Trainees name: Rodrigo DE MELLO


Coursing: 2nd year deck
Ships name: Catalina
Period on board: from 15/07 to 19/07 Total days: 4
Name of ships Master: Federico Alpun

Name of ships Chief Engineer: Rben Cparo

SHIPS PARTICULAR AND GENERAL DATA

Ships name: Catalina


License number: 392
Ship Length: 19,10 mts.
Width: 9,5 mts.
Draft: 2,2 mts.
GRT: 80
Call sign: CXMY
Year of construction: 1981
Shipyard: Van Mill Scheepswerf & Machinefabrieck BV (Holland)

Page 1 of 8

APM 2 Rodrigo DE MELLO

R/E CATALINA

FROM 15/07 TO 19/07

PROPULSION SYSTEM AND GOVERNMENT

2 Propeller, 4 rudder, diameter 1,20 mts., with fixed nozzles.


2 Forward rudder, 4 reverse rudder

MAIN ENGINES

2 Caterpillar Engines 3508, 1050 hp each one


2 Gearbox Reintjess 550 B red 6:1

AUXILIARY ENGINES

1 Alternator Leroy Sommer 27 KVA with Isuzu


1 Alternator Marelli 30 Kva with Mitsubishi

MOORING WINCHES

2 Winches Nabrico type, hydraulic with 32mm cable.

BRIDGE AND COMMUNICATION EQUIPMENTS

RADIO Radar Holland rhrs2002 sr River Radar


Koden Radar MDC 741
2 Sailor VHF
Samyung GPS
Furuno AIS
Furuno Echo Sounder

Page 2 of 8

APM 2 Rodrigo DE MELLO

R/E CATALINA

FROM 15/07 TO 19/07

SODENA Digital Navigation System


Autopilot Radio Holland Delta 550
Tecnimar Fire Detection System

CREW LIST

Ship Master: Federico Alpun


Second Officer: Carlos Moranzoni
Chief Engineer: Rben Cparo
Second Engineer: Luis Techera
Ordinary Seaman: Marcos Marichal
Ordinary Seaman: Marcelo Casco
Deck Cadet: Rodrigo de Mello

DAY BY DAY REPORT

DAY ONE:

I reached the ship at 07:00 a.m. and I introduced myself to all the ships crew. Then I helped
with the provisioning tasks being carried out for the course of the week. Later one of the
seamen showed me the ship and the second officer showed me the cabin so I could sort my
things. During the course of the day I became aware with the particularities of the vessel and
keep the watch with the Captain down to the port of Nueva Palmira. We arrived around 16:00
p.m. to Nueva Palmiras were we took the empty barge and return to UPM, at that moment I
went to sleep.

Page 3 of 8

APM 2 Rodrigo DE MELLO

R/E CATALINA

FROM 15/07 TO 19/07

DAY TWO:

I woke up around 24:00 back in the port of UPM and lend a hand with the mooring maneuver
because the plant was delayed so we had to stay at the port for that night. We set sail back to
Nueva Palmira at 08:00 with the loaded barge were I took the watch with the Captain, during the
navigation the Captain teach me a sort of things like the leading lines of the river, the passages (
Paso Barrizales, Paso Marquez), and some recommendations for the river navigation. On
that watch I had the opportunity to steer the ship with the Captain looking after me. We arrived
to Nueva Palmiras port around 15:45 p.m. were we leave the loaded barge and took the empty
one, while the Captain was maneuvering I just watch him doing it and evacuate doubts when I
had it. Then I got to sleep.

DAY THREE:

I woke up around 01:00 a.m. back in the port of UPM were we leave the empty barge and
took the loaded one back to Nueva Palmira. On this watch I ask the chief Engineer if he can
show me the engine room, he took me down to the engine room and explained me all the
particularities of the ships main engines, start system, cooling system, turbo, generators, fuel
tanks, water tanks and their distribution around the ship. After that I return to the bridge and had
the opportunity to steer the ship in night navigation. I had the chance to put into practice my
knowledges about the IALA buoyage system at night in real life, and to watch crosses with
other ships at night too. We arrived to Nueva Palmiras port at 07:00

Page 4 of 8

APM 2 Rodrigo DE MELLO

R/E CATALINA

FROM 15/07 TO 19/07

DAY FOUR:

On the last day I woke up for lunch, and after that I got to finish the task that the captain
recommended me, I checked all the ship's safety equipment , fire extinguishers , life rafts , life
jackets , flares and escape masks to verify that they were not overdue or in bad conditions. We
arrived to the port of UPM around 17:00 p.m. because we returned with some headwind, and
the ship with the empty barge is less maneuverable on bad weather conditions. We set sail
again around 19:00 back to Nueva Palmira with a loaded barge and reached port at 03:00 a.m.
We return to Fray Bentos with an empty barge, by the time I went to sleep. I woke up at the port
of UPM and I got to pick up my things, after that I handed the form of the safety equipment that I
had done to the Captain before I leave the ship.

Page 5 of 8

APM 2 Rodrigo DE MELLO

R/E CATALINA

FROM 15/07 TO 19/07

PHOTO DOCUMENTATION OF THE SHIP

EMPTY BARGE AT THE PORT OF NUEVA PALMIRA

Page 6 of 8

APM 2 Rodrigo DE MELLO

R/E CATALINA

STERN DECK

FROM 15/07 TO 19/07

BRIDGE DECK

ENGINE ROOM

Page 7 of 8

APM 2 Rodrigo DE MELLO

R/E CATALINA

FROM 15/07 TO 19/07

BRIDGE INSTRUMENTS

Page 8 of 8