Long - Term

Planning

1. Long Term Planning (LTP)


Provides detailed off-line examination of planning scenarios
simulating
full
production,
purchasing
and
costing
implication.
LTP

provides a method for:


Simulation of future demand
Leveling capacity
Planning costs
Preview for purchasing
Preview for inventory management

1.1

Long Term Planning Process:-

LTP process has FIVE major steps, they are


1. Create scenario
2. Define forecasted Plan in the scenario
3. Run simulated Material Requirement Planning for the
scenario
4. Analyze the result.
5. Transfer the results to Purchasing and
costing
information system
Below is the graphical view of those steps

Planning scenario may contain actual orders and forecasted


demand.
Note: - forecasted demand refers to the PIR. Recollect our
discussion on how to create PIR. These demands may be
created as inactive version

Simulated planned orders are generated as a result of MRP


run for specific scenario.

Results are analyzed and transferred to the information


system.
1.2

Long Term Planning step by step Procedure:-

Note: - Below SAP data (Material code number, plant,


controlling area) are example. You may please use your
data (Material code number, Plant, controlling area, PIR)
from your system.

Create Planning Scenario MS31


Note: - Before proceeding to this, please create a Planned
Independent Requirement of inactive version through Demand
Management. Explained in the PIR creation
Menu Path
Follow the Menu Path: Logistics Production Production
Planning
Long Term Planning Planning Scenario MS31
Create
Double click MS31 Create
1.

Update the following required and optional fields:


Field Name

Description

Values

Planning
Scenario

The scenario that is 920


created to allow you
to
review
your

(you
may
use

Field Name

Description

Values

actual plan with


your forecasted plan
for the year
Planning
Scenario
Description

any
numb
er)

Description of the Scenario for


particular planning
2006
scenario you are
creating

2.

Click Long-term planning

3.

Click Continue

4.

Click matchcode

5.

Update the following required and optional fields:

radio button.

in Opening stock

Field Name

Description

Opening stock

This field allows us 2


to select what we
are
going
to
consider
as
our
opening stock. E.g.
our current plant
stock

6.

Select Consider sales orders

7.

Select Include firm recpts

8.

Select

9.

Select Include firm planned orders


checkbox.

Include

Values

firm
purchase
checkbox.

checkbox.
checkbox.
requisition

10. Click Plnnd indep. reqmts


Note:- You must have already created with some inactive
version of PIR.
11. Click New entry
12. Update the following required and optional fields:
Field Name

Description

Version
number

The version number 03


allows you to create
multiple
planning
versions in parallel.

13. Click Confirm


14. Click Plants
15. Click New entry

Values

Change Long Term Planning Scenario MS32

MENU PATH
Follow the Menu Path: Logistics Production Production
Planning
Long Term Planning Planning Scenario MS32
Change
Double click MS32 Change
1.

Update the following required and optional fields:


Field Name

Description

Values

Planning
Scenario

The scenario that is 920


created to allow you
to
review
your
actual plan with
your forecasted plan
for the year

2.

Click Continue

3.

Click Cancel Release

4.

Click Plants

5.

Click New entry

6.

Update the following required and optional fields:


Field Name

Description

Values

Planning Plant

The planning plant 2000

Field Name

Description

Values

is
the
plant
identified to carry
out the planning
requirements
7.

Click Confirm

8.

Click Release + save

9.

Click Yes

10. Click Immediately

Note: The number of planning file entries that were


created is displayed

Copy Independent Requirements MS64


MENU PATH
Follow the Menu Path: Logistics Production Production
Planning
Long Term Planning Planned indep. reqmts. MS64
Copy version
Double click MS64 Copy Version
1.

Update the following required and optional fields:


Field Name

Description

Values

Plant

A plant is place 1200


where
either
material
is
produced, or goods
and services are
provided. This is the
key that defines that
plant.

Material

Key identifying the 22000068


chosen material.

Source version

The version number 00


that we want to copy
from
Demand
Management.

Target Version

The version number 03


that we want to
create in Demand
Management
for
simulation

Field Name

Description

Values

purposes.
2.

Deselect

No

database

changes

checkbox.
3.

Click Execute

4.

Click Exit

(simulation)

Total Planning Online MS01

MENU PATH
Follow the Menu Path: Logistics Production Production
Planning
Long-Term Planning Long-term planning Planning run
MS01 Online
Double click MS01 Online
1.

Update the following required and optional fields:


Field Name

Description

Values

Planning
Scenario

The scenario that is 920


created to allow you
to
review
your
actual plan with
your forecasted plan
for the year

Plant

A plant is place 1200


where
either
material
is
produced, or goods
and services are
provided. This is the
key that defines that
plant

Scheduling

The indicator refers 2


to all planned orders
that are new or have

Field Name

Description

Values

been changed or
have
been
reexploded for the
BOM.
2.

Click Enter

3.

Click Enter

4.

Click Continue
Note: This screen shows system data indicating the time
taken to carry out the MRP Run and the number of
updates made plus any errors that were encountered

Display Stock Requirements List MS04

SCENARIO
To view the Stock Requirements evaluation of a material
included in Planning Run.
INSTRUCTIONS
Follow the Menu Path: Logistics Production Production
Planning
Long-Term
Planning

Evaluations

MS04
Stock/Reqmts List
Double click MS04 Stock/Reqmts List
1.

Update the following required and optional fields:


Field Name

Description

Values

Planning
Scenario

The scenario that is 920


created to allow you
to
review
your
actual plan with
your forecasted plan
for the year

Plant

A plant is place 1200


where
either
material
is
produced, or goods
and services are
provided. This is the
key that defines that

Field Name

Description

Values

plant
Material

2.

Click Continue

Key identifying the 22000068


chosen material

Set Up Purchasing Info Data from LTP MS70

SCENARIO
Created a Long Term Planning Scenario and it is now ready to
export the data to the Purchasing Information System.
INSTRUCTIONS
Follow the Menu Path: Logistics Production Production
Planning
Long-Term Planning Evaluations Purchasing Info Sys.
MS70 Set up data
Double click MS70 Set up data
1.

Update the following required and optional fields:


Field Name

Description

Planning
Scenario

The scenario that is 920


created to allow you
to
review
your
actual plan with
your forecasted plan
for the year

2.

Click

3.

Deselect Test session

4.

Click Enter

5.

Click Execute

Values

Standard/moving
avg.
radio button

price

checkbox

Long Term Planning Material Analysis MCEC

SCENARIO
Data are exported from the Long Term Planning Scenario to
the Purchasing Information System and it is required to view
the Purchasing data that were exported.
INSTRUCTIONS
Follow the Menu Path: Logistics Production Production
Planning
Long-Term Planning Evaluations Purchasing Info Sys.
MCEC Material
Double click MCEC Material
1.

Update the following required and optional fields:


Field Name

Description

Values

Planning
Scenario

The scenario that is 920


created to allow you
to
review
your
actual plan with
your forecasted plan
for the year

Purch.
Organization

Code that refers to Ensure this


the
companies field is blank
purchasing
organization

Material

Key identifying the Ensure this


chosen material
field is blank

Field Name

Description

Plant

A plant is place Ensure this


where
either field is blank
material
is
produced, or goods
and services are
provided. This is the
key that defines that
plant

Month (from)

Month from which 04.2006


you want
the
analysis carried out

Month (to)

Month from which 12.2006


you want
the
analysis carried out

2.

Click Execute

3.

Click Continue

4.

Highlight the Order value column.

5.

Click Sort Descending

6.

Click Exit

7.

Click No

8.

Click Exit

Values

1.3

Transfer Planned Activity Requirements KSPP

SCENARIO
Created a Long Term Planning Scenario and it is now ready to
export the data to Controlling.
INSTRUCTIONS
Follow the Menu Path: Logistics Production Production
Planning
Long-Term Planning Evaluations Environment
CO activity reqmts KSPP Transfer to cost center
Double click KSPP Transfer to cost center
1.

2.

Update the following required and optional fields:


Field Name

Description

Values

Controlling
area

This code denotes the highest 1200


controlling
code
in
the
company for costing purposes

Click OK
Field Name

Description

Values

Version

The version number in used Select 0 for


for planning in Cost Centre 2004 from the
Accounting.
matchcode list.

Plant

A plant is place where either 1200

Field Name

Description

Values

material is produced, or
goods
and
services
are
provided. This is the key that
defines that plant
Period from

Period signifying the start of 1


the analysis or processing
timeframe

Period To

Period signifying the end of 12


the analysis or processing
timeframe

Fiscal Year

Period, 12 months as a rule. 2006


The fiscal year can be the
same as the calendar year,
but does not have to be

3.

Deselect Test run

4.

Select Cost center/activity type


button

5.

Click Execute

6.

Click Detail List

7.

Click Exit

checkbox

Thats the end of LTP process.Enjoyed it..