Sunteți pe pagina 1din 8

Bambang SUDJARWO

Copyright SPIE OGS. This document is the exclusive property of SPIE OGS. It can not be communicated without the express and written authorization of SPIE OGS.

FLUIDS & CEMENT SUPERVISOR


31 years of experience
EDUCATION AND TRAINING

1979 1987
Geology.
1975 1977
1972 1974
1967 1972

Bachelor degree at Engineering Faculty of Gadjah Mada University Yogyakarta, Majoring in


Senior High School at SMAN I-II Semarang.
Junior High School at SMP Pius Bersubsidi Tegal.
Elementary School at SD Pius Bersubsidi Tegal.

TRAINING

2013 DUYONG DEEP-1 ULTRA HPHT WORK SHOP (DWOP/Well Control/MPD) PETRONAS
CARIGALI in House Training, January 29th-31st 2013, Pullman Lakeside Hotel Putra Jaya Kuala Lumpur
Malaysia.
o MIS-BOSET TRAINING - SEQU OFFSHORE SAFETY (Sea Survival Theory and Practical, HUET
with using EBS or Emergency Breathing System Theory and Practical, Basic Offshore Safety,
Basic Fire Fighting and evacuation Technique Theory and Practical) January 25-27th 2013,
Certificated (January 27,2013 up to January 26, 2017), SEQU OFFSHORE SAFETY SDN BHD
Jln Jenjarum Damansara Kuala Lumpur Malaysia.
o Boots and Coots Well Control Training Course (Offshore, May 2013) for HPHT well concerning with
Exploration of Duyong Deep-1 Ultra HPHT Well.

2012 In house Mandatory Total Indonesie Training Course with topic: Basic Fire Fighting, Risk Awareness
and Prevention, Gesture & Posture, Basic First Aid, on April 2012 at SENIPAH, and Respect for Environment
in Operation on May 2012 at Blue Sky Hotel Balikpapan.

2011 Halliburton Cementing Course, in house training by Total Indonesie Balikpapan Indonesia, on
August 2011 at Blue Sky Hotel Balikpapan.

2010 Brandt SOLID CONTROL course, in house training by Total Indonesie Balikpapan Indonesia, on
December 01-03, 2010 at Blue Sky Hotel Balikpapan.

2010 Well Control for SURFACE & SUBSEA level D SUPERVISOR certificated (August 06, 2010 August
06, 2012), Basic Offshore Safety Induction and Emergency Training (B.O.S.I.E.T) certificated (October 2010
October 2013).

2010 HTHP, implement of MPD and EKD system for Offshore Exploration well TREKULU-1 training and
work shop, in house training by Total Indonesie Balikpapan Indonesia, on March 10 & 11, 2010.

2008 Geo Graphix PRIZM, Landmark Halliburton Jakarta Indonesia, Courses about Petrophysical data
management, analysis and interpretation with use PRIZM Software (August 2008).

2007 SCHLUMBERGER SANAA REPUBLIC of YEMEN MIDDLE EAST, Short Courses, Introduction and
application of Schlumberger Logging Tools (included new tools) will be used in Exploration HTHP well
(November 2007).

2004 EXSPAN HTHP Work shop for well Banteng-1, Jakarta.

2003 Integrated Fluids Technology - II Course, Baroid Halliburton, Kuala Lumpur.

Bambang SUDJARWO

2003 DFG with Drill A head Hydraulics Course, Baroid Halliburton Indonesia, Jakarta.

2003 CALTEX WELL CONTROL course for exploration and infill drilling at overpressure and High
Temperature field.

2002 English for Professionals Program, in house training Baroid Halliburton Indonesia, Jakarta

2001 WELLSIGHT 2000 and DFG-Win Training, Baroid Drilling Fluids Co. Jakarta.

1998 System Tract and Team Building Oil & Gas Industry Course, IWPL Dit.Jend. Migas, Yogyakarta.

1993 Total Quality Management, M-I Drilling Fluid Co, Jakarta.

1992 Environment & Drilling Fluids Toxicity Training, M-I Drilling Fluids Co, Jakarta.

1991 Advanced Mud Technology Seminar, M-I Drilling Fluids Co. Jakarta.

1990 Basic Drilling Fluids School, PT.Dresser Magcobar Indonesia, Jakarta.

LANGUAGES

Indonesian : native
English : fluent

WORK EXPERIENCES

07/14 09/14

SALAMANDER ENERGY (INDONESIA) LTD / FLUIDS SPECIALIST

Location : Indonesia
Tasks :
Drilling Fluids and Cement
In order to support operation during drilling NK 2 Deep Water Exploration Well on Sangata Block East
Kalimantan Indonesia (Short Term Contract).

01/14 02/14

BAKER HUGHES (MALAYSIA) INC / SENIOR DRILLING FLUIDS ENGINEER

Location : Malaysia
Tasks :

Sepat Deep-2 HPHT Well, Paninsular West Malaysia at very critical well section (Short Term Contract).

Bambang SUDJARWO

01/13 11/13

PETRONAS / HPHT FLUIDS AND CEMENT SUPERVISOR

Location : Malaysia
Tasks :

Field Operation Supervisor especially for Fluids and Cement in order to support operation during drilling
Duyong Deep-1 Ultra HPHT Exploration Well on time (BHST = 450 deg F, MW maximum 19.1 ppg, Depth
4,388mTVD).

With consideration of bore-hole design/configuration, maintained Fluids properties to control ECD while
drilling due to narrow margin between Formation Pressure and MW applied to achieve section depth as
proposed, also maintain down hole High-Temp Properties to avoid sagging effect, Monitor Loss/Gain due to
Temperature effect of Fluids and tight monitoring volume refer to Finger Print data (mean with 1 bbl SBM
gain equivalent with 600 up to 900 bbl times gas kick on surface), Performed and Applied Cementing Job
using MPD due to Narrow Formation Fracture Margin related with pumping cement rate strategy and surge
effect during RIH Casing / Liner throught small clearance.

The offshore fluids supervisor will work closely with the Petronas Carigali Drilling Supervisors and Petronas
Carigali shore based Superintendent and Fluids Engineers.
The fluids supervisor will be responsible to understand the Fluids programme provided by the service
company and agreed by Petronas. Identify potential problems and recommend operational solutions to
maintain and/or improve the quality of service companies which covers all background engineering required
for the generic program, covering areas of experience:

o
o
o
o
o
o
o
o
o
o
o
o
o
o

Well bore stability


Hydraulics and swab/surge calculations
ECD management
Displacements and well bore & surface clean out.
Rig equipment constraints
Commercial balance (cost benefit analysis)
Cementing interface
Considerations and environmental controls
Hole cleaning
Trip procedures
Lost circulation procedures for prevention and control
Differentially stuck pipe-freeing procedures
Drilling fluid weight window design
Well control methods

Responsible for work and guidance of the service company personnel to verify hydraulics modeling.
Ensure compliance to all QA/QC procedures as requested, including fluids materials and liquid sample,
cementing, performance management and waste management programs.
Undertake drilling fluids field testing to API 13 B1 and B2 to verify service company measurements and
calculations
Account for fluids volume taking into account pressure-volume-temperature relationships
Promote Petronas and safety programme and Zeto Rules and actively follow up on action plans and Review
and make sure well site recaps are done in a prompt, timely manner.
Attends morning meetings on the rig, review all daily reports, make recommendations as required and
ensure adherence to the program, trouble shoot problems at the well site.

Bambang SUDJARWO

Ensure all fluids testing related equipment at the rig-site are in accordance with contract
Be responsible for Inventory management including forecasting, orders of sack, drum and bulk materials.
Collect data and observations required for adjustment of the final cementing programme
Validate by measurement and calculation the volume and density of all cement slurry and cement spacer
volumes pumped during the cementing process.
Validate all rig site slurry measurements (e.g. rheology, density, API Fluid loss) stated in the cementing
programme
Confirm post cementing job actual cement and additives concentrations correlate with programmed
concentrations
Ensure material batch/lot numbers of additive used in the cementing job recorded on the job ticket/report
Validate fluids measurements and characteristics during mud conditioning circulations prior to casing running
and cementing operations
Review post job pressure behavior and density records for comparison with predicted values
Supervision of mud engineers, cementers, solids control & waste management engineers and the hydraulics
specialist at the well site and maintenance of standards of work.
Responsibility for follow up actions on all services fluids related, including waste management and
cementing. He is accountable for demanding closing actions from service company requirements at the well
site.
Responsible for the training of rig crew and mud engineers on the concept of standard temperature for
surface mud weight measurement for the HPHT section and to ensure the concept is correctly applied.
Any changes in the implementation of the mud program have to be reported to the senior fluids engineer
onshore for appropriate action.
Participation in rig site audits, investigations, data gathering and procedural witness testing

01/09 12/12

TOTAL E&P / FLUIDS AND CEMENT SUPERVISOR

Location : Indonesia - Balikpapan - Eas Kalimantan


1. HTHP Project Rig (Raissa and Maera --- Swamp Barge rig, and Soehanah Jack Up Rig - Offshore HTHP
Exploration Project using MPD and EKD system), and also Blind Drilling System (estimated length of Total Loss
Circulation 1000 - 1200 m ...at Hakuryu-10 Jack Up Rig) using mud cup or RCD system. Mostly drilling operation
in Total Indonesie are Deviated wells sometimes Horizontal well in Batch and Splitter Well Drilling System .
Sometimes assignment to do as Temporary Offshore Fluids and Cement Superintendent at Total E&P
Balikpapan Office to handle Offshore rig operation.
Tasks :
Directs the work of the contractors fluids & cement engineers on board the assigned rig(s)/ barge(s)
ensuring that the operations are conducted as programmed & in line with good engineering practices.
Ensures that all operations are conducted safely & efficiently (Follows up day to day drilling operations and
ensures that mud & cement operations are conducted safely and as programmed, Follows up fluids &
cement costs and strives to optimize them)
Prepares & supervises the cementing jobs (Troubleshoot the operations and recommends corrective
actions).
Organizes the supply of mud & cement products/ equipment in a timely manner.
Adjusts Solid Control Equipment to efficiently remove drilled solids (Monitors the performance of the solid
control equipment and optimizes this equipment to maximize solids removal and minimize oil retention on
cuttings).
Check daily mud reports and issues additional fluids reports (phases, end of well, SCE, T form, etc).
Prepares the cementing report after each job.

Bambang SUDJARWO

Ensures that the waste management program is fully implemented, focusing especially on minimizing
(offshore)/ preventing (swamp) oil disposal to the sea, minimizing impact on environment and local
communities.
Reports to Fluids Superintendent and proposes ways of improving the Fluids & Cement Operations.

10/07 01/09

GALLO OIL (JERSEY) LTD


EXPLORATION GEOLOGIST AND DRILLING ENGINEER

Location : Yemen - Middle East


Tasks :
Appraisal work on leads and prospect in the Well Dawan South-1, Well Tasilah West-1 (Block R-2) Sayun - Masilah
Basin, and Well Al- Rizq 1, (Block 13) Jiza - Qamar Basin, Exploration Well, Republic of YEMEN (Middle East).
On Masilah Basin, applied Under Balance Drilling due to exploration well will drill through very low formation
pressure and thick layers of limestone where is potential with total losses.
Evaluations have to integrate various geological / geophysical data in regional, play with fairway mapping, seismic
interpretation, and log interpretation. Depend on availability data and attractiveness, leads are further matured into
prospect by determining potential hydrocarbon reserves/resources, also assessing appropriate key risk elements.
Play with petroleum system, prepare drilling proposal and final report. Well drilling exploration monitoring such as:

Supervises the mud logging unit


Responsible for sample description, interpretation, lithology and formation correlation
Manages the core catching and description procedure
Oversees wire line logging program
Responsible for geological reports
Ensures DST sample collection
Monitoring and Suggestion to optimize drilling parameter section by section hole will be drilled, Drilling
hazard for each section and how to solve that problem related with Formation system observed (including
Drilling Fluids system to avoid Formation damage) with goal minimized operational cost.

04/07 09/07

MI SWACO / PROJECT ENGINEER

Location : Indonesia
Tasks :
Star Energy Ltd (HTHP and Deep Offshore Well Project), Kangean Energy Ltd (Offshore and On Shore
Horizontal wells project).

01/06 03/07

GALLO OIL (JERSEY) LTD / GEOLOGIST AND DRILLING ENGINEER

Location : Yemen (Middle East)


Appraisal work on leads and prospect in the Well Tasilah-1, and Well Al Murad-1 in Block R-2 Sayun Masilah Basin, Exploration Well, Republic of YEMEN (Middle East).

Bambang SUDJARWO

Evaluations to have integrated various of geological and geophysical data regionallly, play with fairway
mapping, seismic interpretation, log interpretation, and availability to determine potential hydrocarbon
reserves/resources also assessing appropriate key risk elements.
Based on Petroleum system, prepare proposal of Drilling program, Drilling Fluids program which are
compatible to formation system specially for very low formation pressure related with estimated reservoir
above sea level and very sticky clay/shale formation, and finalized the well report (Drilling & Geological
Report).
Monitoring and Suggestion to optimize drilling parameter section by section hole will be drilled, Drilling
hazard for each section and how to solve that problem related with Formation system observed (including
Drilling Fluids system to avoid Formation damage) with goal minimized operational cost.

07/01 12/05

PT BAROID HALLIBURTON INDONESIA


SENIOR DFE, SERVICES COORDINATOR, SENIOR TECHNICAL PROFESIONAL

Location : Indonesia (Sumatera, Jawa-Madura-Bali, Kalimantan), and Abu Dhabi - Middle East
Tasks :
Assigned for APD (Asean Petroleum Development) Malaca Straight, Medco Moeco Muku Langsa Ltd
(Malaca Straight), Ellipse Energy Jatirarangon Cikarang - Jakarta, PT.Caltex Pacific Indonesia (Riau-Central
Sumatera), PERTAMINA UPEP I & II Pangkalansusu & Prabumulih (North & South Sumatera), PT.
EXSPAN Nusantara (South Sumatera and Madura), TOTAL FINA ELF Balikpapan (East Kalimantan),
VICO Balikpapan (East Kalimantan), Drilling Fluids system experiences : Potassium Lime Morex, KCL
Polymer, KCL PHPA Polymer, KCL PHPA Polymer Glycol, Polynox Mud System, KCL-XCD and
Bridging Agent (CaCO3) for Horizontal well section, Sea Water Polymer, Synthetic Oil Base Mud and
Completion Fluid.

Experienced in All Water Base Mud System, Oil Base or NABM system, MMH / Visplex Mud system, Drill in
Fluids for Horizontal Well, Workover and Completion Fluids (including Gravel Pack for Multy Zone System),
Underbalance Drilling System, and Mud Cup or Drilling using MPD / RCD / EKD System.

07/00 07/01

TAC PERTAMINA- PERKASA EQUATORIAL SEMBAKUNG LTD


GEOLOGIST AND DRILLING ENGINEER

Location : Northern East Kalimantan - Indonesia


Tasks :
Provide expert geological description and evaluation of reservoir and field development program based on 2D & 3-D Seismic data and the latest data of in-fill drilling.
Well Sitting and Drilling Engineer: Coordinate engineering / technical drilling practice for deviated well during
drilling operation, like: compatible system of drilling fluids, logging system (MWD & LWD), correlation near by
well to determine casing point, cementing system, suggest zone of interest for perforation, collect all
engineering data and also coordination with other operation department (production & drilling) during 3-D
Seismic Operation (especially during recording operation).
Prepare recommendation with respect to the application of Enhanced Oil Recovery techniques by
Stratigraphy / Structural cross section, core analysis, compatibility test, reservoir management and field
development strategies in coordination with colleagues.
Contribute actively to the team concept for undertaking work, exploiting opportunities and solving problems.

06/99 06/00

Location : Indonesia
Tasks :

PT OKTAF CHEMICALS
TECHNICAL MANAGER

Bambang SUDJARWO

Responsible in all technical aspect of company product (Industrial Cleaners and Lubricants).

JOB PERTAMINA PERMINDO PERLAK


RESERVOIR GEOLOGIST AND DRILLING ENGINEER

04/97 04/99

Location : North Sumatera - Aceh Province


Tasks :
Provide Expert geological description and evaluation of reservoir and field development program.
Prepare proposal and recommendation with respect to the application of EOR techniques and reservoir
management and field development strategies in coordination with subordinates and colleagues.
Coordinate and/or conduct engineering studies related to in-fill drilling, water injection well section, formation
damage, water quality, petrophysics, optimum completion techniques, tracer studies, and pressure transient
analysis.
Prepare budget recommendation (cost estimation i.e. Tangible and Intangible cost per project and/or whole
project by year, realized by WP&B), progress report, reserve report and government submission as required.
Contribute actively to the team concept for under taking work, exploiting opportunities and solving the
problem.

02/90 03/97

DOWELL SCHLUMBERGER, PT M-I , AND PT. DRESSER MAGCOBAR


SENIOR DRILLING FLUIDS ENGINEER

Location : Indonesia
Tasks :
Assigned for Asamera Co.Ltd (Ramba & Jambi South Sumatera), Canada North West Energy JOB
PERTAMINA (Ogan Komering South Sumatera), Vico Indonesia (Balikpapan East Kalimantan), PT. CALTEX
Pacific Indonesia (Riau-Central Sumatera), PERTAMINA UPEP-I Rantau (Sungai Tualang, Rantau Panjang,
Pangkalansusu East Aceh, North Sumatera), and also assigned overseas job for ADCO OIL co.Ltd (Abu Dhabi
Middle East).
Drlling Fluids System Experiences:
o Fresh Water / Gel / Benex (Spud Mud).
o Lignosulfonate / Dispersed.
o Low Solid Non Dispersed.
o KCL-Dispersed, KCL-Polymer, KCL-PHPA-Polymer.
o Fresh / Salt water Polymer.
o Completion & Workover Fluids.
o Invert Oil Mud (Diesel / Synthetic non Toxic).
o Visplex Mud (Positif ion charge / MMH).
o Glycol Mud.

Bambang SUDJARWO

Prepare project proposal / project planning included: Technical aspect and recommendation, Manage man-power
(skill / Expert and Labor) as per job required, Arrange materials and equipment as per job
schedule/required/program, Calculation and estimate cost as per program required.
Control budget and accuracy of time job by job as per program required.
Prepare Project Report included Summary and Suggestion.
Inspection of cleaning and coating drill string equipment (Casing, drill pipe, and tubing) before used in drilling
and/or work-over completion operation (Cooperation with other services company i.e. Wheatherford, Halliburton,
and Dowell Schlumberger).

1983 1987

OTHER WORK

Location : Indonesia
Tasks :

1986 1987 : Geological Mapping in Kedungdung Area, Kabupaten Sampang Madura, East Java, as
Thesis Project.

March 1985-May 1985 : A Member of Geohydrological Survey Team (as a Wellsite supervisor during drilling
activity) in Lamongan, Cepu, Bojonegoro East Java (A Cooperation between Geology Dept.UGM and
Bengawan Solo Project, Public Work Dept).

September 1984 January 1985 : Job Training Student on Development Geology Dept at HUFFCO
Indonesia Balikpapan East Kalimantan. During this period of time, I was assigned to do Wellsite Geologist
and Study The Shallow Oil Bearing X Zone in Pamaguan oil field consisting of investigation : Electrical Log
Analysis, (Qualitative and Quantitative analysis), Side-wall cores & Paleontological analysis, made
Stratigraphic & Structural cross section, Sub-surface mapping, and Reserve Calculation.

August 1983 December 1983 : A Member of Geohydrological Survey Team on Pumping Test and Water
Evaluation Project (as Wellsites Supervisor during pumping test activity) in Kediri East Java (a Cooperation
between Geology Depth UGM and P2AT Kediri Project, Public Work Dept).
****

S-ar putea să vă placă și