61124 Federal Register / Vol. 70, No.

202 / Thursday, October 20, 2005 / Notices

FERCOnlineSupport@ferc.gov or toll- for Contractor Cumulative Claim and copyrighted material, EPA will provide
free at 1–866–208–3676, or for TTY, Reconciliation, 1900–10, EPA ICR a reference to that material in the
(202) 502–8659. Number 0246.09, OMB Control Number version of the comment that is placed in
Any comments should be filed within 2030–0016, to EPA online using EDOCKET. The entire printed comment,
30 days from the issuance date of this EDOCKET (our preferred method), by e- including the copyrighted material, will
notice, and should be addressed to the mail to oei.docket@epa.gov, or by mail be available in the public docket.
Secretary, Federal Energy Regulatory to: EPA Docket Center, Environmental Although identified as an item in the
Commission, 888 First Street, NE., Protection Agency, Mailcode: 28221T, official docket, information claimed as
Room 1–A, Washington, DC 20426. Attention Docket ID # No. OARM–2005– CBI, or whose disclosure is otherwise
Please affix ‘‘Saranac River Project No. 0002 for Monthly Progress Reports, or restricted by statute, is not included in
2738’’ to all comments. Comments may OARM–2005–0003 for Contractor the official public docket, and will not
be filed electronically via Internet in Cumulative Claim and Reconciliation, be available for public viewing in
lieu of paper. The Commission strongly 1200 Pennsylvania Ave., NW., EDOCKET. For further information
encourages electronic filings. See 18 Washington, DC 20460. about the electronic docket, see EPA’s
CFR 385.2001(a)(1)(iii) and the FOR FURTHER INFORMATION CONTACT: Federal Register notice describing the
instructions on the Commission’s Web Tiffany Schermerhorn, Policy, Training electronic docket at 67 FR 38102 (May
site under the ‘‘eFiling’’ link. For further and Oversight Division, Office of 31, 2002), or go to http://www.epa.gov./
information, contact Tom Dean at (202) Acquisition Management, Mail Code edocket.
502–6041. 3802R, Environmental Protection The EPA would like to solicit
Agency, 1200 Pennsylvania Ave., NW., comments to:
Magalie R. Salas, (i) Evaluate whether the proposed
Washington, DC 20460; e-mail address:
Secretary. collections of information are necessary
schermerhorn.tiffany@epa.gov.
[FR Doc. E5–5788 Filed 10–19–05; 8:45 am] for the proper performance of the
SUPPLEMENTARY INFORMATION: EPA has
BILLING CODE 6717–01–P functions of the Agency, including
established public dockets for these
whether the information will have
ICRs under Docket ID number OARM–
practical utility;
2005–0002 for Monthly Progress
ENVIRONMENTAL PROTECTION (ii) Evaluate the accuracy of the
Reports, EPA ICR Number 1039.11,
AGENCY Agency’s estimate of the burden of the
OMB Control Number 2030–0005; and
proposed collections of information,
[OARM–2005–0002, OARM–2005–0003; docket ID number OARM–2005–0003
including the validity of the
FRL–7986–1] for Contractor Cumulative Claim and
methodology and assumptions used;
Reconciliation, 1900–10, EPA ICR (iii) Enhance the quality, utility, and
Agency Information Collection Number 0246.09, OMB Control Number clarity of the information to be
Activities: Proposed Collection; 2030–0016, which are available for collected; and
Comment Request; Monthly Progress public viewing at the OEI Docket in the (iv) Minimize the burden of the
Reports, EPA ICR Number 1039.11, EPA Docket Center (EPA/DC), EPA collections of information on those who
OMB Control Number 2030–0005; and West, Room B102, 1301 Constitution are to respond, including through the
Contractor Cumulative Claim and Ave., NW., Washington, DC. The EPA use of appropriate automated electronic,
Reconciliation, 1900–10, EPA ICR Docket Center Public Reading Room is mechanical, or other technological
Number 0246.09, OMB Control Number open from 8:30 a.m. to 4:30 p.m., collection techniques or other forms of
2030–0016 Monday through Friday, excluding legal information technology, e.g., permitting
holidays. The telephone number for the electronic submission of responses.
AGENCY: Environmental Protection Reading Room is (202) 566–1744, and
Agency (EPA). Burden means the total time, effort, or
the telephone number for the OEI financial resources expended by persons
ACTION: Notice. Docket is (202) 566–1752. An electronic to generate, maintain, retain, or disclose
version of the public docket is available or provide information to or for a
SUMMARY: In compliance with the
through EPA Dockets (EDOCKET) at Federal agency. This includes the time
Paperwork Reduction Act (44 U.S.C.
http://www.epa.gov/edocket. Use needed to review instructions; develop,
3501 et seq.), this document announces
EDOCKET to obtain a copy of the draft acquire, install, and utilize technology
that EPA is planning to submit two
collection of information, submit or and systems for the purposes of
continuing Information Collection
view public comments, access the index collecting, validating, and verifying
Requests (ICR) to the Office of
listing of the contents of the public information, processing and
Management and Budget (OMB). This is
docket, and to access those documents maintaining information, and disclosing
a request to renew two existing
in the public docket that are available and providing information; adjust the
approved collections. These ICRs are
electronically. Once in the system, existing ways to comply with any
scheduled to expire on March 31, 2006.
select ‘‘search,’’ then key in the docket previously applicable instructions and
Before submitting the ICRs to OMB for
ID number identified above. requirements; train personnel to be able
review and approval, EPA is soliciting Any comments related to this ICR
comments on specific aspects of the to respond to a collection of
should be submitted to EPA within 60 information; search data sources;
proposed information collection as days of this notice. EPA’s policy is that
described below. complete and review the collection of
public comments, whether submitted information; and transmit or otherwise
DATES: Comments must be submitted on electronically or in paper, will be made disclose the information.
or before December 19, 2005. available for public viewing in
ADDRESSES: Submit your comments, EDOCKET as EPA receives them and Individual ICRS
referencing docket ID number OARM– without change, unless the comment (1) Monthly Progress Reports, EPA
2005–0002 for Monthly Progress contains copyrighted material, CBI, or ICR No. 1039.11, OMB Control No.
Reports, EPA ICR Number 1039.11, other information whose public 2030–0005, expires 3/31/06.
OMB Control Number 2030–0005; and disclosure is restricted by statute. When Affected entities: Entities potentially
docket ID number OARM–2005–0003 EPA identifies a comment containing affected by this action are those holding

VerDate Aug<31>2005 16:14 Oct 19, 2005 Jkt 208001 PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 E:\FR\FM\20OCN1.SGM 20OCN1
Federal Register / Vol. 70, No. 202 / Thursday, October 20, 2005 / Notices 61125

cost reimbursable, time and material, and fixed fee is necessary to close out relates to reporting requirements placed
labor hour, or indefinite quantity/ the contract. Responses to the on persons who manufacture, import,
indefinite delivery fixed rate contracts information collection are mandatory process, or distribute in commerce
with EPA. for those contractors completing work chemical substances or mixtures and
Abstract: Agency contractors who under a cost reimbursement contract, who obtain information that such
have cost reimbursable, time and and are required to receive final substances or mixtures present a
material, labor hour, or indefinite payment. Information submitted is substantial risk of injury to health or the
delivery/indefinite quantity fixed rate protected from public release in environment. Before submitting this ICR
contracts will report the technical and accordance with the Agency’s to the Office of Management and Budget
financial progress of the contract on a confidentiality regulation, 40 CFR 2.201 (OMB) for review and approval under
monthly basis. EPA will use this et seq. the PRA, EPA is soliciting comments on
information to monitor the contractor’s Burden Statement: EPA estimates that specific aspects of the collection.
progress under the contract. Responses the annual hourly burden for this DATES: Written comments, identified by
to the information collection are collection will remain the same as the docket identification (ID) number
mandatory for contractors, and are reported in the previous information OPPT–2005–0043, must be received on
required for the contractors to receive collection request because there has or before December 19, 2005.
monthly payments. Information been no change in the information being ADDRESSES: Comments may be
submitted is protected from public collected and approximately the same submitted electronically, by mail, or
release in accordance with the Agency’s number of contracts are closed out each through hand delivery/courier. Follow
confidentiality regulations, 40 CFR year. EPA estimates that the annual the detailed instructions as provided in
2.201 et seq. An agency may not hourly burden will be 165 hours based Unit I. of the SUPPLEMENTARY
conduct or sponsor, and a person is not on the following: Each response will INFORMATION.
required to respond to, a collection of take approximately 40 minutes, and
information unless it displays a FOR FURTHER INFORMATION CONTACT: For
EPA closes out approximately 247 general information contact: Colby
currently valid OMB control number. contracts per year. The annual dollar
The OMB control numbers for EPA’s Lintner, Regulatory Coordinator,
burden is estimated at $5,404.36 based Environmental Assistance Division
regulations in 40 CFR are listed in 40 on a combination of contractor
CFR part 9. (7408M), Office of Pollution Prevention
employees providing the information. and Toxics, Environmental Protection
Burden Statement: EPA estimates that The total cost of the contractor-provided
the annual hourly burden for this Agency, 1200 Pennsylvania Ave., NW.,
information is estimated to be $21.88 for Washington, DC 20460–0001; telephone
collection will remain the same as the 40 minute period. Minimal
reported in the previous information number: (202) 554–1404; e-mail address:
operation and maintenance costs are TSCA-Hotline@epa.gov.
collection because there has been no expected for photocopying and postage.
change in the information being For technical information contact:
collected and approximately the same Dated: October 12, 2005. Terry O’Bryan, Risk Assessment
number of contracts remain active. As Leigh Pomponio, Division (7403M), Office of Pollution
such, it is estimated that each response Manager, Policy and Oversight Service Center. Prevention and Toxics, Environmental
will take approximately 36 hours. EPA [FR Doc. 05–20980 Filed 10–19–05; 8:45 am]
Protection Agency, 1200 Pennsylvania
anticipates that the total active affected Ave., NW., Washington, DC 20460–
BILLING CODE 6560–50–P
contracts will remain approximately 0001; telephone number: (202) 564–
324, time 12 submissions per year to 7656; fax number: (202) 564–1626; e-
yield about 3,888 annual collections. ENVIRONMENTAL PROTECTION mail address: obryan.terry@epa.gov.
Each collection is estimated to cost AGENCY SUPPLEMENTARY INFORMATION:
$2,592 based on a variety of contractor I. General Information
[OPPT–2005–0043; FRL–7735–3]
personnel performing individual tasks
required for information gathering and A. Does this Action Apply to Me?
Notification of Substantial Risk of
submission. The anticipated 3,888 Injury to Health and the Environment You may be potentially affected by
annual submissions are estimated to under TSCA Section 8(e); Request for this action if you are a company that
cost $10,077,696 annually. Minimal Comment on Renewal of Information manufactures, imports, processes, or
operation and maintenance costs are Collection Activities distributes in commerce a chemical
expected for photocopying and postage. substance or mixture and which obtains
(2) Contractor Cumulative Claim and AGENCY: Environmental Protection information that reasonably supports
Reconciliation, EPA ICR No. 0246.09, Agency (EPA). the conclusion that such substance or
OMB Control No. 2030–0016, expires ACTION: Notice. mixture presents a substantial risk of
March 31, 2006. injury to health or the environment.
Affected entities: Entities potentially SUMMARY: In compliance with the Potentially affected entities may
affected by this action are those holding Paperwork Reduction Act (PRA) (44 include, but are not limited to:
cost reimbursable contracts with EPA. U.S.C. 3501 et seq.) EPA is seeking • Chemical manufacturing (NAICS
Abstract: At the completion of a cost public comment on the following 325), e.g., basic chemical
reimbursement contract, contractors Information Collection Request (ICR): manufacturing; resin, synthetic rubber
will report final costs incurred, Notification of Substantial Risk of Injury and artificial and synthetic fibers and
including direct labor, materials, to Health and the Environment under filaments manufacturing; pesticide,
supplies, equipment, other direct Toxic Substances Control Act (TSCA) fertilizer, and other agricultural
charges, subcontracting, consultant fees, Section 8(e) (EPA ICR No. 0794.11, chemical manufacturing; paint, coating,
indirect costs, and fixed fee. Contractors OMB Control No. 2070–0046). This ICR and adhesive manufacturing; soap,
will report this information on EPA involves a collection activity that is cleaning compound, and toilet
Form 1900–10. EPA will use this currently approved and scheduled to preparation manufacturing, etc.
information to reconcile the contractor’s expire on June 30, 2006. The • Petroleum refineries (NAICS
costs. Establishment of the final costs information collected under this ICR 32411), e.g., crude oil refining, diesel

VerDate Aug<31>2005 16:14 Oct 19, 2005 Jkt 208001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\20OCN1.SGM 20OCN1

S-ar putea să vă placă și