Sunteți pe pagina 1din 2

Federal Register / Vol. 70, No.

213 / Friday, November 4, 2005 / Notices 67165

TABLE.—ESTIMATED BURDEN TO PARTICIPANTS—Continued


Number of
Number of participants Average length
Office Topics to include focus groups per focus of focus group
group

(1) (2) (3) (4) (5)


Office of Air and Radiation.
Office of Radiation and Indoor Air ................. Environmental management of asthma; In- 6 20 4
door air quality management in schools
and large buildings, etc.
Office of Transportation and Air Quality ........ Encouraging fuel efficiency through labeling 4 9 2
(Smartway brand), etc.
Office of Water ............................................... Invasive species prevention; Great Lakes, 60 9 3
etc.

Total ................................................. ........................................................................ 188 *1758 **2.4


*Total needed for all focus groups [sum[col (3)*(4)]].
**Average time for all focus groups [cols. (3)*(5)/188].

Burden means the total time, effort, or statements (EISs) was published in FR Permit, NPDES, Eddy, De Baca,
financial resources expended by persons dated April 1, 2005 (70 FR 16815). Chaves, and Guadelupe Counties,
to generate, maintain, retain, or disclose NM.
Draft EISs
or provide information to or for a Summary: EPA had no objection to
Federal agency. This includes the time EIS No. 20050220, ERP No. D–FHW– the selection of the preferred action.
needed to review instructions; develop, L40227–WA, Interstate 90 Snoqualmie Rating LO.
acquire, install, and utilize technology Pass East Project, Proposes to Improve
and systems for the purposes of a 15-mile Portion of I–90 from Final EISs
collecting, validating, and verifying Milepost 55.10 in Hyak to Milepost EIS No. 20050344, ERP No. F–NRC–
information, processing and 70.3 New Easton, Funding, U.S. Army F06025–WI, Generic—License
maintaining information, and disclosing COE Section 404 Permit and NPDES Renewal for Point Beach Nuclear
and providing information; adjust the Permit, Kittitas County, WA. Plant, Units 1 and 2, Supplement 23
existing ways to comply with any Summary: EPA has environmental to NUREG–1437 (TAC Nos. MC2049
previously applicable instructions and objections about the proposed project and MC2050), Lake Michigan,
requirements; train personnel to be able primarily related to the adequacy of the Manitowoc County, WI.
to respond to a collection of ecological connectivity options Summary: EPA continues to express
information; search data sources; presented. EPA notes that no preferred concerns about the adequacy and clarity
complete and review the collection of alternative was selected and the most of the radiological impact assessments
information; and transmit or otherwise substantial environmental issues relate and risk estimates.
disclose the information. to the No Action Alternative and
Ecological Connectivity Improvement EIS No. 20050373, ERP No. F–COE–
Dated: September 26, 2005. H39012–MO, Howard Bend
Package C.
Al McGartland, Rating EO2. Floodplain Area Study, Improvements
Office Director, National Center for EIS No. 20050354, ERP No. D–UAF– for Future Land, Future Road, and
Environmental Economics, Office of Policy,
E11057–00, Shaw Air Base Airspace Stormwater Management, Missouri
Economics and Innovation. River Flood Developments, U.S. Army
Training Initiative (ATI), 20th Fighter
[FR Doc. 05–22035 Filed 11–3–05; 8:45 am]
Wing Proposal to Modify the Training COE Section 10 and 404 Permits, St.
BILLING CODE 6560–50–P
Airspace Overlying Parts, South Louis County, MO.
Carolina and Georgia Summary: EPA continued to express
Summary: EPA expressed concern concerns about the cumulative effects
ENVIRONMENTAL PROTECTION analysis, including uncertainty over the
AGENCY about airspace management/
configuration/access around existing potential for development within the
[ER–FRL–6669–1] civilian airports in Georgia and ongoing levee-protected area and the reliance on
coordination with the public regarding potentially outdated FEMA profiles that
Environmental Impact Statements and noise issues. Mitigation of some of the may underestimate impacts.
Regulations; Availability of EPA specific impacts can be accomplished EIS No. 20050376, ERP No. F–COE–
Comments via structuring the various training G32057–TX, CedarBayou Navigation
Availability of EPA comments scenarios and modifying the proposed Chanel (CBNC) Improvement Project,
prepared pursuant to the Environmental airspace to further avoid/minimize Implementation, Near Baytown in
Review Process (ERP), under section impacts around civilian airports. Harris and Chambers Counties, TX.
309 of the Clean Air Act and section Rating EC1. Summary: No comment letter was
102(2)(c) of the National Environmental EIS No. 20050368, ERP No. D–IBR– sent to the preparing agency.
Policy Act as amended. Requests for G28013–NM, Carlsbad Project Water EIS No. 20050419, ERP No. F–AFS–
copies of EPA comments can be directed Operations and Water Supply J65441–MT, Middle East Fork
to the Office of Federal Activities at Conservation, Changes in Carlsbad Hazardous Fuel Reduction Project,
202–564–7167. Project Operations and Implementation of Three Alternatives,
An explanation of the ratings assigned Implementation of Water Acquisition Bitterroot National Forest, Sula
to draft environmental impact Program, U.S. COE Section 404 Ranger District, Ravalli County, MT.

VerDate Aug<31>2005 22:35 Nov 03, 2005 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\04NON1.SGM 04NON1
67166 Federal Register / Vol. 70, No. 213 / Friday, November 4, 2005 / Notices

Summary: EPA continues to express 2005, Contact: Ana Egnew 208–634– ENVIRONMENTAL PROTECTION
concerns about potential impacts to 0624. AGENCY
water quality. EPA stressed the EIS No. 20050454, Final EIS, FRC, 00,
importance of designing and Cove Point Expansion Project, [FRL–7994–2]
implementing fuels reduction Construction and Operation of a
treatments and road access in a manner Liquefied Natural Gas (LNG) Import Underground Injection Control
that minimizes impacts. EPA also Terminal Expansion and Natural Gas Program; Hazardous Waste Injection
recommended modification of Pipeline Facilities, US. Army COE Restrictions; Petition for Exemption—
mitigation measures to further assure Section 404 Permit, Docket Nos. Class I Hazardous Waste Injection;
protection for large old growth CPO5–130–000, CP05–131–000 and Lyondell Chemical Company
Ponderosa pine trees. CP05–132–00, PA, VA, WV, NY and
Dated: November 1, 2005. MD, Wait Period Ends: December 21, AGENCY: Environmental Protection
Ken Mittelholtz, 2005, Contact: Thomas Russo 1–866– Agency.
Environmental Protection Specialist, Office 208–3372.
EIS No. 20050455, Final EIS, AFS, IN, ACTION: Notice of Final Decision on No
of Federal Activities.
German Ridge Restoration Project, To Migration Petition Reissuance.
[FR Doc. 05–22041 Filed 11–3–05; 8:45 am]
BILLING CODE 6560–50–P Restore Native Hardwood
Communities, Implementation, SUMMARY: Notice is hereby given that an
Hoosier National Forest, Tell City exemption to the land disposal
ENVIRONMENTAL PROTECTION Ranger District, Perry County, IN, restrictions under the 1984 Hazardous
AGENCY Wait Period Ends: December 5, 2005, and Solid Waste Amendments to the
Contact: Ron Ellis 812–275–5987. Resource Conservation and Recovery
[ER–FRL–6668–09]
EIS No. 20050456, Final EIS, FHW, 00, Act has been granted to Lyondell
Environmental Impacts Statements; US 24 Transportation Improvements Industries, Inc. (Lyondell) for two Class
Notice of Availability Project, I–469 in New Haven, Indiana I injection wells located at
to Ohio Route15 in Defiance, Channelview, Texas. As required by 40
Responsible Agency: Office of Federal Funding, NPDES Permit and U.S. CFR Part 148, the company has
Activities, General Information (202) Army COE Section 404 Permit adequately demonstrated to the
564–7167 or http://www.epa.gov/ Issuance, Westenmost and Allen satisfaction of the Environmental
compliance/nepa/. Counties, IN and Paulding and Protection Agency by the petition and
Weekly receipt of Environmental Impact Defiance Counties, OH, Wait Period supporting documentation that, to a
Statements Ends: December 5, 2005, Contact: reasonable degree of certainty, there will
Filed October 24, 2005 Through October Mark Vonder Embse 614–280–6854. be no migration of hazardous
28, 2005 constituents from the injection zone for
Pursuant to 40 CFR 1506.9. Amended Notices
as long as the waste remains hazardous.
EIS No. 20050450, Draft EIS, SFW, IL, EIS No. 20050437, Final EIS, AFS, NM, This final decision allows the continued
Crab Orchard National Wildlife Tajique Watershed Restoration underground injection by Lyondell, of
Refuge Comprehensive Conservation Project, Proposes Fuel Reduction and the specific restricted hazardous wastes
Plan (CCP), Implementation, Restore Forest Health, Cibola National identified in the exemption, into Class
Williamson, Jackson and Unicon Forest, Torrance County, NM, Wait
Counties, IL, Comment Period Ends: I hazardous waste injection wells
Period Ends: November 21, 2005, WDW–148 and WDW–162, until
January 17, 2006, Contact: Dan Frisk Contact: Vicky Estrada 505–847–2990.
618–997–3344. December 31, 2020, unless EPA moves
EIS No. 20050451, Final EIS, AFS, WA, Revision of FR Notice Published to terminate the exemption under
Fish Passage and Aquatic Habitat October 21, 2005: Correction to Title provisions of 40 CFR 148.24. Additional
Restoration at Hemlock Dam, and Contact Person Name. conditions included in this final
Implementation, Gifford Pinchot EIS No. 20050446, Draft EIS, USN, 00, decision may be reviewed by contacting
National Forest, Mount Adams Undersea Warfare Training Range the Region 6 Ground Water/UIC Section.
District, Skamaria County, WA, Wait (USWTR), Installation and Operation, As required by 40 CFR 148.22(b) and
Period Ends: December 5, 2005, Preferred Site (in the Cherry Point 124.10, a public notice was issued
Contact: Benet Coffin 509–395–3425. Operating Area) and the Alternate August 18, 2005. The public comment
EIS No. 20050452, Draft EIS, BLM, NM, Sites (within the Virginia Capes and period closed on October 3, 2005. No
Kasha-Katuwe Tent Rocks National Jacksonville Operating Areas), NC, VA comments were received. This decision
Monument Resource Management and FL, Comment Period Ends: constitutes final Agency action.
Plan, Implementation, Rio Puerco December 28, 2005, Contact: Keith
Field Office, Sandoval County, NM, Jenkins 757–322–4046. DATES:This action is effective as of
Comment Period Ends: February 2, October 28, 2005.
Revision of FR Notice Published on
2006, Contact: John Bristol 505–761– October 28, 2005: Comment Period ADDRESSES: Copies of the petition and
8755. Extended from December 12, 2005 to all pertinent information relating thereto
EIS No. 20050453, Draft EIS, AFS, ID, are on file at the following location:
December 28, 2005.
South Fork Salmon River Subbasin Environmental Protection Agency,
Noxious and Invasive Weed Dated: November 1, 2005.
Region 6, Water Quality Protection
Management Program, Ken Mittelholtz,
Division, Source Water Protection
Implementation, Krassel and McCall Environmental Protection Specialist, NEPA
Branch (6WQ-S), 1445 Ross Avenue,
Ranger Districts, Payette National Compliance Division, Office of Federal
Activities. Dallas, Texas 75202–2733.
Forest and Cascade Ranger District,
Valley and Idaho Counties, ID, [FR Doc. 05–22040 Filed 11–3–05; 8:45 am] FOR FURTHER INFORMATION CONTACT:
Comment Period Ends: December 20, BILLING CODE 6560–50–P Philip Dellinger, Chief Ground Water/

VerDate Aug<31>2005 22:35 Nov 03, 2005 Jkt 208001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\04NON1.SGM 04NON1

S-ar putea să vă placă și