Project
Cost Estimate
Funding Source
Benefit/Cost
Red bus lane on West Seattle Bridge: Paint existing bus lane red to
more clearly designate the bus lane and potentially reduce violations.
$200,000
TBD
$$
STBD
$200,000
Currently unfunded
TBD by SDOT/SPD
$665,000 - $1 million
depending on final scope (e.g.
$335,000 for the DMS)
$$
TBD
$7 million
State
$$$
$25,000
$300-$500,000
$$
Cost Estimate
Funding Source
Benefit/Cost
$6-7.5 million
Metro
$$$$
$275,000
Currently unfunded
Whitepaper section
NM IM&T I B&MO
Priority
Level
Page
#
12
12
10
21
29
15,
23
29
18
Priority
Level
Page
#
13
13
$$$$
$$
Project
$$
Whitepaper section
NM IM&T I B&MO
12
$1.1 million
Currently unfunded
$$$
13
13
$3.3. million
Levy / grants
$$$
14
$450,000 annually
$$
14
KEY
Acronym
T/NM
IM&T
I
B&MO
=
=
=
=
BENEFIT/COST
= pedestrian/bicycle
= low
= transit
= truck
= medium
= general purpose
= bridge operations
= high
$=
$$ =
$$$ =
$$$$ =
below $100,000
$100,101 to $1M
above $1M to $10M
above $10M
Currently unfunded
$$$
16
$1.92 million
$$$
14
22
22
Priority
Level
Page
#
18
$$$
Feasibility Study: $200,000
Implementation: $4 million
Currently unfunded
$435 -$500,000
$$
Cost Estimate
Funding Source
Benefit/Cost
$600k-$1.3 million
Currently unfunded
N/A
$$$
14
$27 million
Currently unfunded
$$$$
14
15
15,
23
Priority
Level
Page
#
19
15,
24
Project
21
$$$
Whitepaper section
NM IM&T I B&MO
$$$
Requires legislative authority
Currently unfunded
$$$$
$500,000
Currently unfunded
$$
$150 million
$$$$
Cost Estimate*
Funding Source
Benefit/Cost
Currently unfunded
$$
Sound Transit
$$$$
$30 million
TBD
$$$$
24
Project
Work with the Port of Seattle to build a Terminal 18 only lane for
west bound vehicles on the lower Spokane Street roadway. This
27 will eliminate the current situation where trucks are lined up and
stopped blocking general purpose vehicles from traveling west
bound between E. Marginal Way and the Swing Bridge.
All cost estimates are planning-level only and will require additional
refinement. Estimates do not include anticipated annual operations
and maintenance costs.