Documente Academic
Documente Profesional
Documente Cultură
INTRODUCTION
Ltd. We have a huge client base were KSB Pumps Boosters, Pumps and
control panels has been supplied and
many mechanical and
electrical field installations were executed at their projects.
have
been
working
in
different
fields
starting
from
PRODUCTION DEPARTMENT
PUMPS AND CONTROL
FIRST WESTERN G.C. guarantees that all KSB products submitted and supplied
are original KSB Pumps Arabia products.
Pumps origin
Control panels
VFDs
Electric motors
Assembly
Warranty
Best regards,
the Text Box Tools tab to change the formatting of the pull quote text box.]
PROJECTS DEPARTMENT
ELECTROMECHANICAL AND PIPING WORKS.
SWCC SHOIBA
BARGES INFRASTRUCTURE AND PUMP STATION
Located in on the western coastal city (Shoiba) and within the
restricted zone at Saline Water Conversion Corp- SWCC we have
executed a challenging project Barges Infrastructure.
Our performance was more than professional as we were able to
hand over the pipe net work, valves, pumps and lamination work in a
detailed and closely followed schedule under exhausting pressure
from authorities to deliver this critical project.
Such performance and both engineering and personal awareness
enabled us to gain both the project owner and the authorities trust
which led to assigning us to take the responsibility of doing the same
challenging project in the southern city of Shoqaiq.
A complete barge loaded desalination plant of 30,000 cu.m/day was
connected through sea laid 6 flexible PE 100 tubes of 125 mm size to a
common GRP 700 mm shore anchored header.
The header was connected through 700 mm GRP pipes to SWCC
strategic potable water tank.
Excavation of soil with many under ground utilities and road crossings
as well as above round laid GRP 700 mm pipes.
SWCC SHOQAIQ
BARGES INFRASTRUCTURE AND PUMP STATION
120 KM North of southern city of Gizan lays a coastal city of Shoqaiq
embracing one of SWCC Saline Water Conversion Plants.
As every project has its own unique aspects and governing
environment, we have executed the infra-structure and mechanical
work by using PE 100 pipes instead of GRP as we have previously done
in SWCC-SHoiba.
More than 3,200 LM of 500 mm PE100 pipes were shipped from Jeddah
to SWCC-Shoqaiq.
Complete excavation, bedding, pipe laying, compacting and backfilling were done.
Our Scope of Work included:
1) Supply and installation of 125 mm PE100 flexible hoses from sea
anchored Barge to the shore area.
2) Fabrication and installation of Steel Header located on top of barge.
3) Polyethylene fusion welding of 500 mm PE joints. More than 270 joints
were welded both above and under ground.
4) Casting and laying of pipe concrete supports with steel clamps.
EXCAVATION WORKS AND PIPING WORKS OF 700 MM GRP POTABLE WATER LINES SWCC SHOIBA - 2008
GRP 700MM PIPING (LAMINATION TYPE) WITH SS316 CLAMPS AND CONCRETE SUPPORTS
POTABLE WATER LINES (SWCC SHOIBA) - 2008
00
INSTALLATION OF COMRESSED AIR SYSTEM UNITS AT BANAWAI PACKAGING FACOTRY JEDDAH 2010
INSTALLATION OF 125MM PE PIPES NETWORK FROM SWCC AREA TO FLOATING BARGE AT YANBU 2010