The work shall be executed in accordance with the following State of Qatar Standard
Publications, Specifications, Regulations, Notices and Circulars current at the date of
tender unless otherwise stated.
(a)
(b)
The Code of Practice and Specification for Trench Works/Road Openings in the
Highway prepared by the Ministry of Industry and Public Works, January 1992.
(c)
The Guide for Civil Users of Explosives in Qatar prepared by the Ministry of
Public Works.
(d)
All current Public Works Authority regulations up to the date of the signing of the
contract concerning the organization of Tender and Public Auctions and all
subsequent revisions and amendments.
(e)
The Qatar Survey Manual, prepared by the Urban Planning and Development
Authority (UPDA).
(f)
The Qatar Traffic Manual (QTM) and Qatar Highway Design Manual (QHDM)
prepared by the Ministry of Public Works.
(g)
(h)
Any current and relevant regulation, notice or circular issued by the Public Works
Authority (including the previous Ministry of Municipal Affairs and Agriculture,
Ministry of Public Works and Ministry of Industry and Public Works), the Qatar
General Electricity and Water Corporation (QGEWC), (including the previous
Ministry of Electricity and Water), Qatar Telecom (Q-Tel), the Qatar General
Organization for Standards and Metrology, the Supreme Council for the
Environment and Natural Reserves or the appropriate local Municipality prior to
the date of the letter or advertisement inviting Tenderer.
(i)
(j)
State of Qatar Law No. (6) Of the year 1987 and all subsequent amendments
concerning Materials and Equipment from Qatar or other CCASG countries,
obtainable from Government House, Doha.
(k)
(l)
(m)
(n)
Traffic Control at Road works published by the Ministry of Industry and Public
Works and any other rules and regulations issued by Roads Department.
(o)
State of Qatar Law No (30) of the year 2002 and all subsequent amendments
concerning Protection of the Environment, obtainable from Ministry of Justice.
IA 12/13 C 057 ST
C1/GS/1
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A
February 2013
TECHNICAL SUBMISSION
SECTION C PART 1
GENERAL SPECIFICATION
(p)
All current Water Department and Electricity Department of the Qatar General
Electricity and Water Corporation (QGEWC) specifications and all subsequent
revisions and amendments.
(q)
The Regulations for the Installation of Electrical Wiring, Equipment and Air
Conditioning of Residential and Commercial Buildings, fifth re-issue dated June
1986 prepared by the Ministry of Electricity and Water, P.O. Box 41, Doha.
(r)
Any Amiri Decree or current and relevant regulation, notice or circular issued by
the Ministry of Municipal Affairs and Agriculture (including the previous Ministry
of Public Works and the previous Ministry of Industry and Public Works), the
Ministry of Electricity and Water or the appropriate local Municipality prior to the
date of the newspaper advertisement to Tender.
(s)
State of Qatar Law No. 32 of the year 2005 and all subsequent amendments
concerning protection of environment, and all associated rules and regulations
issued by the Supreme Council for the Environment and Natural Resources,
obtainable from Ministry of Justice, Doha, Qatar
(t)
State of Qatar Law No. 32 of the year 2002 and all subsequent amendments
concerning Traffic in the State of Qatar, obtainable from Ministry of Justice,
Doha, Qatar.
(u)
(v)
The Contractor shall be deemed to have his own copy of the Public Works Authority
specifications, regulations, notices, and circulars given as (a) to (v) above.
In the case of any ambiguity or discrepancy, the provisions of the Project Specification
shall prevail over the provisions of the Public Works Authority published specifications.
2.
GENERAL SPECIFICATIONS
All design work shall be based on the design standards and specifications of
Infrastructure Affairs as set out in the Qatar Highway Design Manual, the Qatar Traffic
Manual, the Qatar Construction Specification, Drainage Affairs (DA) standards and all
other standards, specifications and guides necessary to define the Consultants
proposal. Where work is to be carried out for other authorities for inclusion in the
Project, the standards and specifications of that authority shall be taken into account.
All Construction work shall be carried out in accordance with Qatar Construction
Specifications (QCS-2010)
3.
IA 12/13 C 057 ST
C1/GS/2
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A
February 2013
TECHNICAL SUBMISSION
SECTION C PART 1
4.
GENERAL SPECIFICATION
The Contractor shall consult the Survey Unit of the Ministry of Municipal Affairs
and Agriculture prior to any earth or other works to determine if the work is likely
to disturb survey marks. If Survey Unit require a survey mark to be moved the
contractor will be responsible for recreating the survey mark to an approved
design and specification and for resurveying the point using survey companies
approved by the Survey Unit.
The Contractor shall be responsible for the protection of the Survey marks within
the boundaries of the site for the duration of the contract period and shall be
liable for all costs of any remedial work required by the Survey Unit
On the practical completion of the Works the Survey Unit will issue a certificate
stating that all survey marks whether disturbed or otherwise by the contractor
have been reinstated or protected to the satisfaction of the Survey Unit.
In the event of failure to comply with the requirements of this Clause
Employer without prejudice to any other method of recovery may deduct
costs of any remedial work after the practical completion date, carried out by
Survey Section form any monies in its hands due or which become due to
contractor.
the
the
the
the
The Contractor shall maintain all pipes, cables and other apparatus during the
progress of the Works.
(c)
The contractor shall maintain traffic flow and access to properties including the
construction, maintenance and subsequent removal of temporary road and
footpath diversions as required, temporary traffic signs, kerbs, road markings,
lighting etc., all to the satisfaction of the Engineer and in accordance with QCS
01-16.
(d)
The Contractor shall comply with the provision of samples and testing of materials
in accordance with QCS 1-9.3 and as directed by the Engineer
(e)
The Contractor shall erect name board in accordance with QCS 1-12.3
(f)
The Contractor is reminded of the importance of safety and that he has sole
responsibility to provide all safety facilities at site, shipping and handling.
(g)
The Contractor shall request a work permit at least three (3) days in advance
before starting work.
(h)
The Contract Programme includes preparing the design of the temporary works
and securing approval for the design from the Employer prior to construction
commencement. Primavera version 6 shall be used for producing the
programme.
(i)
The contractor shall arrange to obtain following Clearance Certificates from the
appropriate authorities upon completion of the works:
(1)
IA 12/13 C 057 ST
C1/GS/3
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A
February 2013
TECHNICAL SUBMISSION
SECTION C PART 1
(j)
GENERAL SPECIFICATION
(2)
(3)
Digital Camera
Approved type of digital camera (4 No) for the use of Engineers
Representative for the duration of the contract. The camera shall be
returned to the contractor at the end of the construction period. The
contractor shall be responsible for maintenance of the equipment by the
manufactures agent throughout the supply period. Batteries and all other
necessary consumable items shall be provided by the contractor during
the said period.
(k)
(l)
(m)
IA 12/13 C 057 ST
C1/GS/4
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A
February 2013
TECHNICAL SUBMISSION
SECTION C PART 1
GENERAL SPECIFICATION
from the concerned Utilities and Service Providers regarding their requirements
and lists of approved contractors and suppliers at the Tender stage.
IA 12/13 C 057 ST
C1/GS/5
Construction and Upgrade of Rayyan Road
Project 7: Contract 1
West of New Rayyan R/A to East of Bani Hajer R/A
February 2013