1. A tender for an HVAC upgrade for the NSLCs Head Office and
Distribution Centre.
A mandatory site meeting will be conducted on Tuesday, August 5, 2014 at
10:00AM at the NSLCs Head Office, 93 Chain Lake Drive, Bayers Lake
Industrial Park.
2. The NSLC Policy is to ensure that all firms interested in becoming
government suppliers shall be given equitable access to contract
opportunities, except that consideration may be shown to Atlantic Provinces
suppliers, manufacturers and contractors whenever practical and
economically feasible to do so, consistent with The Atlantic Procurement
Agreement.
3. Tenders must be delivered to the Nova Scotia Liquor Corporation, prior to
the tender closing. Please indicate the NSLC Reference Number on your
document and/or envelope.
Mailing/Courier:
Address:
18.The NSLC reserves the right to contact bidders for the purpose of clarifying
information included in the proposal prior to making a final decision or
recommendation.
19.The successful Bidder shall enter into an agreement using N.S.L.C. Work
Order or C.C.D.C. Document 2. Within four (4) days of the opening of the
tender to be supplied by the Bidder unless otherwise agreed upon. The
security deposit herein called for shall be forfeited should the Contractor fail
to sign the contract within fifteen (15) days.
20.If work is either directly or indirectly delayed or stopped for a period which in
the opinion of the NSLC, acting reasonably, is likely to continue so as to
substantially prevent, hinder or delay the timely completion of the contract
and such delay or stoppage is caused;
a. by fire, flood, elements of nature or acts of God;
b. by acts of war, terrorism, riots, civil disorders or reasonable apprehension of
such;
c. by labour disputes, strikes, or lock outs;
d. under an order of any court, or other public authority, through no act or
fault of the contractor or anyone employed by him/her; or
e. by other similar cause beyond the reasonable control of either party (but not
including financial difficulties or insolvency;
and such delay could not have been prevented by reasonable precautions
and could not be circumvented by the non-performing party through the use
of alternate sources, work around plans or other means, either party may,
upon providing three days notice to the other, terminate the contract. In
such case, the contractor may recover from the Corporation payment for all
work executed and reasonable profit for that work.
21.The Bidder shall include in his
shall act as sub-contractors for
subject to the approval of the
contractors after the signing
received from the NSLC.
.2
Before work on the project commences, the contracted party must have
had the sponsoring occupational health and safety organization submit a
Letter of Good Standing to the NSLC Representative.
6
.3
.4
Provide coordination with the NSLC to ensure safety for NSLC employees
and customers.
32.The Contractor will not be allowed to begin work on this site until advised by
the NSLC.
33.Vendors must submit proof, prior to contract award, of their Certificate
of Recognition issued jointly by the Nova Scotia Construction Safety
Association and the Province of Nova Scotia Department of Labour, or a valid
Letter of Good Standing from an occupational health and safety organization
approved by Nova Scotia Transportation and Public Works indicating the
Contractor is in the process of qualifying for the Certificate of Recognition.
Failure to supply this certificate will result in automatic disqualification of the
tender submission.
34.The NSLC reserves the right to ensure the work is being completed to its
standards as provided in the documents.
35.The NSLC reserves the right not to award to any bidder based on past
performance with the NSLC.
36.Contractors are to provide a written warranty on all materials and
workmanship for a minimum one (1) year period from the date of contract
completion.
37.Bid Evaluation Criteria
Compliance with the Bid Documents
Pass/Fail
Price
80%
Schedule
20%
Total
100%
The undersigned Bidder agrees to provide all necessary labour, permits (if
required), equipment, tools, travel, shop drawings, site supervision, incidentals and
other means of cleaning, and any deficiency related work associated with the timely
completion of this project as specified in accordance with the Contract and agrees
to accept, therefore as payment in full, the Contract Price for the NSLCs Head
Office and Distribution Centre.
The undersigned Bidder is not obligated to bid for all four (4) of the works, with this
tender and all submissions will be considered. The NSLC will award to the best
scoring bid for each of the four (4) works for pricing and schedule.
The Bidder agrees, within four (4) days of notification of acceptance, to enter into a
Contract between the NSLC and Contractor, and provide the contract security as
specified.
(As per Specifications) in Canadian funds, excluding H.S.T.
1. Rooftop Equipment Removals
Cost
$_________
Note: this work will need to be coordinated with the roofing contractor for
removals. This work is anticipated to start late August and acceptance of the
schedule proposed by the roofing contractor will be a condition for award of this
work.
Exclusions, if any, from the work to be completed by others and not part of this
work: _____________________________________________________
$_________
Proposed duration for the work including lead time orders, shop drawing
reviews, fabrication, shipping and installation. __________ days from award.
Proposed duration on site for the installation work. ________ days on site.
Exclusions if any from the work to be completed by others and not part of this
work: _____________________________________________________
$_________
Proposed duration for the work including lead time orders, shop drawing
reviews, fabrication, shipping and installation. __________ days from award.
Proposed duration on site for the installation work. ________ days on site.
Exclusions if any from the work to be completed by others and not part of this
work: _____________________________________________________
$_________
Proposed duration for the work including lead time orders, shop drawing
reviews, fabrication, shipping and installation. __________ days from award.
Proposed duration on site for the installation work. ________ days on site.
Exclusions if any from the work to be completed by others and not part of this
work: _____________________________________________________
The Bidder hereby agrees to be bound by the award of the Contract and if
awarded the Contract on this Bid to execute the required Contract
commencing on the stipulated date.
4.
DATED
10
NUMBER OF PAGES
The Bidder has listed the Sub-contractors they will use for trades, reserving the
right to substitute should any sub-contractor withdraw his Tender or become
bankrupt; substitutions are subject to the NSLCs approval.
Sub-Contractor
Trade
Price
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
___________________________________________________________________
The Bidder recognizes the NSLC's right to accept any Tender, or to reject any or all
Tenders, also the NSLC's right to substitute any Sub-contractor after adjusting the
contract price with the Contractor.
The undersigned Bidder declares that this Bid is made without connection with any
other person(s) submitting Bids for the same work and is in all respects fair and
without collusion or fraud.
Dated this
day of
, 2014
Bidders Name
(please print)
Bidders Signature
Company
Address
Telephone Number
Fax Number
Email ____________________________
11
MESSAGE:
With reference to the above mentioned project, please adjust our sealed tender as
follows:
INCREASE BY:
OR
DECREASE BY:
12
E01
22
23
26
27
2601
G
2610
2608
E02