MBA 538-OperationsManagement
Three (03) Hours
AnswerAny FIVE Questions
Noteson both sidesof A'4 paperareallowed.
Use a separateanswerbook for eachpart
This paperconsistsof Seven(07) Questionsin Five (05) printed pages
PART - I
Q1.
i. Whatar
ii. Whal
clas
- andsimilaritiesbetweenproductsandservices?
(04 Marks)
product
is
it
different
from the
design?How
- .rcsignapproachin
,--rrtlol designapproach?
(05 Marks)
Q2.
i.
ll.
il1.
What is meantby the capacityof a facility?In what ways can the capacityof a facility
planningrequiredfor a facility?
Why is capacityrequirements
be measured?
(05 Marks)
:j
Elaboratethis statement.
Strategiccapacityplanningis a key for competitiveness?
(04 Marks)
two locations:Campahaand Negambofor its audio
Amila Electronicsis considering
equipmentfactory. At Gampaha,the fixed cost of the factory is estimatedat Rs I
At
million and the variablecost is Rs 1,200per audio equipmentmanufactured.
the
variable
1.2
and
at
Rs
million
is
estimated
Negombo,the fixed cost of the factory
The sellingpriceof the equipment
costisRs 1,100per audioequipmentmanufactured.
place
Decidewhich
of manufacture.
the
of
will be Rs 3,000 per unit irrespective
analysis.
locationis bestfor the factoryunderdifferentdemandlevelsusingbreak-even
(l I Marks)
(Total20 marks)
Q3.
that havepredominantlyproduct,process,
i.
Give at leasttwo examplesof organizations
andfixed-positionlayouts.
(06 Marks)
ll,
ul.
B
C
D
E
F
G
H
I
J
Total
Tasktime (Seconds)
Precedinstask
20
40
l3
l0
None
8
l5
60
75
60
55
356
A
B
B
B
C,D,E
A
G
H
F,'
January
February
March
April
May
June
(Rs.'000)
215
223
232
234
240
247
Qs.
i. What is the differencebetweensporadicproblemsandchronicproblemsin the contextof
qualitymanagement?
(06 Marks)
ii. "lf your employeesare askedto increasethe quality of output,the quantityof outputwill
be suffered."Discussthis statement.
(06 Marks)
iii. Leanmanufacturing
focuseson eliminationof waste.Explainfour leantoolswhich are
usedto eliminatewaste.
(08 Marks)
(Total20 marks)
PART.II
Q6.
i.
ii.
There is an order for 200 units.of productQ in period 7. The lead time of each
componentandmaterialsin the structurehasbeengiven in the figure.
The on-handquantitiesand safetystocksmaintainedfor the itemsare given in the table
below:
Items
On-handQuantity
20
30
SafetyStock
Q7.
i.
ii.
Inventory
Category
Average
Part
Opening
Closing
Unit Cost ($)
Number Inventory for Inventory for
the Period
the Period
22,000
2.00
18,000
Raw materials RM-I
4.000
3.00
RM-2
6,000
3.500
5.00
RM-3
2.500
l,000
10.00
1.000
RM-4
4,000
r8.00
Work-inWIP-I
8.000
process
wlP-2
Finished
goods
FG-I
FG-2
5,000
1.500
700
I 1,000
500
300
21.00
33.00
42.00
* * * * * * * rl * * t( * !k * :t tr * * * rk ?t * * * :t tt * * * * * * ?k!t rt rt * * * * * t( ?k