Documente Academic
Documente Profesional
Documente Cultură
General Introduction
Technical Design
Maintenance plans provide details on the scheduling of regularly recurring maintenance services. Framework orders are set up for the period for
which you commission a supplier to carry out maintenance work. On this basis, one can directly generate service entry sheets in accordance with
the dates set out in the maintenance plan and streamline the procurement process by eliminating a number of otherwise necessary steps. (These
steps are: generation of a maintenance order from the maintenance plan, creation of a requisition referencing the maintenance order, and
conversion of the requisition into a purchase order.) The service provider obtains all the necessary information first hand. At the same time, the
data maintenance effort will be reduced to a minimum.
Create PM order via transaction IW31 (order type PM03)
Assign a framework order to this PM order
After releasing the order a service purchase requisition is created via function module ME_REQUISITION_EXT; the framework order will
be automatically entered in requisition item as source of supply
Create service entry sheet directly from purchase requisition via transaction ME58
Release strategy is setup in customizing (transaction ML60) and similar to purchase requisitions in MM-PUR
Breakpoint in program LMLSRF3L:
Call function ME_REL_STRATEGIE_ESSR'
Release information is stored in:
ESSR-FRGGR - release group
ESSR-FRGSX - release strategy
ESSR-FRGZU - release status
ESSR-FRGKL - release indicator
ESSR-FRGRL - release not yet completely effected