59066 Federal Register / Vol. 70, No.

195 / Tuesday, October 11, 2005 / Notices

Washington, DC. There is an particular resource agency, they must motions to intervene must be received
eSubscription link on the web site that also serve a copy of the document on on or before the specified deadline date
enables subscribers to receive e-mail that resource agency. for the particular application.
notification when a document is added Motions to intervene and protests may All filings must (1) bear in all capital
to a subscribed dockets(s). For be filed electronically via the Internet in letters the title ‘‘PROTEST’’ or
assistance with any FERC Online lieu of paper. The Commission strongly ‘‘MOTION TO INTERVENE’’; (2) set
service, please e-mail encourages electronic filings. See CFR forth in the heading the name of the
FERCOnlineSupport@ferc.gov. or call 385.2001 (a)(1)(iii) and the instructions applicant and the project number of the
(866) 208–3676 (toll free). For TTY, call on the Commission’s Web site (http:// application to which the filing
(202) 502–8659. www.ferc.gov) under the ‘‘eFiling’’ link. responds; (3) furnish the name, address,
k. This application has been accepted, and telephone number of the person
Magalie R. Salas, but is not ready for environmental protesting or intervening; and (4)
Secretary. analysis at this time. otherwise comply with the requirements
[FR Doc. E5–5547 Filed 10–7–05; 8:45 am] l. The existing Danbury Project of 18 CFR 385.2001 through 385.2005.
BILLING CODE 6717–01–P consists of: (1) A 35-foot-high concrete Agencies may obtain copies of the
dam with a 48-foot-wide spillway with application directly from the applicant.
three sections, each of which is A copy of any protest or motion to
DEPARTMENT OF ENERGY equipped with 7-foot-high slide gates; intervene must be served upon each
(2) a 300-foot-long earthen dike representative of the applicant specified
Federal Energy Regulatory connecting to the right side of the in the particular application.
Commission concrete dam; (3) a powerhouse (Plant o. Procedural schedule and final
[Project No. 9184–013] 1) integral to the dam containing a 176- amendments: The application will be
kW turbine generating unit and a 300- processed according to the following
Flambeau Hydro, LLC; Notice of kW turbine generating unit; (4) a 255- Hydro Licensing Schedule. Revisions to
Application Accepted for Filing and acre reservoir with a negligible net the schedule will be made as
Soliciting Motions To Intervene and storage capacity at a water surface appropriate. The Commission staff
Protests elevation of 929.21 feet NGVD from proposes to issue one environmental
April through October and 928.11 feet assessment rather than issue a draft and
October 3, 2005. NGVD from November through March; final EA. Comments, terms and
Take notice that the following (5) a 2,500-foot-long power canal that conditions, recommendations,
hydroelectric application has been filed conveys water to; (6) a second prescriptions, and reply comments, if
with the Commission and is available powerhouse (Plant 2) containing a any, will be addressed in the EA. Staff
for public inspection. single 600-kW turbine generating unit; intends to give at least 30 days for
a. Type of Application: Subsequent and (7) appurtenant facilities. The entities to comment on the EA before
License. applicant estimates that the total final action is taken on the license
b. Project No.: P–9184–013. average annual generation is 3,844 application.
c. Date Filed: June 10, 2005. megawatt-hours. Issue Scoping Document for
d. Applicant: Flambeau Hydro, LLC. m. A copy of the application is Comments—September 2005.
e. Name of Project: Danbury available for review at the Commission Notice application ready for
Hydroelectric Project. in the Public Reference Room or may be environmental analysis—November
f. Location: On the Yellow River in viewed on the Commission’s Web site at 2005.
Burnett County, Wisconsin. The project http://www.ferc.gov using the Notice of the availability of the EA—
does not occupy federal lands. ‘‘eLibrary’’ link. Enter the docket March 2006.
g. Filed Pursuant to: Federal Power number excluding the last three digits in Ready for Commission’s decision on the
Act 16 U.S.C. 791 (a)–825(r). the docket number field to access the Application—May 2006.
h. Applicant Contact: Scott Klabunde, document. For assistance, contact FERC Final amendments to the application
North American Hydro, Inc., P.O. Box Online Support at must be filed with the Commission no
167, Neshkoro, WI 54960; 920–293– FERCOnlineSupport@ferc.gov or toll- later than 30 days from the issuance
4628 ext. 14. free at 1–866–208–3676, or for TTY, date of the notice of ready for
i. FERC Contact: Tim Konnert, (202) (202) 502–8659. A copy is also available environmental analysis.
502–6359 or timothy.konnert@ferc.gov. for inspection and reproduction at the
j. Deadline for filing motions to address in item h. above. Magalie R. Salas,
intervene and protests: 60 days from the You may also register online at Secretary.
issuance date of this notice. http://www.ferc.gov/esubscribenow.htm [FR Doc. E5–5548 Filed 10–7–05; 8:45 am]
All documents (original and eight to be notified via email of new filings BILLING CODE 6717–01–P
copies) should be filed with: Magalie R. and issuances related to this or other
Salas, Secretary, Federal Energy pending projects. For assistance, contact
Regulatory Commission, 888 First FERC Online Support. DEPARTMENT OF ENERGY
Street, NE., Washington, DC 20426. n. Anyone may submit a protest or a
The Commissions Rules of Practice motion to intervene in accordance with Federal Energy Regulatory
and Procedure require all intervenors the requirements of Rules of Practice Commission
filing documents with the Commission and Procedure, 18 CFR 385.210, Notice of Application for Transfer of
to serve a copy of that document on 385.211, and 385.214. In determining License and To Change Name of
each person whose name appears on the the appropriate action to take, the Project and Soliciting Comments,
official service list for the project. Commission will consider all protests Motions To Intervene, and Protests
Further, if an intervenor files comments filed, but only those who file a motion
or documents with the Commission to intervene in accordance with the October 4, 2005.
relating to the merits of an issue that Commission’s Rules may become a Take notice that the following
may affect the responsibilities of a party to the proceeding. Any protests or hydroelectric application has been filed

VerDate Aug<31>2005 16:40 Oct 07, 2005 Jkt 208001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM 11OCN1
Federal Register / Vol. 70, No. 195 / Tuesday, October 11, 2005 / Notices 59067

with the Commission and is available Room or may be viewed on the DEPARTMENT OF ENERGY
for public inspection: Commission’s Web site at http://
a. Application Type: Transfer of www.ferc.gov using the ‘‘eLibrary’’ link. Federal Energy Regulatory
License and Change of Project Name. Enter the docket number (P–539) in the Commission
b. Project No.: 539–006. docket number field to access the
c. Date Filed: September 27, 2005. document. For assistance, call toll-free Notice of Application for Amendment
d. Applicants: Kentucky Utilities 1–866–208–3676 or e-mail of License and Soliciting Comments,
Company (Transferor); Lock 7 Hydro FERCOnlineSupport@ferc.gov. For TTY, Motions To Intervene, and Protests
Partners, LLC (Transferee). call (202) 502–8659. A copy is also
e. Name and Location of Project: The October 4, 2005.
available for inspection and Take notice that the following
Lock No. 7 Hydroelectric Project is
reproduction at the addresses in item g. application has been filed with the
located at the U.S. Army Corps of
above. Commission and is available for public
Engineers’ Kentucky River Lock and
Dam No. 7 in Mercer County, Kentucky. l. Individuals desiring to be included inspection:
f. Filed Pursuant to: Federal Power on the Commission’s mailing list should a. Application Type: Capacity
Act, 16 U.S.C. 791a–825r. so indicate by writing to the Secretary Amendment of License.
g. Applicants Contacts: For the of the Commission. b. Project No.: 7396–045.
transferor: John Wolfram, Kentucky c. Date Filed: September 9, 2005.
m. Comments, Protests, or Motions to d. Applicant: The Incorporated
Utilities Company, c/o LG&E Services, Intervene—Anyone may submit
220 West Main Street, Louisville, KY County of Los Alamos.
comments, a protest, or a motion to e. Name of Project: Abiquiu
40202, (502) 627–4110. For the intervene in accordance with the
transferee: David Brown Kinloch, Hydroelectric Project.
requirements of Rules of Practice and f. Location: The project is located on
Shaker Landing Hydro Associates, Inc.,
Procedure, 18 CFR 385.210, .211, .214. the Chama River, Rio Arriba County,
414 South Wenzel Street, Louisville, KY
In determining the appropriate action to New Mexico.
40204, (502) 589–0975 and Larry Hicks,
take, the Commission will consider all g. Filed Pursuant to: Federal Power
Salt River Electric, 111 West Brashear
protests or other comments filed, but Act, 16 U.S.C. 791a–825r.
Avenue, Bardstown, KY 40004, (502)
only those who file a motion to h. Applicant Contact: Thomas L.
348–3931.
h. FERC Contact: James Hunter at intervene in accordance with the Biggs, Department of Public Utilities,
(202) 502–6086. Commission’s Rules may become a Los Alamos County, 901 Trinity Drive,
i. Deadline for filing comments, party to the proceeding. Any comments, P.O. Drawer 1030, Los Alamos, NM
protests, and motions to intervene: protests, or motions to intervene must 87544, (505) 662–8130.
November 7, 2005. be received on or before the specified i. FERC Contact: Any questions on
All documents (original and eight comment date for the particular this notice should be addressed to Mrs.
copies) should be filed with: Magalie R. application. Anumzziatta Purchiaroni at (202) 502–
Salas, Secretary, Federal Energy n. Filing and Service of Responsive 6191, or e-mail address:
Regulatory Commission, 888 First Documents—Any filings must bear in anumzziatta.purchiaroni@ferc.gov.
Street, NE., Washington, DC 20426. all capital letters the title j. Deadline for filing comments and or
Comments, protests, and interventions ‘‘COMMENTS’’, ‘‘PROTEST’’, OR motions: November 7, 2005.
may be filed electronically via the ‘‘MOTION TO INTERVENE’’, as k. Description of Request: The
Internet in lieu of paper; see 18 CFR applicable, and the Project Number of licensee filed an amendment
385.2001(a)(1)(iii) and the instructions the particular application to which the application to install a new low flow
on the Commission’s Web site under the filing refers. Any of the above-named turbine generator unit, which would be
‘‘e-Filing’’ link. The Commission documents must be filed by providing located within an addition of the
strongly encourages electronic filings. existing powerhouse. The project
the original and eight copies to: The
Please include the Project Number on currently generates electricity using two
Secretary, Federal Energy Regulatory
any comments or motions filed. generating units that are able to utilize
Commission, 888 First Street, NE.,
The Commission’s Rules of Practice flows between 200–650 cfs each. The
Washington, DC 20426. A copy of any
and Procedure require all intervenors proposed low flow unit will allow the
motion to intervene must also be served
filing a document with the Commission project to operate during low flow
upon each representative of the
to serve a copy of that document on winter months when the existing
Applicants specified in the particular
each person in the official service list generating units do not operate. New
application.
for the project. Further, if an intervenor construction would be limited to a small
files comments or documents with the o. Agency Comments—Federal, State, expansion of the existing powerhouse
Commission relating to the merits of an and local agencies are invited to file and tailrace.
issue that may affect the responsibilities comments on the described application. l. Locations of the Application: A
of a particular resource agency, they A copy of the application may be copy of the application is available for
must also serve a copy of the documents obtained by agencies directly from the inspection and reproduction at the
on that resource agency. Applicants. If an agency does not file Commission’s Public Reference Room,
j. Description of Application: The comments within the time specified for located at 888 First Street, NE., Room
Applicants seek Commission approval filing comments, it will be presumed to 2A, Washington, DC 20426, or by calling
to transfer the license for the Lock No. have no comments. One copy of an (202) 502–8371. Information about this
7 Hydroelectric Project from the agency’s comments must also be sent to filing may also be viewed on the
Transferor to the Transferee. The the Applicants’ representatives. Commission’s Web site at http://
Transferee also requests that the name www.ferc.gov using the ‘‘eLibrary’’ link.
Magalie R. Salas,
of the project be changed to the Mother Enter the docket number excluding the
Ann Lee Hydroelectric Station. Secretary. last three digits in the docket number
k. This filing is available for review at [FR Doc. E5–5555 Filed 10–7–05; 8:45 am] field to access the document. You may
the Commission in the Public Reference BILLING CODE 6717–01–P also register online at http://

VerDate Aug<31>2005 16:40 Oct 07, 2005 Jkt 208001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\11OCN1.SGM 11OCN1

S-ar putea să vă placă și