HYDRAULIC DESIGN :Step -1

Selection of pipe :Rows of Pipe


Assume Velocity of Pipe =1.4 * VC
(Subjected to maximum of 1.5 m/sec)
Discharge
Area of Pipe Required, A = Q / V
A = / 4 ( D )2
D = Sqrt( A * 4 / )

=
=
=
=
=
=

1
No.
1.4*0.708
0.9912
m/sec
2.832
2.832 / 0.9912
2.8571
m2

=
=

Sqrt( 2.8571 * 4 / 3.14 )


1.9078
m

Provide Diameter of Pipe =

Area provided = 4 ( D )2

=
=

3.14 / 4 * ( 2 )^2
m2
3.14

Velocity in Pipe =

=
=

2.832 / 3.14
0.9019

Actual Velocity >= Canal Velocity

m/sec

Length of Pipe ( L )
L

=
=
=

Width of road
35
35

Provide 2 m Dia. Pipe.


Thickness of Pipe for 2 m Dia. =

0.02

Outer Diameter of Pipe

2.04

<1.5

STRUCTURAL DESIGN :Step - 1 Diameter of Well :-

Provide well Dia. As per guidelines.


Step - 2 Foundation of Well :-

Provide Foundation R.L. of Well


Fn. RL of retaining wall = Fn. RL of Well

=
=

4.032
4.032

=
=
=

37.861
37.861

m
m

m
m

Step - 3 Pipe Invert Level :1

Step - 4

At U/S End = Fn. R.L. + 1.05

=
=

At D/S End = Pipe invert level at U/S end - ( L / 500 )


=
=

37.861 + 1.15
39.011

39.011 - ( 35 / 500 )
38.941
m

Height of Well (HW) :HW = Top of Well - ( Bottom of Fn Level + Th. of fn. Concrete) )
where, Top of Well should be maximum of following,
Top of Well = T.B.L. + 1.2
=
44.008 +1.2
=
45.208
Top of Well = max(G.L., Road EL) + 1.2

Top of Well = max(45.208,43.311)

=
=

42.111 + 1.2
43.311

45.208

HW = Top of Well - ( Bottom of Fn Level + Th. of fn. concrete)


=
45.208 - ( 37.861 + 0.15 )
=
7.197
m
Step - 5 Thickness of Well :Thickness of Well

0.4

PART A FROM WAPCOS


DRAFT ESTIMATE OF PIPELINE CROSSING STRUCTURE AT CH. 14290 MANPURA SUB BRANCH CANAL
Sl. No.

Item of work

S-1

Excavation for foundation in all sorts of soil including yellow


sandy gravelly soils, soft & hard murrum etc. including
depositing the excavated stuff in uniform layers in banks or as
and where directed etc.complete for lead up to 1 km and all
lift. (By Machinary)

Unit

Qty

Rate (Rs.)

Amount
(Rs.)

m3

576.941

74.45

42953.26

m3

288.471

20.65

5956.93

m3

38.826

4623.00

179492.60

m3

171.905

5176.00

889782.35

MT

17.863

53257.80

951344.08

MT
MT
MT
MT

0.00
30.00
0.00
50.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

1.000

148.70

148.70

1.000

4626.75

4626.75

(SOR Item No.S-1(A)(i) (a), Pg No.-8 Yr 2013-2014)


S-2

Backfilling the foundation trenches around the structures etc


with selected excavated stuff including watering, ramming,
compacting etc. complete.
(SOR Item No. S-2, Pg No.-8 Yr 2013-2014)

S-3

Providing and laying plain / reinforced ordinary portland


cement concrete of various grade with cement, sand , and
coarse aggregates including centering, shuttering, batching,
mixing, transporting, placing, vibrating, smooth finishing,
curing etc, complete. (MACHINARY BASED) (INCLUDING
DEWATERING) (B) Raft, Bottom slab of barrel, bottom slab of
sump, approach slab and chute floor slab etc. ( i ) M 15 grade.
(Cement level-270kg)
(SOR Item No. S-5 (B) (i), Pg No.-11 Yr 2013-2014)

S-5

Providing and laying plain / reinforced ordinary portland


cement concrete of various grade with cement, sand , and
coarse aggregates including centering, shuttering, batching,
mixing, transporting, placing, vibrating, smooth finishing,
curing etc, complete. (MACHINARY BASED) (INCLUDING
DEWATERING) (D) Walls of barrels,l breastwall, staunching
rings, pedestals of bearing, stoplog piers, well staining,
transitionwall, etc. (iv) M 30 grade (Cement level-390 kg)
(SOR Item No. S-5 (D) (iv), Pg No.-11 Yr 2013-2014)

S-6

Providing and placing in position reinforcement bars including


cutting, bending, welding joints where necessary, hooking etc.
complete as per drawing for all lead and lifts. (A ) TMT
(SOR Item No. S-11(B), Pg No.-13 Yr 2013-2014)

S-7

Manufaccturing & Supplying the M.S pipe(Fe 410) of various


diameter on site including radiographic testing of welds
providing epoxy coating on inner and outer side of M.S.pipe
with all leads and lifts etc. complete. ( REFER PART B )
FOR CASING
FOR CARING

S-8

S-9

0.025
0.02
0.025

0.02
Providing and fixing marble plate of 2.54 cm thick including
engraving and filling led for letters as directed. (100 cm 2)
100 cm2
(SOR Item No. S-41, Pg No.-18 Yr 2013-2014)
Providing and fixing in position canal data board of standard
size 1.20 m x 0.90 m with M.S. angle 40 mm x 40 mm x 6 mm
with 3 mm thick iron plate fixing in 1:5:10 proportion concrete
block of size 40 cm x 40 cm x 75 cm including painting existing
data on the board etc complete as directed.
(SOR Item No. E-21, Pg No.-6 Yr 2013-2014)

No.

S-13 Providing and fixing post and 38 mm dia pipe railing as per
detailed drawing in three rows including angle iron post of size
80 mm x 50 mm x 10 mm fixed in C.C. block (1:3:6) of size 0.3
m x 0.3 m x 0.3 m etc. as per specifications including 3 coats
of oil painting to steel work and as directed etc. complete.
m

12.000

1559.85

18718.20

m3

130.439

76.10

9926.41

m3

130.44

8.95

1167.43

m2

42.800

341.00

14594.80

m2

75.176

40.70

3059.66

30.00

0.00

0.00

50.00

(SOR Item No. S-29 (a), Pg No.-16 Yr 2013-2014)


S-22 Earthwork in embankment using selected soil, soft and hard
murrum excavated from approved borrow area / village tanks
etc. Including royalty charges, conveying, spreading in uniform
layers, breaking clods and dressing to the designed canal
section etc.with lead up to 1km and all lift. (for canals having
capacity beyond 8.5 cumecs)
(SOR Item No E-11, Pg. No.- 5 Yr 2013-2014)
S-25 Compaction of earthwork in embankment in uniform layers at
optimum moisture content to required dry density including
watering, rolling with suitable type of roller of specified
capacity etc. complete.
(SOR Item No. E-12, Pg No.-5,Yr 2013-2014)
Extra-1 Providing and fixing in position 225 mm WIDE P.V.C. heavy
duty water stops in barrels, troughs and wing walls with 25 mm
wide expansion joint as shown in drawing including filling the
joints with asphalt pad or bitumen cork board of approved
quality.
(SOR Item No. S-36 (a), Pg No.-18 Yr 2013-2014)
Extra-2 Providing and laying 12 mm wide expansion joints with asphalt
filling on canal side slopes and bed at specified intervals as
per drawing.
(SOR Item No. L-16 (a), Pg No.-27 Yr 2013-2014)
Extra-3 Labour charges for fixing the M.S.casing pipes on site of
various diameters by cut & push method including welding the
joints
and
radiographic
testing.The
R.C.C.
thrust
platform,Hydraulic jacks etc complete as directed with all
leads and lifts.( REFER PART B )
(a) 2.4 m DIA (0.02 m Thickness) Casing pipe
Extra-4 Labour charges for fixing the M.S.caring pipes of various
diameters in to casing pipe including welding the joints as per
site condition.radiographic testing with all leads and lifts as
directed etc. completed. ( REFER PART B )
(b)2.0 m DIA (0.02 mThickness) Caring pipe

Deputy Executive Engineer


KBC, Sub Division No. 1/1 C
Radhanpur

0.00
Total=
Add 2% for conti. Charges=
Sub Total=
Add 1% for quality control=
Sub Total=
Add 1% workers welfare cess =
Grand Total =
Say Rs.=

0.00
2121771.16
42435.42
2164206.58
21642.07
2185848.65
21858.49
2207707.14
2207707

Executive Engineer
KBC, Division No. 1/1
Radhanpur

DRAFT QUANTITY OF PIPELINE CROSSING STRUCTURE AT CH. 14290 MANPURA SUB BRANCH CANAL
Sl. No.

Item of work

S-1

Excavation for foundation in all sorts of soil including yellow sandy


gravelly soils, soft & hard murrum etc. including depositing the
excavated stuff in uniform layers in banks or as and where directed
etc.complete for lead up to 1 km and all lift. (By Machinary)

1.1

Lift 0.0 to 1.5 m


a) For well

depth =
Total Depth =
depth =
Total Depth =
depth =
Total Depth =
depth =
Total Depth =
depth =
Total Depth =

b) In between wells :c) Beyond wells:d ) Retaining wall

NOS

( Section E - E ) :-

e) Stoplog(U/S & D/S)


Cutoff

1.5
4.25
1.5
5.937
0
0
1.5
1.5
0.203
0.203

L (m)

B (m)

29.510

D (m)

1.500

1
0
2

20.000
0.500
2.600

2.240
2.540
7.700

1.500
0.250
0.000

4
0
2
2

3.300
0.000
1.000
0.300

2.900
0.000
3.700
3.700

1.500
1.500
0.203
0.543

Total
1.2

Lift 1.5 m to 3.0 m


a) For well

depth =
Balance Depth =
b) In between wells
depth =
Balance Depth =
c) Beyond wells:depth =
Balance Depth =
d ) Retaining wall
( Section E - E ) :depth =
Balance Depth =
1.3

Lift 3.0 m to 4.5 m


0
a) For well
b) In between wells
c) Beyond wells
d ) Retaining wall
( Section E - E ) :-

Balance D=
Balance D=
Balance D=
Balance D=

1.5
2.75
1.5
4.437
0
0
0
0
Total

1.25
2.937
0
0
0

29.510

20.000

2.240

1.500

2.600

7.700

0.000

4
0

3.300
0.000

5.181
0.000

0.000
0.000

2
1
2
4
4

29.510
20.000 2.240
2.600
7.700
3.300
5.181
0.000
0.000

1.250
2.937
0.000
0.000
0.000

Total
Grand total
Quantity for Hard Murrum = Total Quantity - Quantity for Soft Murrum
1
2
3

S-2

Lift 0 to 1.5 m
Lift 1.5 m to 3.0 m
Lift 3.0 m to 4.5 m
Total

215.858
155.730
205.353
576.941

213.150
155.730
163.375
532.255
Grand Total

Backfilling the foundation trenches around the structures etc with


selected excavated stuff including watering, ramming, compacting etc.
complete.
Total

Qty. Page 6 of 13

1.500

=
=
=

2.708
0.000
41.978
44.686

50 % of S-1 Item

Sl. No.
Item of work
NOS
S-3 Providing and laying plain / reinforced ordinary portland cement
concrete of various grade with cement, sand , and coarse aggregates
including centering, shuttering, batching, mixing, transporting, placing,
vibrating, smooth finishing, curing etc, complete. (MACHINARY
BASED) (INCLUDING DEWATERING) (B) Raft, Bottom slab of barrel,
bottom slab of sump, approach slab and chute floor slab etc. ( i ) M 15
grade. (Cement level-270kg)
C.C. (1:2:4) proportion (O.P.C.) M15
(a) Bedding of pipe :(b) Deduction for pipe
(c) Retaining wall (Section E - E) :(d) Mat Concrete beneath R.C.C well

L (m)

B (m)

D (m)

1
1
4
0
2

15.000
15.000
3.300
0.000
Area =

2.240
0.087
2.900
0.000
29.510

0.760
0.150
0.150
0.150

2
2
2
2

7.091
3.700
3.269
26.337

0.400
0.400
0.400

6.797
3.300
-

Total
S-5

Providing and laying plain / reinforced ordinary portland cement


concrete of various grade with cement, sand , and coarse aggregates
including centering, shuttering, batching, mixing, transporting, placing,
vibrating, smooth finishing, curing etc, complete. (MACHINARY
BASED) (INCLUDING DEWATERING) (D) Walls of barrels,l
breastwall, staunching rings, pedestals of bearing, stoplog piers, well
staining, transitionwall, etc. (iv) M 30 grade (Cement level-390 kg)

(a) Well walls


Deduction for opening at CBL
Deduction for pipe
(b) Bottom slab of Well
Total
S-6

Providing and placing in position reinforcement bars including cutting,


bending, welding joints where necessary, hooking etc. complete as per
drawing for all lead and lifts. (A ) TMT
i) SQUARE WELL
ii) RETAINING WALL
iii)Gatebay ,Slab & Cutoff( For U/S & D/S)
iv) HORIZONTAL GRILL
v) SAFETY LADDER
vi) THRUST PLATFORM(Approx.Min.Steel-For U/S &
D/S)
Grand total (Kg)
Grand total (MT)

S-7

S-8

S-9

in Kg
in Kg
in Kg
in Kg
in Kg
in Kg

Manufaccturing & Supplying the M.S pipe(Fe 410) of various diameter


on site including radiographic testing of welds providing epoxy coating
on inner and outer side of M.S.pipe with all leads and lifts etc.
complete.
(a)2.4 m DIA (0.02 m Thickness) CASING PIPE LENGTH - 30
m
(b)2.0 m DIA (0.02 mThickness) CARING
PIPE LENGTH -50 m
Providing and fixing marble plate of 2.54 cm thick including engraving
and filling led for letters as directed. (100 cm2)
Providing and fixing in position canal data board of standard size 1.20
m x 0.90 m with M.S. angle 40 mm x 40 mm x 6 mm with 3 mm thick
iron plate fixing in 1:5:10 proportion concrete block of size 40 cm x 40
cm x 75 cm including painting existing data on the board etc complete
as directed.

Qty. Page 7 of 13

2
2
2
2

6610.36
677.54
1121.15
614.06
304.08

329.55

Sl. No.
Item of work
NOS
S-13 Providing and fixing post and 38 mm dia pipe railing as per detailed
drawing in three rows including angle iron post of size 80 mm x 50 mm
x 10 mm fixed in C.C. block (1:3:6) of size 0.3 m x 0.3 m x 0.3 m etc.
as per specifications including 3 coats of oil painting to steel work and
as directed etc. complete.
4
S-22

S-25

L (m)

B (m)

D (m)

3.00

9.057

3.794

0.949

Earthwork in embankment using selected soil, soft and hard murrum


excavated from approved borrow area / village tanks etc. Including
royalty charges, conveying, spreading in uniform layers, breaking clods
and dressing to the designed canal section etc.with lead up to 1km
and all lift. (for canals having capacity beyond 8.5 cumecs)
U/s and D/s portion around wing walls
Compaction of earthwork in embankment in uniform layers at optimum
moisture content to required dry density including watering, rolling with
suitable type of roller of specified capacity etc. complete.

(For Item No. S-22)


S-5

Providing and laying plain / reinforced ordinary portland cement


concrete of various grade with cement, sand , and coarse aggregates
including centering, shuttering, batching, mixing, transporting, placing,
vibrating, smooth finishing, curing etc, complete. (MACHINARY
BASED) (INCLUDING DEWATERING) (D) Walls of barrels,l
breastwall, staunching rings, pedestals of bearing, stoplog piers, well
staining, transitionwall, etc. (iv) M 30 grade (Cement level-390 kg)

For Retaining wall


U/s of Canal and left
Wall
Bottom
U/s of canal and right
Wall
Bottom
D/s of canal and left
Wall
Bottom
D/s of Canal and right
Wall
Bottom

1
1

3.000
3.000

0.55
3.40

4.167
0.43

1
1

3.000
3.000

0.55
3.40

4.167
0.430

1
1

3.000
3.000

0.55
3.40

4.167
0.430

1
1

3.000
3.000

0.55
3.40

4.167
0.430

1
1
2

1.70
0.30
2.00

3.70
3.70
0.60

0.50
0.84
2.80

1
1
2

1.70
0.30
2.00

3.70
3.70
0.60

0.50
1.00
2.80

Total
For STOPLOG
U/s of Canal
slab
cutoff
grooves
Total
D/s of Canal
slab
cutoff
grooves
Total
Grand Total

Qty. Page 8 of 13

Sl. No.

Item of work

NOS

L (m)

B (m)

D (m)

4
4
2
2

3.70
3.30
3.70
3.70

2
4

7.588
4.30

Extra-1 Providing and fixing in position 225 mm WIDE P.V.C. heavy duty water
stops in barrels, troughs and wing walls with 25 mm wide expansion
joint as shown in drawing including filling the joints with asphalt pad or
bitumen cork board of approved quality.
At junction of Retaining wall and Stoplog portion (U/S and D/S)
At junction of well and Stoplog portion (U/S and D/S)
At junction of R.C.C.Lining and Cut Off portion (U/S and D/S)
At junction of slab and well portion (U/S and D/S)

Total

Extra-2 Providing and laying 12 mm wide expansion joints with asphalt filling
on canal side slopes and bed at specified intervals as per drawing.
Perimeter of the transition portion
Joint with Retaining wall & R.C.C.Lining

Total

Extra-3 Labour charges for fixing the M.S.casing pipes on site of various
diameters by cut & push method including welding the joints and
radiographic testing.The R.C.C. thrust platform,Hydraulic jacks etc
complete as directed with all leads and lifts.
(a)2.4 m DIA (0.02 m Thickness) CASING PIPE LENGTH - 30 m
Extra-4 Labour charges for fixing the M.S. caring pipes of various diameters in
to casing pipe including welding the joints as per site
condition.radiographic testing with all leads and lifts as directed etc.
completed.
(b)2.0 m DIA (0.02 mThickness) CARING PIPE LENGTH -50 m

Deputy Executive Engineer


KBC, Sub Division No. 1/1 F
Radhanpur

Executive Engineer
KBC, Division No. 1/1
Radhanpur

Qty. Page 9 of 13

SING STRUCTURE AT CH. 14290 MANPURA SUB BRANCH CANAL


Total Qty

88.530
67.200
0.000
0.000
57.420
0.000
1.502
1.205
215.858
88.530
67.200
0.000
0.000
0.000
155.730
73.775
131.578
0.000
0.000
0.000
205.353
576.941

576.94

288.471
288.471

Qty. Page 10 of 13

Total Qty

25.536
-1.305
5.742
0.000
8.853
38.826

96.398
-9.768
-2.615
21.070
105.085

13220.73
1355.09
1121.15
1228.12
608.15
329.55
17862.79
17.863

Qty. Page 11 of 13

Total Qty

12.00

130.439

130.439

6.876
4.386
6.876
4.386
6.876
4.386
6.876
4.386
45.048

3.145
0.932
6.720
10.797
3.145
1.110
6.720
10.975
66.820

Qty. Page 12 of 13

Total Qty

14.800
13.200
7.400
7.400
42.800

15.176
17.200
75.176

30.000

50.000

Qty. Page 13 of 13