People
Texas: 25,674,681 (2011)
Australia: 22,328,800 (2011)
Texas has cowboys.
Australia has stockman.
Both love country music.
Marsupials
Pavement
Basics
Layers
are
necessary
to
provide
economy
while
protecting
weak
materials
Pavement
Design:
Where
were
we?
AASHO
Road
Test
Trucks
}
Max
Tensile
Strain
Zone
of
High
Compression
Durable
Base
100
250
mm
(4
10)
Pavement
Foundation
25
20
15
AASHTO
PerRoad
10
5
0
0.1
10
Traffic, ESAL
100
1000
Perpetual
Pavements
Resist
Structural
Distresses
Fatigue
Cracking
Rutting
400
DBM50
HDM
Thickness 300
of asphalt
layers
200
(mm)
100
0
Design life (msa)
RATE OF RUTTING vs
BOUND LAYER THICKNESS
1000
100
Rate of
rutting
(mm/msa) 10
0.1
100
200
300
400
Design
Applications
High
Volume
Pavements
MEPDG
PerRoad
TTI
Low
and
Medium
Volume
Pavements
PerRoad
High
Modulus
Bases
Pavement
Rehab
SHRP
2
Project
R23
Using
Existing
Pavement
in
Place
and
Achieving
Long
Life
Rubblization
Overlays
Performance
Lane Miles
800
WSDOT
Interstate
Ages
600
400
200
0
0 - 10
11 - 20
21 - 30
31 - 40
Age (Years)
41 - 50
51 - 60
61 or More
Smoothness
1200
HMA (Lane Miles)
PCCP (Lane Miles)
1000
Lane Miles
800
600
400
200
0
0.0 - 0.5 0.5 - 1.0 1.0 - 1.5 1.5 - 2.0 2.0 - 2.5 2.5 - 3.0 3.0 - 3.5 3.5 - 4.0 4.0 - 4.5 4.5 - 5.0 5.0 or
More
IRI (m/km)
Case
1
Perpetual
Pavement
with
Rubblization
Rubblize 28
cm
PCC
Overlay
with
20
cm
HMA
Initial
Cost:
2013
Bid
Tabs
CO
Rubbl.
~
$5.00
CO
SMA
~
$85.00
CO
HMA
~
$75.00
TX
HMA
~
$70.00
WA
HMA
~
$85.00
Item
Unit Cost
Edge
Drains
5.00/ft
16.40/m
Rubblize
5.50/yd2
6.57/m2
HMA
Overlay
80.00/ton
88.00/t
Case
2
Remove/Replace
PCC
Remove
PCC
Replace
with
11
PCC
Item
Unit
Cost
Remove PCC
25.00/yd2
29.90/m2
PCC
Placement
41.00/yd2
49.04/m2
Initial
Cost:
2013
Bid
Tabs
PCC
CO
~
$34.00
WA
~
$47.00
Cost, $/lane-mile
500000
400000
300000
= 32%
200000
100000
0
Rubblize
and
Overlay
Remove/Replace
PCC
General
Experience
First
Cost:
Rubblization ~
32%
less
than
remove/replace
Speed
of
Construction:
days
vs.
weeks
Impact
of
User
Costs?
1
mile
long
4
lanes
One
lane
open
each
direction
during
work
40,000
ADT
Case
1
Rubblization:
One
lane-mile/day
production
Paving:
2
lane-miles/day
Sequence
3
bottom
lift
3
2nd lift
2
3rd lift
24
hour
closure
until
2nd asphalt
lift
12
hour
closure
for
3rd
Case
2
Remove/Replace
PCC
Removal:
2000
SY/day
~
2
days/lane
24
hr/day
Trim
Base
and
Set
Dowels
12
hr
Paving:
0.75
mile/day
11
hr
Curing:
3
days
24
hr/day
User Costs
Cost, $/lane-mile
70000
60000
= 58%
50000
40000
30000
20000
10000
0
Rubblize
and
Overlay
Remove/Replace PCC
Concrete
Initial
Construction
Grind
at
Year
15
Overlay
at
25
years
Overlay
at
35
years
Cost, $/lane-mile
700000
600000
= 22%
500000
400000
300000
200000
100000
0
Rubblize
and
Overlay
Remove/Replace PCC
Summary
Perpetual
Pavement
design
is
improving
More
efficient
pavements
More
cost-effective