Sunteți pe pagina 1din 23

PUBLIC

Connecting Wind Power Plants to Weak Grids


Lessons learned from the analysis, design and connection of wind power plants
to weak electricity grids
Wind Industry Forum, 26 March 2015
Antonio Martinez | Manager, BoP Engineering APAC | Vestas Wind Systems A/S
1

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Agenda

1. Characteristics of a weak grid.


2. Weak grid challenges.
3. Power system study.

4. Wind Power Plant solutions.


5. Questions?

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Characteristics of a weak grid


Weak grid definition
Short Circuit Ratio (SCR) < 3 and Xgrid/Rgrid ratio < 5;
The SCR indicates the amount of power (Swpp) that can be accepted by the power
system without affecting the power quality (V, f, harmonics, flicker) at the PoC.

Low grid inertia constant (H).


Where,
SCR = Smin/Swpp;
Smin = Minimum fault level at the WPP MV bus without the WPP [MVA];
Swpp = WPP rating [MW].
Rgrid

Grid Impedance

Wind Power Plant


(WPP)

WPP MV Bus

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

Xgrid

Point of Connection
(PoC)
PUBLIC

Characteristics of a weak grid


Weak grid definition
Both the fault level at the point of connection (PoC) and WPP MW rating determines if
the WPP connection will experience the power quality issues of a weak grid.

SCR vs Swpp
9.00
8.00
7.00

SCR

6.00
5.00

Smin=200 MVA

4.00

Smin=300 MVA

3.00

Smin=400 MVA

2.00

Weak Grid Boundary

1.00
0.00
0

50

100

150

200

Swpp (MW)

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

250

Characteristics of a weak grid


Weak grid connections
Large WPPs located in remote locations far from generation/load centers, and
interconnected to the power system using long transmission lines.
GW of weak grid projects are expected from the global wind power market, including
Australia.
Examples in Australia:
WPP
Musselroe
Collgar
Silverton (stage1)

Swpp (MW)
168
250
300

SCR
1.74*
2.65
1.24

*at Derby;

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Characteristics of a weak grid


Weak grid connections
SCR = 1.24

SCR = 1.74
Musselroe WPP

Silverton WPP

100km+
Transmission Line
to Norwood

250km+
Transmission Line

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Weak grid challenges


Weak grids present technical challenges to WPP connections.
Steady State Issues
Voltage Stability if affected by both P and Q injected into the grid. PV and QV analysis
can be applied to determine the stability limits (critical V, max P, Q margins);
WPP active power rating limited according to the PV stability limit and/or the Surge
Impedance Loading of the long radial transmission line;
Grid continuous operating voltage range limits the reactive power capability of the WPP.
This becomes an issue with Q capability requirements from grid codes;
Voltage change, overshoot, etc. limit the P and Q ramp rates. This becomes an issue
with P control and Q control requirements from grid codes;

N-1 (element put of service) power system amplifies the weak grid issues by lowering
further the SCR.

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Weak grid challenges


WPP MW rating limitation
PV Curves
1.05
1
0.95

Note:
X=0.6 represents weaker grid
X=0.3 represents stronger grid

VS (pu)

0.9
0.85

X=0.6 pf=0.95; X/R= 10


X/RPmax

0.8

X=0.3; pf=0.95; X/R= 10


X=0.6 pf=0.95; X/R= 2

0.75

SCRPmax

X=0.3; pf=0.95; X/R= 2

0.7
0.65

Pmax = 0.6pu

Pmax = 1.2pu

0.6
0

0.5

1.5

P (pu)

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Weak grid challenges


Poor voltage regulation due to large dV for small dQ
On the weaker grid 20% change in Q changes the grid voltage by 20%;
On the stronger grid 20% change in Q changes the grid voltage by 7%.
1

QV Curves

0.8
Note:
X=0.6 represents weaker grid
X=0.3 represents stronger grid

0.6
Slope~1 for
weak grid

0.4
Q (pu)

0.2

X=0.6; P=0.5; X/R= 10

0
-0.2

0.5

0.6

0.7

0.8

0.9

-0.6
-0.8

1.1

Slope~2.85 for
stronger grid

-0.4

X/RQmargin

1.2

X=0.3; P=0.5; X/R= 2


X=0.6; P=0.5; X/R= 2

Stronger grid has reactive power margin


Weaker grid has NO reactive power margin

-1

X=0.3; P=0.5; X/R= 10

Vs (pu)

Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Weak grid challenges


Reduced Reactive Power Capability
200

Typical/Stronger Grid Grid doesnt


affect WPP reactive power capability

150

50
Required PQ
Capability

Q_PCC, V=0.90pu
-50

100
Q_PCC, V=1.00pu

-100

Q_PCC, V=1.10pu

-150
-200
-250
0

50

100

150

200

250

300

Active Power Output (MW)

Weak Grid It doesnt take much +/-Q for


the power system voltage to reach +/-10%.
The WTG continuous operating voltages
(typ. +/-10%) limits the WPP reactive power
capability.
10 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

50
Reactive Capability (MVAR)

Reactive Capability (MVAR)

100

Required PQ
Capability

Q_PCC, V=0.90pu
-50
Q_PCC, V=1.00pu

Q_PCC, V=1.10pu
-100

-150
0

50

100

150

200

Active Power Output (MW)

PUBLIC

250

300

Weak grid challenges


Dynamic Issues
Inability of the power system to absorb the reactive current injection during the fault may
cause the WPP to trip on the transient overvoltage during the fault recovery period;
Fast and large voltage angle shifts can make it difficult for the WTG Phase Lock Loop
(PLL) to track the voltage angle correctly, which may create instability of WTG fast
current control loops;
WTG LVRT control retriggering may produce reactive power swings and voltage
instability if the WPP control system and the WTG level control is not coordinated.
Coordination can be challenging due to large voltage difference between the PoC and the
WTG;
Poorly damped FRT response due to low system inertia amongst other weak grid
contributors.

11 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Weak grid challenges


Grid Code Issues
In general grid codes have been written under the assumption that WPP connect to
strong grids;
Some grid code technical requirements for WPP have no benefit and may
adversely impact the stability of the grid. For weak grids these requirements
should be modified or not be binding;
Steady state reactive power requirements. Asking for +/- 0.93 power factor, for example,
may not be possible in a weak grid without exceeding the grid normal operating voltage
range of +/-10%;
Steady state P and Q (pf, V) control requirements. The P and Q ramp rates can not be
too fast in a weak grid without exceeding the voltage change or damping or settling time
requirements of the grid code.

12 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Weak grid challenges


Grid Code Issues
FRT requirements.
Too much reactive power/current injection during the fault may lead to voltage
instability or overvoltage tripping after the fault is cleared.
The P recovery can not be too fast in a weak grid without exceeding the damping or
settling time requirements of the grid code. Ramping P to pre-fault value too fast
may also produce transient overvoltage, LVRT retriggering and trip WPP.

CAUTION!

13 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Power system study


Dynamic Simulation Considerations
Use the right tools for the job! PSSE alone is not the right tool. Both PSCAD (or
equivalent EMT software) and PSSE software is required for weak grid studies;
PSSE WTG models do not represent the fast inner current control loops of the power
electronics and therefore the transient stability representation in PSSE is optimistic;
PSSE time steps are typically in milliseconds, but microsecond time steps are required
for the fast inner current control loops;
PSSE can experience numerical instability with SCR<3 and hence hard for a simulation
to converge;
Asymmetrical grid conditions are more accurately represented in PSCAD than PSSE.

14 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Power system study


Dynamic Simulation Considerations
Detailed PSCAD model is required.
SMIB model is not sufficient. A full grid model (use E-TRAN) is required to represent the
grid response accurately.
Accurate representation/aggregation of the WPP collector network is required.
Source Code Integrated (SCI) PSCAD models should be used for WTG and PPC.
Site specific voltage/reactive control scheme is required.
Manufacturers specific models for STATCOM, synchronous condensers, and other
reactive plant is required.

Correct protection setting at various locations in grid


The site specific parameter settings for WTG, PPC and all reactive plant derived from the
PSCAD study can then be used (as applicable) to setup the equivalent PSSE model.

15 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Wind Power Plant Solutions


Overview
The solution is tailored for each WPP according to the grid code requirements and the
SCR at the PoC. As such the solution will be different from WPP to WPP.
The WPP solution consists of a combination of the following.

Power system studies in PSCAD;


Coordinated WPP voltage control system;
Site specific tuning of the WTG FRT response;
Reactive plant. STATCOM, Synchronous condensers, cap banks, etc;
WPP active power derating when the grid voltage goes outside the continuous
operating range;
WTG transfomer tap selection;
Substation transformer OLTC performance.

16 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Wind Power Plant Solutions


Coordinated WPP Control System

Typical WPP control


concept for weak grid:
Power Plant Controller
(PPC) is master controller
and STATCOM is the slave
controller for V control.
The PPC sends Qref to
STATCOM.
The PPC controls the cap
banks.
Synchronous condenser is
left to control its own terminal
voltage.
STATCOM is used for fast
dynamic voltage control
during and post fault.
Capacitor banks plus WTG
Q support is mainly used for
steady state voltage control.

17 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Standard synchronous
condenser AVR response
time is used.
PPC Q control should use
a rise time according to
grid code or contingencies
analysis. .
PPC controls the WTG P
dispatch.

Wind Power Plant Solutions


Tuning WTG FRT response
During the fault the WTG reactive current injection is
limited to avoid overvoltage tripping on fault clearance
or voltage instability during the fault recovery period.
The WTG active current injection ramp rate is reduced
to limit the voltage change and to allow enough time for
the STATCOM to stabilise the voltage during the fault
recovery period. No WTG LVRT control retriggering.

18 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Wind Power Plant Solutions


Reactive Plant
STATCOM.
Provides steady state and dynamic voltage regulation.
STATCOM is used for fast dynamic voltage control during and post fault for a smooth
fault recovery.
Synchronous Condenser.
Provides steady state and dynamic voltage regulation.
Used to increase the fault level and inertia, and to reduce the voltage angle shifts to
ensure the WTG stays synchronised for the FRT event.
H as high as possible, H>3 secs; Xd as low as possible <10%, Xd < 15%.
Capacitor bank.
Provides steady state voltage support.
Typically under normal operation Q losses are compensated with 10% by STATCOM,
50% by cap bank, and the rest by Syncon.
19 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Wind Power Plant Solutions


Example - WPP - Overview
SCR at PoC is 1.7.

Reactive plant:
3 5 MVAr STATCOMs
5 9 MVAr cap banks
1 20 MVA Syncon

20 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

PUBLIC

Wind Power Plant Solutions


Example WPP Voltage angle shift issue
Large and fast voltage angle
shift can result in pole slip
of synchronous machines
including the syncon and
WTG PLL controller
instability.

21 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

Reverse power and angle shift


pole slip

PUBLIC

Wind Power Plant Solutions


Example WPP Voltage angle shift solution
Increase the inertia for the
synchronous condenser to
reduce the angle shift. The
inertia constant (H)
increased from 3 to 3.93 s
Within the timeframe before
pole slip, P can be reduced
by advancing the WTG
LVRT control activation
voltage to 0.89 pu (default is
0.85 pu)

22 Connecting Wind Power Plants to Weak Grids, Vestas Wind Systems

angle shift limited to


~30degrees no pole slip

PUBLIC

Thank you for your attention. Questions?


Vestas WPP solutions can be connected to a weak
grid and successfully comply with the grid code.
Vestas Wind Systems A/S. All rights reserved.
This document was created by Vestas Wind Systems A/S on behalf of the Vestas Group and contains copyrighted material, trademarks and other proprietary information. This document or parts thereof may not be reproduced, altered or
copied in any form or by any means without the prior written permission of Vestas Wind Systems A/S. All specifications are for information only and are subject to change without notice. The use of this document by you, or anyone else
authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The document is provided as is and Vestas Wind
Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the document by you. Vestas Wind Systems A/S does not make any representations or extend any warranties, expressed or implied, as to the
adequacy or accuracy of this information. Certain technical options, services and wind turbine models may not be available in all locations/countries.

PUBLIC

S-ar putea să vă placă și