7. A work center has 4 machines available for 8 hours per day, 5 days per week.
The work center is utilized 100 hours but produces 120 hours of standards work.
The efficiency of the work center is:
A. 50%
B. 62.5 %
C. 75 %
D. 120 %
8. Which of the following will affect available capacity?
Product specifications
Product mix
Quantity of customer order
Work pace
A.
B.
C.
D.
1,2 and 3.
1,2 and 4.
2,3 and 4.
1,3 and 4.
1,2 and 3.
1,2 and 4.
2, 3 and 4.
1,2,3 and 4.
Week
Customer Orders
MPS
ATP
1
60
110
20
2
30
3
20
110
50
4
40
Based on the above, what action can the planner take regarding an order for 60
in week 3?
A. Reject the order for 60; tell the customer 50 are available.
B. Accept the order for week 4 for 60
C. Accept the order for week 2 for 60
D. Accept the order for week 3 for 60
11. Which of the following manufactured product types are best suited for the
flow manufacturing?
A. Wide range of disparate products
1,2 and 3.
2,3 and 4.
1,3 and 4.
1,2 and 4.
2
10
3
15
4
15
5
10
14
15
16
17
14. The last operation is scheduled for completion on the due date. Other
previous operations are scheduled so that the due date can be met. This
describes:
A. backward scheduling
B. master scheduling
C. capacity scheduling
D. forward scheduling
Ans:
1-c
11-b
2-a
3-c
12-d 13-c
4-b
5-d
14-a
6-d
7-d
8-b
9-b
10-d