Sunteți pe pagina 1din 1

27494 Federal Register / Vol. 71, No.

91 / Thursday, May 11, 2006 / Notices

link also provides access to the texts of to continue project operations until the license waived the applicability of
the formal documents issued by the Commission issues someone else a section 15 of the FPA, then, based on
Commission, such as orders, notices, license for the project or otherwise section 9(b) of the Administrative
and rulemakings. orders disposition of the project. Procedure Act, 5 U.S.C. 558(c), and as
In addition, the Commission now If the project is subject to section 15 set forth at 18 CFR 16.21(a), if the
offers a free service call eSubscription, of the FPA, notice is hereby given that licensee of such project has filed an
which allows you to keep track of all an annual license for Project No. 2111 application for a subsequent license, the
formal issuances and submittals in is issued to PacifiCorp for a period licensee may continue to operate the
specific dockets. This can reduce the effective May 1, 2006 through April 30, project in accordance with the terms
amount of time you spend researching 2007, or until the issuance of a new and conditions of the license after the
proceedings by automatically providing license for the project or other minor or minor part license expires,
you with notification of these filings, disposition under the FPA, whichever until the Commission acts on its
document summaries, and direct links comes first. If issuance of a new license application. If the licensee of such a
to the documents. Go to http:// (or other disposition) does not take project has not filed an application for
www.ferc.gov/esubscribenow.htm. place on or before April 30, 2007, notice a subsequent license, then it may be
is hereby given that, pursuant to 18 CFR required, pursuant to 18 CFR 16.21(b),
Magalie R. Salas,
16.18(c), an annual license under to continue project operations until the
Secretary. section 15(a)(1) of the FPA is renewed Commission issues someone else a
[FR Doc. E6–7192 Filed 5–10–06; 8:45 am] automatically without further order or license for the project or otherwise
BILLING CODE 6717–01–P notice by the Commission, unless the orders disposition of the project.
Commission orders otherwise. If the If the project is subject to section 15
project is not subject to section 15 of the of the FPA, notice is hereby given that
DEPARTMENT OF ENERGY FPA, notice is hereby given that an annual license for Project No. 935 is
Federal Energy Regulatory PacifiCorp, is authorized to continue issued to PacifiCorp for a period
Commission operation of the Swift No. 1 Project until effective May 1, 2006 through April 30,
such time as the Commission acts on its 2007, or until the issuance of a new
[Project No. 2111] application for a subsequent license. license for the project or other
Magalie R. Salas, disposition under the FPA, whichever
PacifiCorp; Notice of Authorization for comes first. If issuance of a new license
Continued Project Operation Secretary.
(or other disposition) does not take
[FR Doc. E6–7167 Filed 5–10–06; 8:45 am]
May 4, 2006. place on or before April 30, 2007, notice
BILLING CODE 6717–01–P
On April 28, 2004, PacifiCorp, is hereby given that, pursuant to 18 CFR
licensee for the Swift No. 1 16.18(c), an annual license under
Hydroelectric Project, filed an section 15(a)(1) of the FPA is renewed
DEPARTMENT OF ENERGY
application for a new or subsequent automatically without further order or
license pursuant to the Federal Power Federal Energy Regulatory notice by the Commission, unless the
Act (FPA) and the Commission’s Commission Commission orders otherwise. If the
regulations thereunder. The Swift No. 1 project is not subject to section 15 of the
[Project No. 935] FPA, notice is hereby given that
Project is located on the Lewis River in
Skamania County, Washington. PacifiCorp, is authorized to continue
PacifiCorp; Notice of Authorization for operation of the Merwin Project until
The license for Project No. 2111 was Continued Project Operation
issued for a period ending April 30, such time as the Commission acts on its
2006. Section 15(a)(1) of the FPA, 16 May 4, 2006. application for a subsequent license.
U.S.C. 808(a)(1), requires the On April 28, 2004, PacifiCorp, Magalie R. Salas,
Commission, at the expiration of a licensee for the Merwin Hydroelectric Secretary.
license term, to issue from year-to-year Project, filed an application for a new or
[FR Doc. E6–7169 Filed 5–10–06; 8:45 am]
an annual license to the then licensee subsequent license pursuant to the
BILLING CODE 6717–01–P
under the terms and conditions of the Federal Power Act (FPA) and the
prior license until a new license is Commission’s regulations thereunder.
issued, or the project is otherwise The Merwin Project is located on the DEPARTMENT OF ENERGY
disposed of as provided in section 15 or Lewis River in Clark and Cowlitz
any other applicable section of the FPA. County, Washington. Federal Energy Regulatory
If the project’s prior license waived the The license for Project No. 935 was Commission
applicability of section 15 of the FPA, initially issued for a period ending
then, based on section 9(b) of the December 11, 2009. On April 8, 1999, Notice of Application Accepted for
Administrative Procedure Act, 5 U.S.C. the Commission amended the license Filing and Soliciting Comments,
558(c), and as set forth at 18 CFR and accelerated the Merwin project Protests, and Motions To Intervene
16.21(a), if the licensee of such project expiration date to April 30, 2006.
has filed an application for a subsequent Section 15(a)(1) of the FPA, 16 U.S.C. May 3, 2006.
license, the licensee may continue to 808(a)(1), requires the Commission, at Take notice that the following
operate the project in accordance with the expiration of a license term, to issue hydroelectric application has been filed
the terms and conditions of the license from year-to-year an annual license to with the Commission and is available
after the minor or minor part license the then licensee under the terms and for public inspection:
cchase on PROD1PC60 with NOTICES

expires, until the Commission acts on conditions of the prior license until a a. Type of Application: Preliminary
its application. If the licensee of such a new license is issued, or the project is Permit.
project has not filed an application for otherwise disposed of as provided in b. Project No.: 12660–000.
a subsequent license, then it may be section 15 or any other applicable c. Date Filed: March 13, 2006.
required, pursuant to 18 CFR 16.21(b), section of the FPA. If the project’s prior d. Applicant: TDX Power, Inc.

VerDate Aug<31>2005 16:29 May 10, 2006 Jkt 208001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\11MYN1.SGM 11MYN1

S-ar putea să vă placă și