stream known locally as State Lands Agency Decisions—The BLM from individuals identifying themselves
Creek. The drainage would be Pocatello Field Office Manager, who is as representatives or officials of
reestablished in its original location the responsible official for the EIS and organizations or businesses, are
after mining has been concluded. administers mineral development available for public inspection in their
Preliminary baseline information activities on Federal leases, will entirety.
suggests that some areas within the consider approval of a mine and The BLM is seeking input and written
proposed mine pits may intercept reclamation plan. The final decision comments from Federal, State and local
ground water during mining. A will include consideration of public agencies as well as individuals and
haulroad would be constructed to comments and responses; anticipated organizations who may be interested in,
handle ore and overburden. No public environmental consequences discussed or affected by, the proposed action. To
road closures would occur as a result of in the EIS; and applicable laws, assist the BLM in identifying and
the proposed action. The total mine life regulations, and policies. Decisions may considering issues and concerns related
is expected to span 15 years. P4 include approval of a site-specific Mine to the proposed action, comments for
currently supplies their elemental and Reclamation Plan; issuance of scoping, and later for the Draft EIS,
phosphorous plant with ore from their phosphate lease modifications by the should be as specific as possible.
South Rasmussen Mine about 10 miles BLM, and alternatives. A Section 404 The BLM believes, at this early stage,
northeast of the Blackfoot Bridge Clean Water Act Permit is anticipated to it is important to give reviewers notice
property. be required by the U.S. Army Corps of of several court rulings related to public
Existing haul roads, maintenance, and Engineers (Corps). The Corps would participation in the environmental
administrative facilities would be used render a separate decision related to that review process. First, reviewers of draft
during the mine period. Ore from the permit and how to mitigate the impacts EISs must structure their participation
Blackfoot Bridge Mine would be hauled to affected wetlands and waters of the in the environmental review of the
by truck 8 miles to P4’s processing United States. proposal so that it is meaningful and
facilities near Soda Springs, Idaho. The tentative project schedule is as alerts an agency to reviewer positions
Disturbed lands directly resulting from follows: and contentions. Vermont Yankee
the proposed excavation activities Estimated date for Draft EIS—October, Nuclear Power Corp. v. NRDC, 435 U.S.
would total 764 surface acres of private, 2006. 519,553 (1978). Also, environmental
State, and Federal lands. Reclamation Public Comment Period on Draft objections that could be raised at the
efforts would be concurrent with mining EIS—60 days from when the Notice of draft EIS stage but that are not raised
and would include backfilling most of Availability is published in the Federal until after completion of the final EIS
the proposed open pit areas, regrading Register by the Environmental may be waived or dismissed by the
fill slopes, spreading topsoil, planting of Protection Agency (EPA). courts. City of Angoon v. Hodel, 803 F.
appropriate vegetation, and installation Final EIS—April 2007. 2d 1016, 1022 (9th Cir. 1986) and
and maintenance of runoff and sediment Record of Decision—May 2007. Wisconsin Heritages, Inc. v. Harris, 490
control facilities. Two public scoping meetings will be F. Supp. 1334, 1338 (E.D. Wis. 1980).
Preliminary issues include potential held, each an open house, from 7 p.m.– Because of these court rulings, it is very
effects or concerns related to: Ground 9 p.m. The open houses would include important that those interested in this
water and surface water quantity and displays explaining the project and a proposed action participate by the close
quality, release of naturally occurring forum for commenting on the project. of the 60-day comment period for the
contaminants, recreation, downstream Scoping meetings will be held in the draft EIS so that substantive comments
uses, wildlife and their habitats, Soda Springs City Office Building, Soda and objections are made available to the
livestock grazing, wetlands and riparian Springs, Idaho, and in the BLM Field BLM at a time when it can meaningfully
habitat, socio-economics, and Office, Pocatello, Idaho. Dates for the consider them and respond to them in
development of best management two scoping meetings will be published the final EIS.
practices for mine operations. The in the Caribou County Sun and in the
Idaho State Journal newspapers at least Dated: January 3, 2006.
Blackfoot River is currently listed for
sediment on Idaho’s Impaired Waters 15 days in advance. Alternatively, Philip Damon,
List approved by EPA (Clean Water Act, interested parties may contact the BLM Field Manager, BLM Pocatello Field Office.
Section 303(d) List). The Idaho project lead listed above for specific [FR Doc. E6–1515 Filed 2–2–06; 8:45 am]
Department of Environmental Quality information regarding the public BILLING CODE 4310–GG–P
(IDEQ), the regulatory agency charged meetings.
with protecting the water quality within To be most helpful, you should
the State of Idaho, may consider listing submit formal scoping comments within DEPARTMENT OF THE INTERIOR
this segment of the Blackfoot River for 30 days after the last public meeting.
selenium or other Constituents of The minutes and list of attendees for National Park Service
Potential Concern (COPCs) in the future. each scoping meeting will be available
National Register of Historic Places;
An active bald eagle nest is also known to the public and open for 30 days after
Notification of Pending Nominations
to exist near the project area. the meeting to any participant who
and Related Actions
The EIS will analyze the Proposed wishes to clarify the views he or she
Action, a No Action Alternative, and expressed. Individual respondents may Nominations for the following
other alternatives raised during the request confidentiality. If you wish to properties being considered for listing
scoping process, which may include withhold your name and/or address or related actions in the National
alterations to portions of the proposed from public review or disclosure under Register were received by the National
hsrobinson on PROD1PC70 with NOTICES
mining plan or sequence, and changes the Freedom of Information Act, you Park Service before January 14, 2006.
in design parameters to provide Best must state this prominently at the Pursuant to section 60.13 of 36 CFR part
Management Practices and mitigation to beginning of your written comment. The 60 written comments concerning the
protect resources of concern. Excess BLM will honor such requests to the significance of these properties under
overburden disposal alternatives will extent allowed by law. All submissions the National Register criteria for
also be considered. from organizations or businesses, and evaluation may be forwarded by United
VerDate Aug<31>2005 15:00 Feb 02, 2006 Jkt 208001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\03FEN1.SGM 03FEN1
Federal Register / Vol. 71, No. 23 / Friday, February 3, 2006 / Notices 5879
Fifth Avenue Historic District, 100–500 Blks Selma Rosenwald School, Selma—Collins
of E. Fifth Ave., Kenbridge, 06000066 Rd., approx. 0.25 mi. S of US 278, Selma, McJunkin, William, House, 151 Sheridan Rd.,
06000069 Winnetka, 06000104
Richmond Independent City
Virginia Can Company—S.H. Heironimus Faulkner County Sangamon County
Warehouse, 315 Albemarle SE, Roanoke Crownover—Brown, Earl and Oza, House, Ross, Joseph, House, 5200 Passfield Rd.,
(Independent City), 06000067 133 S. Broadway, Damascus, 06000088 Rochester, 06000092
VerDate Aug<31>2005 15:00 Feb 02, 2006 Jkt 208001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\03FEN1.SGM 03FEN1