
Room, located at 888 First Street, NE, term of the proposed preliminary permit
Room 2A, Washington DC 20426, or by would be 36 months. The work
DEPARTMENT OF ENERGY calling (202) 502–8371. This filing may proposed under the preliminary permit
Federal Energy Regulatory also be viewed on the Commission’s would include economic analysis,
Commission Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
Notice of Application Accepted for number excluding the last three digits in impacts. Based on the results of these
Filing and Soliciting Motions To the docket number field to access the studies, the Applicant would decide
wwhite on PROD1PC61 with NOTICES

Intervene, Protests, and Comments document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to
July 25, 2006. FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
Take notice that the following call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to
hydroelectric application has been filed available for inspection and Intervene: Anyone may submit

VerDate Aug<31>2005 16:40 Aug 01, 2006 Jkt 208001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\02AUN1.SGM 02AUN1

S-ar putea să vă placă și