Sunteți pe pagina 1din 2

19174 Federal Register / Vol. 71, No.

71 / Thursday, April 13, 2006 / Notices

Electric Power Cooperative, Bonneville DEPARTMENT OF ENERGY Procedural Matters


Power Administration, Citizens Utilities Any person desiring to become a
Company, Eastern Maine Electric [OE Docket No. EA–289–A] party to these proceedings or to be heard
Cooperative, International Transmission by filing comments or protests to this
Company, Joint Owners of the Highgate Application to Export Electric Energy; application should file a petition to
Project, Long Sault, Inc., Maine Electric Intercom Energy, Inc. intervene, comment or protest at the
Power Company, Maine Public Service address provided above in accordance
Company, Minnesota Power Inc., AGENCY: Office of Electricity Delivery
with §§ 385.211 or 385.214 of the
Minnkota Power Cooperative, New York and Energy Reliability, DOE.
FERC’s Rules of Practice and Procedures
Power Authority, Niagara Mohawk ACTION: Notice of application. (18 CFR 385.211, 385.214). Fifteen
Power Corporation, Northern States copies of each petition and protest
Power, and Vermont Electric SUMMARY: Intercom Energy, Inc.,
should be filed with DOE on or before
Transmission Company. The (Intercom) has applied to renew its the dates listed above.
construction, operation, maintenance, authority to transmit electric energy Comments on the Intercom
and connection of each of the from the United States to Mexico application to export electric energy to
international transmission facilities to pursuant to section 202(e) of the Federal Mexico should be clearly marked with
be utilized by FC as more fully Power Act. Docket EA–289–A. Additional copies
described in the application, has DATES: Comments, protests, or requests are to be filed directly with Ernesto
previously been authorized by a to intervene must be submitted on or Pallares, Chief Executive Officer,
Presidential permit issued pursuant to before May 15, 2006. Intercom Energy, Inc., 303 H Street, Suit
Executive Order 10485, as amended. 401, Chula Vista, CA 91910, and Jon L.
ADDRESSES: Comments, protests, or
Procedural Matters requests to intervene should be Brunenkant, James W. Moeller,
addressed as follows: Office of Brunenkant & Haskell, LLP, 805 15th
Any person desiring to become a Street, NW., Suite 1101, Washington,
party to this proceeding or to be heard Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S. DC 20005, and Daniel J. Mogin, The
by filing comments or protests to this Mogin Law Firm, P.C., 110 Juniper
application should file a petition to Department of Energy, 1000
Independence Avenue, SW., Street, San Diego, CA 92101.
intervene, comment or protest at the A final decision will be made on this
address provided above in accordance Washington, DC 20585–0350 (FAX 202–
586–5860). application after the environmental
with §§ 385.211 or 385.214 of the impacts have been evaluated pursuant
FERC’s Rules of Practice and Procedures FOR FURTHER INFORMATION CONTACT:
to the National Environmental Policy
(18 CFR 385.211, 385.214). Fifteen Steven Mintz (Program Office) 202–586–
Act of 1969, and a determination is
copies of each petition and protest 9506 or Michael Skinker (Program
made by DOE that the proposed action
should be filed with DOE on or before Attorney) 202–586–2793.
will not adversely impact on the
the date listed above. SUPPLEMENTARY INFORMATION: Exports of reliability of the U.S. electric power
Comments on the FC application to electricity from the United States to a supply system.
export electric energy to Canada should foreign country are regulated and Copies of this application will be
be clearly marked with Docket EA–308. require authorization under section made available, upon request, for public
Additional copies are to be filed directly 202(e) of the Federal Power Act (FPA) inspection and copying at the address
with Jean-Jacques Taza, Director, First (16 U.S.C. 824a(e)). provided above or by accessing the
Commodities Ltd, Worthing Corporate Intercom is a California company with program’s Home Page at http://
Center, Worthing, Christ Church, its principal place of business in Chula www.fe.doe.gov/programs/
Barbados BB15008. Vista, California. Intercom does not own electricityregulation/. Upon reaching the
A final decision will be made on this or control electric generation or Home page, select ‘‘Pending
application after the environmental transmission assets in the United States Proceedings.’’
impacts have been evaluated pursuant or Mexico. In addition, Intercom has no
to the National Environmental Policy Issued in Washington, DC, on April 7,
franchised electric service area. 2006.
Act of 1969, and a determination is On May 19, 2004, the Department of
made by DOE that the proposed action Anthony J. Como,
Energy (DOE) issued Order No. EA–289
will not adversely impact on the Director, Permitting and Siting, Office of
authorizing Intercom to transmit electric Electricity Delivery and Energy Reliability.
reliability of the U.S. electric power energy from the United States to Mexico
supply system. [FR Doc. E6–5502 Filed 4–12–06; 8:45 am]
as a power marketer. That two year
Copies of this application will be authorization will expire on May 18, BILLING CODE 6450–01–P
made available, upon request, for public 2006.
inspection and copying at the address
On March 9, 2006, Intercom filed an DEPARTMENT OF ENERGY
provided above or by accessing the
application with DOE for renewal of the
program’s Home Page at http:// [OE Docket No. EA–216–B]
export authority contained in Order No.
www.fe.doe.gov/programs/
EA–289 for an additional five-year term.
electricityregulation/. Upon reaching the Application to Export Electric Energy;
Intercom proposes to export electric
Home page, select ‘‘Pending Transalta Energy Marketing (U.S.) Inc.
energy to Mexico and to arrange for the
Proceedings.’’
delivery of those exports over the AGENCY: Office of Electricity Delivery
Issued in Washington, DC, on April 7, international transmission facilities
HSRObinson on PROD1PC61 with NOTICES

and Energy Reliability, DOE.


2006. presently owned by San Diego Gas & ACTION: Notice of application.
Anthony J. Como, Electric Company, El Paso Electric
Director, Permitting and Siting, Office of Company, Central Power & Light SUMMARY: Transalta Energy Marketing
Electricity Delivery and Energy Reliability. Company, and Comision Federal de (U.S.) Inc. (TEMUS) has applied to
[FR Doc. E6–5501 Filed 4–12–06; 8:45 am] Electricidad, the national electric utility renew its authority to transmit electric
BILLING CODE 6450–01–P of Mexico. energy from the United States to Canada

VerDate Aug<31>2005 14:20 Apr 12, 2006 Jkt 208001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\13APN1.SGM 13APN1
Federal Register / Vol. 71, No. 71 / Thursday, April 13, 2006 / Notices 19175

pursuant to section 202(e) of the Federal should be filed with the DOE on or appropriate. Such notices, motions, or
Power Act. before the dates listed above. protests must be filed in accordance
DATES: Comments, protests, or requests Comments on the TEMUS application with the provisions of § 154.210 of the
to intervene must be submitted on or to export electric energy to Canada Commission’s regulations (18 CFR
before May 15, 2006. should be clearly marked with Docket 154.210). Anyone filing an intervention
EA–216–B. Additional copies are to be or protest must serve a copy of that
ADDRESSES: Comments, protests, or
filed directly with Sterling Koch, document on the Applicant. Anyone
requests to intervene should be General Counsel, TransAlta Energy filing an intervention or protest on or
addressed as follows: Office of Marketing (U.S.) Inc., Calgary, Alberta, before the intervention or protest date
Electricity Delivery and Energy Canada T2P 2M1, and Stephen Angle, need not serve motions to intervene or
Reliability, Mail Code: OE–20, U.S. William E. Wolf, Vinson & Elkins L.L.P., protests on persons other than the
Department of Energy, 1000 1455 Pennsylvania Ave., NW., Applicant.
Independence Avenue, SW., Washington, DC 20004–1008. The Commission encourages
Washington, DC 20585–0350 (FAX 202– A final decision will be made on this electronic submission of protests and
586–5860). application after the environmental interventions in lieu of paper using the
FOR FURTHER INFORMATION CONTACT: impacts have been evaluated pursuant ‘‘eFiling’’ link at http://www.ferc.gov.
Steven Mintz (Program Office) 202–586– to the National Environmental Policy Persons unable to file electronically
9506 or Michael Skinker (Program Act of 1969, and a determination is should submit an original and 14 copies
Attorney) 202–586–2793. made by DOE that the proposed action of the protest or intervention to the
SUPPLEMENTARY INFORMATION: Exports of will not adversely impact on the Federal Energy Regulatory Commission,
electricity from the United States to a reliability of the U.S. electric power 888 First Street, NE., Washington, DC
foreign country are regulated and supply system. 20426.
require authorization under section Copies of this application will be This filing is accessible online at
202(e) of the Federal Power Act (FPA) made available, upon request, for public http://www.ferc.gov, using the
(16 U.S.C. 824a(e)). inspection and copying at the address ‘‘eLibrary’’ link and is available for
On August 31, 1999, the Department provided above or by accessing the review in the Commission’s Public
of Energy (DOE) issued Order No. EA– program’s Home Page at http:// Reference Room in Washington, DC.
216 authorizing TEMUS to transmit www.fe.doe.gov/programs/ There is an ‘‘eSubscription’’ link on the
electric energy from the United States to electricityregulation/. Upon reaching the Web site that enables subscribers to
Canada as a power marketer. On August Home page, select ‘‘Pending receive e-mail notification when a
31, 2001, in Order No. EA–216–A, DOE Proceedings.’’ document is added to a subscribed
renewed the TEMUS authorization for a Issued in Washington, DC, on April 7, docket(s). For assistance with any FERC
five-year term that expires on August 2006. Online service, please e-mail
31, 2006. Anthony J. Como, FERCOnlineSupport@ferc.gov, or call
On March 15, 2006, TEMUS filed an (866) 208–3676 (toll free). For TTY, call
Director, Permitting and Siting, Office of
application with DOE for renewal of the Electricity Delivery and Energy Reliability. (202) 502–8659.
export authority contained in Order No. [FR Doc. E6–5504 Filed 4–12–06; 8:45 am] Magalie R. Salas,
EA–216–A for an additional five-year BILLING CODE 6450–01–P Secretary.
term. TEMUS proposes to export [FR Doc. E6–5461 Filed 4–12–06; 8:45 am]
electric energy to Canada and to arrange
BILLING CODE 6717–01–P
for the delivery of those exports over the DEPARTMENT OF ENERGY
international transmission facilities
presently owned by Basin Electric Federal Energy Regulatory DEPARTMENT OF ENERGY
Power Cooperative, Bonneville Power Commission
Administration, Eastern Maine Electric Federal Energy Regulatory
[Docket No. RP99–301–141]
Cooperative, International Transmission Commission
Company, Joint Owners of the Highgate ANR Pipeline Company; Notice of [Docket No. RP96–200–150]
Project, Long Sault, Inc., Maine Electric Negotiated Rate Filing
Power Company, Maine Public Service CenterPoint Energy Gas Transmission
Company, Minnesota Power Inc., April 6, 2006.
Company; Notice of Negotiated Rate
Minnkota Power Cooperative, New York Take notice that on March 30, 2006, Filing
Power Authority, Niagara Mohawk ANR Pipeline Company (ANR) tendered
Power Corporation, Northern States for filing a negotiated rate service April 6, 2006.
Power, Vermont Electric Power agreement between ANR and Anadarko Take notice that on March 31, 2006,
Company, Inc., and Vermont Electric Energy Services Company, effective CenterPoint Energy Gas Transmission
Transmission Company. April 1, 2006. Company (CEGT) tendered for filing and
Any person desiring to intervene or to approval a negotiated rate agreement
Procedural Matters
protest this filing must file in between CEGT and Constellation Energy
Any person desiring to become a accordance with Rules 211 and 214 of Commodities Group, Inc. CEGT has
party to these proceedings or to be heard the Commission’s Rules of Practice and entered into an agreement to provide
by filing comments or protests to this Procedure (18 CFR 385.211 and firm transportation service to this
application should file a petition to 385.214). Protests will be considered by shipper under Rate Schedule FT to be
HSRObinson on PROD1PC61 with NOTICES

intervene, comment or protest at the the Commission in determining the effective April 1, 2006.
address provided above in accordance appropriate action to be taken, but will Any person desiring to intervene or to
with §§ 385.211 or 385.214 of the not serve to make protestants parties to protest this filing must file in
FERC’s Rules of Practice and Procedures the proceeding. Any person wishing to accordance with Rules 211 and 214 of
(18 CFR 385.211, 385.214). Fifteen become a party must file a notice of the Commission’s Rules of Practice and
copies of each petition and protest intervention or motion to intervene, as Procedure (18 CFR 385.211 and

VerDate Aug<31>2005 14:20 Apr 12, 2006 Jkt 208001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\13APN1.SGM 13APN1

S-ar putea să vă placă și