1.1
1.1.1
Description
CONTRACTUAL REQUIREMENTS
Performance Bond
a)Bankers/Insurance/Financial Institution Guarantee*or
b)Performance Guarantee Sum *
1.1.2
Insurances
Miscellaneous
To Collection
Page BQ1 1/1
Amount (RM)
:JKR/SEL/651/2009
TARIKH NILAIAN
: 28.04.2009
BAYARAN KEM.
: NO. 1
Item
Description
Unit
Qty
Rate
Amount
1.8.1
L.S
5,000.00
1.8.2
L.S
1,400.00
1.10
L.S
5,000.00
L.S
5,000.00
L.S
200,000.00
1.13.2
L.S
14,000.00
1.13.4
L.S
10,000.00
1.13.5
L.S
7,000.00
1.12
1.13
1.13.1
To Collection
Page BQ1 2/3
247,400.00
:JKR/SEL/651/2009
TARIKH NILAIAN
: 28.04.2009
BAYARAN KEM.
: NO. 1
Item
Description
Unit
Qty
Rate
247,400.00
1.15
Project signboard
Provide ,erect and maintain 1 nos project signboard as shown on the
drawings as per specification section 1 clause 1.23
Amount
nos
###
3,000.00
1.15.1
L.S
1,000.00
1.15.2
L.S
2,000.00
L.S
5,000.00
1.16
1.16.1
Submit as-built drawings, microfilm of the works and computer soft copy
(Specification section 1 clause 1.25)
1.18
1.18.1
Provide and maintenance of access to and within site for works and
removel on completion as per clause 1.33 of the special provision to the
general specification
L.S
10,000.00
1.18.2
L.S
2,500.00
1.19
1.19.1
L.S
30,000.00
L.S
42,500.00
1.20
1.20.1
1.21
Clearing of site
(Specification section 1 clause 1.26)
1.21.1
L.S
To Collection
5,000.00
348,400.00
Total Work
Done (%)
0%
0%
0%
0%
0%
0%
0%
0%
Total Work
Done (%)
0%
0%
0%
0%
0%
0%
0%
0%
0%
Amount Claim
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amount Claim
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PROJEK :
Description
2.0
TRAFFIC MANAGEMENT
(JALAN BUKIT PERAH AND JALAN BUKIT PERAH 1)
Management
Plan'
including
Unit
Qty
Rate (RM)
for
installation
Kurangkan Laju
nos
b)
Pembinaan Di Hadapan
nos
c)
Awas
nos
d)
Kon
nos
50
e)
nos
12
L/Sum
To Collection
Page BQ2 1/1
Amount (RM)
PROJEK :
2.1
Description
Unit
Qty
Rate (RM)
Amount (RM)
TRAFFIC MANAGEMENT
(JALAN SERI GAMBUT)
Management
Plan'
including
for
installation
Kurangkan Laju
nos
b)
Pembinaan Di Hadapan
nos
c)
Awas
nos
d)
Kon
nos
50
e)
nos
12
L/Sum
To Collection
Page BQ 2/2
Description
Unit
3.0
3.0.1
Qty
Rate (RM)
Amount (RM)
a) Mechanical Paver
b) Tandem Roller
c) Pneumatic Roller
d) Motorist Sprayer
e) Backpusher
f) Mobilazation and Demobilization.
3.0.2
To Collection
Page BQ3 1/1
PROJEK :
BILL NO.3 - Treatment To Existing Road Pavement And Resurface Road Premix.
(All Quantities Are Provisional Except Lump Sum Items)
Item
3.1
3.1.1
Description
TREATMENT TO EXISTING
RESURFACE ROAD
ROADPREMIX
PREMIX.
(JALAN SERI GAMBUT)
Unit
PAVEMENT
Qty
Rate (RM)
Amount (RM)
AND
a) Mechanical Paver
b) Tandem Roller
c) Pneumatic Roller
d) Motorist Sprayer
e) Backpusher
f) Mobilazation and Demobilization.
3.1.2
To Collection
Page BQ3 2/2
Unit
Qty
Nos.
50
Nos.
30
Nos.
50
Nos.
30
Rate
To Collection
Amount (RM)
5.0.1
5.0.2
Description
Unit
Qty
Rate
ROAD MARKING.
(JALAN BUKIT PERAH AND JALAN BUKIT PERAH
1)
Supply all equipment,materials,machineries
and labour for road marking lines 'Refectorized
Thermoplastic' type 3.0mm thick.
i) Edge Line 150mm wide
5.1
ROAD MARKING.
(JALAN SERI GAMBUT )
5.1.1 Supply all equipment,materials,machineries
and labour for road marking lines 'Refectorized
Thermoplastic' type 3.0mm thick.
i) Edge Line 150mm wide
ii) Stop line 300mm wide
iii) Centre Line 100mm wide
m
m
m
To Collection
Page BQ5 1/1
Amount (RM)
Description
Unit
Qty
5.1.2
m
m
m
To Collection
PROJEK :
Description
6.1
ROAD FURNITURE
(JALAN BUKIT PERAH,JALAN BUKIT
PERAH 1 AND JALAN SERI GAMBUT)
Unit
Qty
no
no
no
no
no
no
5
5
6
Rate (RM)
Amount (RM)
a)
b)
c)
d)
e)
f)
RP 1 (BERHENTI)
WD 17 (AWAS)
ROAD JUNCTION ON THE LEFT AND RIGHT(WD.27a)
WD 39a or WD.39b (CHEVRON DELINEATOR)
WD 44 (CHEVRON)
WD.1 ( UNEVEN ROAD)
To Summary
Page BQ6 1/1
PROJEK :
Description
6.1
Unit
Qty
no
no
no
no
no
no
5
5
6
Rate (RM)
Amount (RM)
a)
b)
c)
d)
e)
f)
RP 1 (BERHENTI)
WD 17 (AWAS)
ROAD JUNCTION ON THE LEFT AND RIGHT(WD.27a)
WD 39a or WD.39b (CHEVRON DELINEATOR)
WD 44 (CHEVRON)
WD.1 ( UNEVEN ROAD)
To Summary
Page BQ5 1/1
DESCRIPTION
PAGE NO.
BQ 1 - 1/1
TRAFFIC MANAGEMENT
BQ 2 - 1/1
BQ 3 - 1/1
AMOUNT
(RM)
CORING TEST
BQ 4 - 1/1
ROAD MARKING
BQ 5 - 1/1
ROAD FURNITURE
BQ 6 - 1/1
RINGGT MALAYSIA :
CONTRACT PERIOD :
WEEKS
DATE :