Sunteți pe pagina 1din 4

Federal Register / Vol. 71, No.

73 / Monday, April 17, 2006 / Proposed Rules 19663

That NPRM proposed to revise the Upon further consideration, we 1B, 1D, and 1D1 engines only. This
existing airworthiness directive (AD) hereby withdraw the proposed rule proposed AD revision would require the
applicable to Rolls-Royce plc (RR) based on RR’s analysis and conclusion same actions, but would relax the
Model RB211 Trent 892, 884, 877, 875, stated above. compliance times for initially replacing
and 892B series turbofan engines. That Withdrawal of this notice of proposed 2nd stage turbines in Arriel 1B, 1D, and
proposed rule would have required rulemaking constitutes only such action, 1D1 turboshaft engines. This proposed
initial and repetitive inspections of the and does not preclude the agency from AD revision results from a request by
angled drive upper shroud, the issuing another notice in the future, nor Turbomeca to clarify the compliance
intermediate gearbox housing (IGH), and does it commit the agency to any course times for 2nd stage turbine initial
the external gearbox lower bevel box of action in the future. replacement on Arriel 1D, 1D1, and 1B
(LBB) housing, and initial and repetitive Since this action only withdraws a turboshaft engines. We are proposing
master magnetic chip detector (MCD) notice of proposed rulemaking, it is this AD revision to clarify and relax the
inspections. Since we issued that neither a proposed nor a final rule. AD compliance times for 2nd stage
proposed rule, RR notified us that after Executive Order 12866, the Regulatory turbine initial replacement on Arriel 1B,
reviewing the service experience and Flexibility Act, or DOT Regulatory 1D, and 1D1 turboshaft engines. We are
the original actions taken, the unsafe Policies and Procedures (44 FR 11034, also proposing this AD revision to
condition no longer exists and February 26, 1979) do not cover this prevent inflight engine shutdown and
mandatory actions required by the withdrawal. subsequent forced autorotation landing
proposed rule are no longer required. or accident.
List of Subjects in 14 CFR Part 39
Accordingly, we withdraw the proposed DATES: We must receive any comments
rule. Air transportation, Aircraft, Aviation on this proposed AD revision by June
FOR FURTHER INFORMATION CONTACT: safety, Safety. 16, 2006.
Christopher Spinney, Aerospace The Withdrawal ADDRESSES: Use one of the following
Engineer, Engine Certification Office, addresses to comment on this proposed
FAA, Engine and Propeller Directorate, Accordingly, we withdraw the notice
AD revision.
of proposed rulemaking, Docket No. 97–
12 New England Executive Park, • DOT Docket Web site: Go to
Burlington, MA 01803; telephone (781) ANE–09, published in the Federal
http://dms.dot.gov and follow the
238–7175; fax (781) 238–7199. Register on November 2, 1999 (64 FR
instructions for sending your comments
59137).
SUPPLEMENTARY INFORMATION: The FAA electronically.
proposed to amend 14 CFR part 39 with Issued in Burlington, Massachusetts, on • Government-wide rulemaking Web
a proposed AD. The proposed AD April 11, 2006. site: Go to http://www.regulations.gov
applies to RR Model RB211 Trent 892, Francis A. Favara, and follow the instructions for sending
884, 877, 875, and 892B series turbofan Manager, Engine and Propeller Directorate, your comments electronically.
engines. We published the proposed AD Aircraft Certification Service. • Mail: Docket Management Facility;
in the Federal Register on November 2, [FR Doc. E6–5666 Filed 4–14–06; 8:45 am] U.S. Department of Transportation, 400
1999 (64 FR 59137). That proposed BILLING CODE 4910–13–P Seventh Street, SW., Nassif Building,
action would have required initial and Room PL–401, Washington, DC 20590–
repetitive inspections of the angled 0001.
drive upper shroud, the intermediate DEPARTMENT OF TRANSPORTATION • Fax: (202) 493–2251.
gearbox housing (IGH), and the external • Hand Delivery: Room PL–401 on
gearbox lower bevel box (LBB) housing. Federal Aviation Administration the plaza level of the Nassif Building,
In addition, that proposed AD would 400 Seventh Street, SW., Washington,
have required initial and repetitive 14 CFR Part 39 DC, between 9 a.m. and 5 p.m., Monday
master magnetic chip detector (MCD) [Docket No. FAA–2005–21242; Directorate through Friday, except Federal holidays.
inspections. Also, that proposed AD Identifier 2005–NE–09–AD] Contact Turbomeca, 40220 Tarnos,
would have eliminated the repetitive France; telephone +33 05 59 74 40 00,
inspections of the IGH, external gearbox RIN 2120–AA64 fax +33 05 59 74 45 15, for the service
LBB housing, and the angled drive information identified in this proposed
Airworthiness Directives; Turbomeca AD revision.
upper shroud, if the engines have Arriel 1B, 1D, 1D1, and 1S1 Turboshaft
incorporated modifications described in FOR FURTHER INFORMATION CONTACT:
Engines
certain RR service bulletins. Also, that Christopher Spinney, Aerospace
proposed AD would have increased the AGENCY: Federal Aviation Engineer, Engine Certification Office,
inspection interval for repetitive master Administration (FAA), Department of FAA, Engine and Propeller Directorate,
MCD inspections. That proposed AD Transportation (DOT). 12 New England Executive Park,
resulted from service experience since ACTION: Notice of proposed rulemaking Burlington, MA 01803; telephone (781)
publication of AD 97–06–13. We (NPRM). 238–7175, fax (781) 238–7199.
proposed that AD to prevent loss of oil, SUPPLEMENTARY INFORMATION:
which could cause an engine fire, and SUMMARY: The FAA proposes to revise
in-flight engine shutdowns and airplane an existing airworthiness directive (AD) Comments Invited
diversions caused by oil loss and for certain Turbomeca Arriel 1B, 1D, We invite you to send any written
bearing failures. 1D1, and 1S1 turboshaft engines. That relevant data, views, or arguments
Since we issued that proposed AD, RR AD currently requires initial and regarding this proposal. Send your
cchase on PROD1PC60 with PROPOSALS

notified us that after reviewing the repetitive position checks of the gas comments to an address listed under
service experience and the original generator 2nd stage turbine blades on all ADDRESSES. Include ‘‘Docket No. FAA–
actions taken, the unsafe condition no Turbomeca Arriel 1B, 1D, 1D1, and 1S1 2005–21242; Directorate Identifier
longer exists and mandatory actions turboshaft engines. That AD also 2005–NE–09–AD’’ in the subject line of
required by the proposed AD are no currently requires initial and repetitive your comments. We specifically invite
longer required. replacements of 2nd stage turbines on comments on the overall regulatory,

VerDate Aug<31>2005 16:08 Apr 14, 2006 Jkt 208001 PO 00000 Frm 00003 Fmt 4702 Sfmt 4702 E:\FR\FM\17APP1.SGM 17APP1
19664 Federal Register / Vol. 71, No. 73 / Monday, April 17, 2006 / Proposed Rules

economic, environmental, and energy 1B, 1D, and 1D1 engines only. That action is necessary for products of this
aspects of the proposed AD. We will condition, if not corrected, could result type design that are certificated for
consider all comments received by the in uncommanded engine in flight operation in the United States.
closing date and may amend the shutdown.
FAA’s Determination and Requirements
proposed AD in light of those
Actions Since AD 2006–02–08 Was of the Proposed AD Revision
comments.
We will post all comments we Issued
We have evaluated all pertinent
receive, without change, to http:// Since that AD 2006–02–08 was information and identified an unsafe
dms.dot.gov, including any personal issued, Turbomeca asks if our intent is condition that is likely to exist or
information you provide. We will also to require initial replacement of all develop on other products of this same
post a report summarizing each Arriel 1B, 1D, and 1D1 2nd stage type design. We are proposing this AD
substantive verbal contact with FAA turbines by August 31, 2006. Turbomeca revision, which would require:
personnel concerning this proposed AD. states that if so, the compliance time in
the AD is too restrictive. Turbomeca • Initial and repetitive position
Using the search function of the DMS
requests that we clarify the AD checks of the 2nd stage turbine blades
Web site, anyone can find and read the
compliance times for 2nd stage turbine on Turbomeca Arriel 1B, 1D, 1D1, and
comments in any of our dockets,
initial replacement on Arriel 1B, 1D, 1S1 turboshaft engines.
including the name of the individual
who sent the comment (or signed the and 1D1 turboshaft engines. • Replacement of 2nd stage turbines
comment on behalf of an association, We recognize that our intent is not on 1B and 1D1 engines only.
business, labor union, etc.). You may clear in the AD. Our intent is not to • Initially replacing 2nd stage
review the DOT’s complete Privacy Act require all Arriel 1D, 1D1, and 1B 2nd turbines in Arriel 1B, 1D, and 1D1
Statement in the Federal Register stage turbine initial replacements by turboshaft engines at relaxed
published on April 11, 2000 (65 FR August 31, 2006. Our intent is to require compliance times.
19477–78) or you may visit http:// initial replacement of only those Arriel The proposed AD revision would
dms.dot.gov. 1B, 1D, and 1D1 2nd stage turbines that require that you do these actions using
are over the hourly limits specified. We the service information described
Examining the AD Docket are proposing this AD revision to clarify previously.
You may examine the docket that and relax the AD compliance times for
contains the proposal, any comments 2nd stage turbine initial replacement on Costs of Compliance
received and any final disposition in Arriel 1B, 1D, and 1D1 turboshaft We estimate that this proposed AD
person at the DMS Docket Office engines. We are also proposing this AD revision would affect 721 engines
between 9 a.m. and 5 p.m., Monday revision to prevent inflight engine installed on helicopters of U.S. registry.
through Friday, except Federal holidays. shutdown and subsequent forced We also estimate that it would take
The Docket Office (telephone (800) 647– autorotation landing or accident. about 2 workhours per engine to inspect
5227) is located on the plaza level of the
Relevant Service Information all 721 engines and 40 workhours per
Department of Transportation Nassif
engine to replace about 571 2nd stage
Building at the street address stated in We have reviewed and approved the
turbines on 1B and 1D1 engines, and
ADDRESSES. Comments will be available technical contents of Turbomeca Alert
that the average labor rate is $80 per
in the AD docket shortly after the DMS Service Bulletins (ASBs) A292 72 0807,
work hour. Required parts would cost
receives them. for Arriel 1B post-TU 148; ASB A292 72
about $3,200 per engine. Based on these
0808, for Arriel 1D; ASB A292 72 0809,
Discussion figures, we estimate the total cost of the
for Arriel 1D1; and ASB A292 72 0810,
On January 12, 2006, the FAA issued proposed AD revision to U.S. operators
for Arriel 1S1, all dated March 24, 2004.
AD 2006–02–08, Amendment 39–14460 to be $4,249,760.
These ASBs describe procedures for
(71 FR 3754, January 24, 2006). The initial and repetitive position checks of Authority for This Rulemaking
Direction Generale de L’Aviation Civile the 2nd stage turbine blades, and
(DGAC), which is the airworthiness replacement of 2nd stage turbines on 1B Title 49 of the United States Code
authority for France, notified the FAA and 1D1 engines only. The DGAC specifies the FAA’s authority to issue
that an unsafe condition might exist on classified these ASBs as mandatory and rules on aviation safety. Subtitle I,
Turbomeca, Arriel 1B (modified per TU issued airworthiness directive F–2004– section 106, describes the authority of
148), 1D, 1D1, and 1S1 turboshaft 047, dated March 31, 2004, in order to the FAA Administrator. Subtitle VII,
engines. The DGAC advises that sixteen ensure the airworthiness of these Aviation Programs, describes in more
cases of release of gas generator 2nd Turbomeca Arriel 1B, 1D, 1D1 and 1S1 detail the scope of the Agency’s
stage turbine blades occurred in service, turboshaft engines in France. authority.
with full containment of debris. These We are issuing this rulemaking under
events resulted in uncommanded engine Bilateral Agreement Information the authority described in subtitle VII,
in flight shutdowns. Although This engine model is manufactured in part A, subpart III, section 44701,
terminating action is still unavailable, France and is type certificated for ‘‘General requirements.’’ Under that
mandatory checks of the turbine blades operation in the United States under the section, Congress charges the FAA with
and replacement of the turbine are being provisions of section 21.29 of the promoting safe flight of civil aircraft in
required in order to reduce the Federal Aviation Regulations (14 CFR air commerce by prescribing regulations
probability of an uncommanded engine 21.29) and the applicable bilateral for practices, methods, and procedures
in flight shutdown. That AD requires airworthiness agreement. In keeping the Administrator finds necessary for
cchase on PROD1PC60 with PROPOSALS

initial and repetitive position checks of with this bilateral airworthiness safety in air commerce. This regulation
the gas generator 2nd stage turbine agreement, the DGAC kept us informed is within the scope of that authority
blades on all Turbomeca Arriel 1B, 1D, of the situation described above. We because it addresses an unsafe condition
1D1, and 1S1 turboshaft engines. That have examined the findings of the that is likely to exist or develop on
AD also requires initial and repetitive DGAC, reviewed all available products identified in this rulemaking
replacements of 2nd stage turbines on information, and determined that AD action.

VerDate Aug<31>2005 16:08 Apr 14, 2006 Jkt 208001 PO 00000 Frm 00004 Fmt 4702 Sfmt 4702 E:\FR\FM\17APP1.SGM 17APP1
Federal Register / Vol. 71, No. 73 / Monday, April 17, 2006 / Proposed Rules 19665

Regulatory Findings the Federal Aviation Administration on, but not limited to, Eurocopter France AS–
proposes to amend 14 CFR part 39 as 350B1 ‘‘Ecureuil’’ helicopters. Arriel 1D1
We have determined that this engines are installed on, but not limited to,
proposed AD revision would not have follows:
Eurocopter France AS–350B2 ‘‘Ecureuil’’
federalism implications under Executive helicopters. Arriel 1S1 engines are installed
PART 39—AIRWORTHINESS
Order 13132. This proposed AD revision on, but not limited to, Sikorsky Aircraft S–
DIRECTIVES
would not have a substantial direct 76A and S–76C helicopters.
effect on the States, on the relationship 1. The authority citation for part 39
Unsafe Condition
between the national Government and continues to read as follows:
the States, or on the distribution of (d) This AD revision results from a request
Authority: 49 U.S.C. 106(g), 40113, 44701. by Turbomeca to clarify the compliance
power and responsibilities among the
various levels of government. § 39.13 [Amended] times for 2nd stage turbine initial
For the reasons discussed above, I replacement on Arriel 1B, 1D, and 1D1
2. The FAA amends § 39.13 by turboshaft engines. We are issuing this AD
certify that the proposed regulation: removing Amendment 39–14460 (71 FR revision to clarify and relax the AD
1. Is not a ‘‘significant regulatory 3754, January 24, 2006) and by adding compliance times for 2nd stage turbine initial
action’’ under Executive Order 12866; a new airworthiness directive, to read as replacement on Arriel 1B, 1D, and 1D1
2. Is not a ‘‘significant rule’’ under the
follows: turboshaft engines. We are also issuing this
DOT Regulatory Policies and Procedures AD revision to prevent inflight engine
(44 FR 11034, February 26, 1979); and Turbomeca: Docket No. FAA–2005–21242;
shutdown and subsequent forced
3. Would not have a significant Directorate Identifier 2005-NE–09–AD.
autorotation landing or accident.
economic impact, positive or negative, Comments Due Date
on a substantial number of small entities Compliance
(a) The Federal Aviation Administration
under the criteria of the Regulatory (FAA) must receive comments on this (e) You are responsible for having the
Flexibility Act. airworthiness directive (AD) action by June actions required by this AD revision
We prepared a regulatory evaluation 16, 2006. performed within the compliance times
of the estimated costs to comply with specified unless the actions have already
Affected ADs been done.
this proposed AD revision. See the
ADDRESSES section for a location to (b) This AD revises AD 2006–02–08, Initial Relative Position Check of 2nd Stage
examine the regulatory evaluation. Amendment 39–14460. Turbine Blades
Applicability (f) Do an initial relative position check of
List of Subjects in 14 CFR Part 39
(c) This AD revision applies to Turbomeca the 2nd stage turbine blades using the
Air transportation, Aircraft, Aviation Arriel 1B engines fitted with 2nd stage Turbomeca mandatory alert service bulletins
safety, Safety. turbine modification TU 148, and Arriel 1D, (ASBs) specified in the following Table 1. Do
1D1, and 1S1 engines. Arriel 1B engines are the check before reaching any of the intervals
The Proposed Amendment
installed on, but not limited to, Eurocopter specified in Table 1 or within 50 hours time-
Accordingly, under the authority France AS–350B and AS–350A ‘‘Ecureuil’’ in-service after the effective date of this AD,
delegated to me by the Administrator, helicopters. Arriel 1D engines are installed whichever occurs later.

TABLE 1.—INITIAL AND REPETITIVE RELATIVE POSITION CHECK INTERVALS OF 2ND STAGE TURBINE BLADE
Initial relative position check
Turbomeca engine model Repetitive interval Mandatory alert service bulletin
interval

Arriel 1B (modified per TU 148) .... Within 1,200 hours time-since- Within 200 hours time-in-service- A292 72 0807, dated March 24,
new (TSN) or time-since-over- since-last-relative-position- 2004.
haul (TSO) or 3,500 cycles- check (TSLRPC).
since-new (CSN) or cycles-
since-overhaul (CSO), which-
ever occurs earlier.
Arriel 1D1 and Arriel 1D ................ Within 1,200 hours TSN or TSO Within 150 hours TSLRPC ........... A292 72 0809, Update No. 1,
or 3,500 hours CSN or CSO, dated October 4, 2005.
whichever occurs earlier.
Arriel 1S1 ....................................... Within 1,200 hours TSN or TSO Within 150 hours TSLRPC ........... A292 72 0810, dated March 24,
or 3,500 hours CSN or CSO, 2004.
whichever occurs earlier.

Repetitive Relative Position Check of 2nd Initial Replacement of 2nd Stage Turbines (2) After August 31, 2006, replace the 2nd
Stage Turbine Blades on Arriel 1B, 1D, and 1D1 Engines stage turbine with a new or overhauled 2nd
stage turbine:
(g) Recheck the relative position of 2nd (i) Initially replace the 2nd stage turbine
(i) Before accumulating 1,500 hours TSN or
stage turbine blades at the TSLRPC intervals with a new or overhauled 2nd stage turbine TSO for Arriel 1D and 1D1 engines.
specified in Table 1 of this AD, using the as follows: (ii) Before accumulating 2,200 hours TSN
mandatory ASBs indicated. (1) On or before August 31, 2006, replace or TSO for Arriel 1B engines.
the 2nd stage turbine with a new or
Credit for Previous Relative Position Checks Repetitive Replacements of 2nd Stage
overhauled 2nd stage turbine:
Turbines on Arriel 1B, 1D, and 1D1 Engines
cchase on PROD1PC60 with PROPOSALS

(h) Relative position checks of 2nd stage (i) As soon as practicable after
turbine blades done using Turbomeca Service accumulating 1,500 hours TSN or TSO for (j) Thereafter, replace the 2nd stage turbine
Bulletin A292 72 0263, Update 1, 2, 3, or 4, Arriel 1D and 1D1 engines. with a new or overhauled 2nd stage turbine
may be used to show compliance with the (ii) As soon as practicable after within every 1,500 hours TSN or TSO for
initial requirements of paragraph (f) of this Arriel 1D and 1D1 engines, and within every
accumulating 2,200 hours TSN or TSO for
AD. 2,200 hours TSN or TSO for Arriel 1B
Arriel 1B engines. engines.

VerDate Aug<31>2005 16:08 Apr 14, 2006 Jkt 208001 PO 00000 Frm 00005 Fmt 4702 Sfmt 4702 E:\FR\FM\17APP1.SGM 17APP1
19666 Federal Register / Vol. 71, No. 73 / Monday, April 17, 2006 / Proposed Rules

Criteria for Overhauled 2nd Stage Turbines Alternative Methods of Compliance listed in Table 2 of this AD in accordance
(k) Do the following to overhauled 2nd (m) The Manager, Engine Certification with 5 U.S.C. 552(a) and 1 CFR part 51, as
stage turbines, referenced in paragraphs (i) Office, has the authority to approve of February 28, 2006 (71 FR 3754, January 24,
and (j) of this AD: alternative methods of compliance for this 2006). Contact Turbomeca, 40220 Tarnos,
(1) You must install new blades in the 2nd AD if requested using the procedures found France; telephone +33 05 59 74 40 00, fax
stage turbines of overhauled Arriel 1D and in 14 CFR 39.19. +33 05 59 74 45 15, for a copy of this service
1D1 engines. information. You may review copies at the
(2) You may install either overhauled or Related Information
Docket Management Facility; U.S.
new blades in the 2nd stage turbines of (n) DGAC airworthiness directive F–2004– Department of Transportation, 400 Seventh
overhauled Arriel 1B engines. 047 R1, dated October 26, 2005, also
Street, SW., Nassif Building, Room PL–401,
addresses the subject of this AD.
Relative Position Check Continuing Washington, DC 20590–0001, on the Internet
Compliance Requirements Material Incorporated by Reference at http://dms.dot.gov, or at the National
(l) All 2nd stage turbines, including those (o) You must use the service information Archives and Records Administration
that are new or overhauled, must continue to specified in Table 2 of this AD to perform the (NARA). For information on the availability
comply with relative position check actions required by this AD. The Director of of this material at NARA, call 202–741–6030,
requirements of paragraphs (f) and (j) of this the Federal Register previously approved the or go to: http://www.archives.gov/federal-
AD. incorporation by reference of the documents register/cfr/ibr-locations.html.

TABLE 2.—INCORPORATION BY REFERENCE


Turbomeca mandatory alert service bulletin No. Page Update No. Date

A292 72 0807, Total Pages: 17 ............................................................................................. ALL ............... Original ......... March 24, 2004.
A292 72 0809, Total Pages: 18 ............................................................................................. ALL ............... 1 ................... October 4, 2005.
A292 72 0810, Total Pages: 14 ............................................................................................. ALL ............... Original ......... March 24, 2004.

Issued in Burlington, Massachusetts, on • Fax: (202) 482–5650 (Attn: Michael subsequently redelegated to the Bureau
April 11, 2006. Vaccaro); of Industry and Security.
Francis A. Favara,
• Mail or Hand Delivery/Courier: Originally published in 1984, the
Manager, Engine and Propeller Directorate, Michael Vaccaro, U.S. Department of DPAS regulation was revised on
Aircraft Certification Service.
Commerce, Bureau of Industry and June 11, 1998 (63 FR 31918) to update,
[FR Doc. E6–5646 Filed 4–14–06; 8:45 am] Security, Office of Strategic Industries streamline, and clarify a number of
BILLING CODE 4910–13–P and Economic Security, 1401 provisions. Allocations rules like the
Constitution Avenue, NW., Room 3876, DPAS (i.e., controlled materials
Washington, DC 20230. programs) were established in response
DEPARTMENT OF COMMERCE to previous periods of national security
FOR FURTHER INFORMATION CONTACT: emergency such as the Second World
Bureau of Industry and Security Liam McMenamin, Office of Strategic War and the Korean conflict to assure
Industries and Economic Security, the availability of any scarce and critical
15 CFR Part 700 Bureau of Industry and Security, U.S. item for approved programs. The basic
Department of Commerce, Phone: (202) elements of the controlled materials
[Docket No. 060215037–6037–01]
482–2233. programs were set-asides (the amount of
Defense Priorities and Allocations an item for which a producer or
SUPPLEMENTARY INFORMATION:
System (DPAS): Metalworking supplier must reserve order-book space
Machines Background in anticipation of the receipt of rated
orders), production directives (requiring
AGENCY: Bureau of Industry and Under Title I of the Defense a producer to supply a specific quantity,
Security, U.S. Department of Commerce. Production Act of 1950, as amended, (50 size, shape, and type of an item within
ACTION: Notice of inquiry. U.S.C. App. 2061, et seq.), the President a specific time period), and allotments
is authorized to require preferential (the maximum quantity of an item
SUMMARY: The Bureau of Industry and acceptance and performance of authorized for use in a specific program
Security (BIS) is seeking public contracts or orders supporting certain or application).
comments on the impact of the Defense approved national defense and energy
Priorities and Allocations System programs, and to allocate materials, Discussion and Request for Comments
(DPAS) set-aside for metalworking services, and facilities in such a manner Currently, the DPAS regulation
machines on industry (15 CFR 700.31). as to promote these approved programs. includes a set-aside that applies to
This notice of inquiry is part of an effort Additional priorities authority is found metalworking machines. Section 700.31
to collect information to assist in the in section 18 of the Selective Service of the DPAS regulation states as follows:
preparation of revisions to the DPAS Act of 1948 (50 U.S.C. App. 468), 10 ‘‘(c) A metalworking machine producer is
regulation (15 CFR part 700), including U.S.C. 2538, and 50 U.S.C. 82. DPAS not required to accept DO rated orders calling
the possible elimination of the authority has also been extended to for delivery in any month of a total quantity
metalworking machines set-aside. support emergency preparedness of any size of machine in excess of 60 percent
DATES: Comments must be received by activities under Title VI of the Robert T. of scheduled production of that size of
cchase on PROD1PC60 with PROPOSALS

May 17, 2006. Stafford Disaster Relief Act and machine for that month, or any DO rated
Emergency Assistance Act, as amended orders received less than three months prior
ADDRESSES: You may submit comments
to the beginning of the month for which
by any of the following methods: (45 U.S.C. 5914, et seq.) The President delivery is requested. However, DX rated
• E-mail: DPAS@bis.doc.gov. Include delegated DPAS authority to the orders must be accepted without regard to a
the phrase ‘‘Metalworking Machines Department of Commerce in Executive set-aside or the lead time, if delivery can be
Notice of Inquiry’’ in the subject line; Order 12919 (June 3, 1994), and it was made by the required date.’’

VerDate Aug<31>2005 16:08 Apr 14, 2006 Jkt 208001 PO 00000 Frm 00006 Fmt 4702 Sfmt 4702 E:\FR\FM\17APP1.SGM 17APP1

S-ar putea să vă placă și