Federal Register / Vol. 70, No.

155 / Friday, August 12, 2005 / Notices 47187

Committee will conduct the meeting to should submit an original and 14 copies intervention or motion to intervene, as
facilitate the orderly conduct of of the protest or intervention to the appropriate. Such notices, motions, or
business. Public comment will follow Federal Energy Regulatory Commission, protests must be filed on or before the
the 10-minute rule. 888 First Street, NE., Washington, DC comment date. Anyone filing a motion
Minutes: The minutes of the meeting 20426. to intervene or protest must serve a copy
will be available for public review and This filing is accessible on-line at of that document on the Applicant and
copying within 30 days at the Freedom http://www.ferc.gov, using the all the parties in this proceeding.
of Information Public Reading Room; ‘‘eLibrary’’ link and is available for The Commission encourages
Room 1E–190; Forrestal Building; 1000 review in the Commission’s Public electronic submission of protests and
Independence Avenue, SW.; Reference Room in Washington, DC. interventions in lieu of paper using the
Washington, DC, between 9 a.m. and 4 There is an ‘‘eSubscription’’ link on the ‘‘eFiling’’ link at http://www.ferc.gov.
p.m., Monday through Friday, except web site that enables subscribers to Persons unable to file electronically
Federal holidays. receive e-mail notification when a should submit an original and 14 copies
Issued at Washington, DC on August 9, document is added to a subscribed of the protest or intervention to the
2005. docket(s). For assistance with any FERC Federal Energy Regulatory Commission,
R. Samuel, Online service, please e-mail 888 First Street, NE., Washington, DC
FERCOnlineSupport@ferc.gov, or call 20426.
Deputy Advisory Committee Management
Officer. (866) 208–3676 (toll free). For TTY, call This filing is accessible on-line at
(202) 502–8659. http://www.ferc.gov, using the
[FR Doc. 05–16043 Filed 8–11–05; 8:45 am]
Comment Date: 5 p.m. eastern time on ‘‘eLibrary’’ link and is available for
BILLING CODE 6450–01–P
August 19, 2005. review in the Commission’s Public
Reference Room in Washington, DC.
Linda Mitry,
DEPARTMENT OF ENERGY There is an ‘‘eSubscription’’ link on the
Deputy Secretary.
Web site that enables subscribers to
[FR Doc. E5–4361 Filed 8–11–05; 8:45 am] receive e-mail notification when a
Federal Energy Regulatory
Commission BILLING CODE 6717–01–P document is added to a subscribed
docket(s). For assistance with any FERC
[Docket No. NJ05–4–000] Online service, please e-mail
DEPARTMENT OF ENERGY FERCOnlineSupport@ferc.gov, or call
United States Department of Energy, (866) 208–3676 (toll free). For TTY, call
Bonneville Power Administration; Federal Energy Regulatory
Commission (202) 502–8659.
Notice of Filing Comment Date: 5 p.m. eastern time on
August 5, 2005. [Docket No. EC05–116–000] August 23, 2005.
Take notice that on July 29, 2005, the Cottonwood Energy Company LP, Linda Mitry,
Bonneville Power Administration Magnolia Energy LP, Redbud Energy Deputy Secretary.
(Bonneville) filed a petition for a LP, Kelson Holdings, LLC; Notice of [FR Doc. E5–4360 Filed 8–11–05; 8:45 am]
declaratory order maintaining Filing BILLING CODE 6717–01–P
reciprocity approval of its Open Access
Transmission Tariff (OATT) and an August 5, 2005.
exemption in lieu of a filing fee with the Take notice that on August 2, 2005, DEPARTMENT OF ENERGY
Commission. Bonneville states that it Cottonwood Energy Company LP,
has revised Attachment K to its OATT Magnolia Energy LP, Redbud Energy LP, Federal Energy Regulatory
in accordance with the 2006 and Kelson Holdings, LLC (Applicants) Commission
transmission and ancillary services rate submitted an application pursuant to
[Docket No. CP05–395–000]
case settlement. section 203 of the Federal Power Act for
Any person desiring to intervene or to authorization of an indirect disposition Dominion Cove Point LNG, LP; Notice
protest this filing must file in of jurisdictional facilities. Applicants Of Application
accordance with Rules 211 and 214 of state that the proposed indirect
the Commission’s Rules of Practice and disposition of jurisdictional facilities August 5, 2005.
Procedure (18 CFR 385.211, 385.214). will occur in connection with the sale Take notice that on July 26, 2005,
Protests will be considered by the by Maple Power Holdings LLC of all of Dominion Cove Point LNG, LP (Cove
Commission in determining the its interest in InterGen (North America), Point LNG) filed an application in
appropriate action to be taken, but will Inc., (which will be renamed Mayflower Docket No. CP05–395–000, pursuant to
not serve to make protestants parties to Energy, Inc.) which is the upstream section 3 of the Natural Gas Act (NGA),
the proceeding. Any person wishing to owner of Cottonwood Energy Company for authority to construct, install, own,
become a party must file a notice of LP, Magnolia Energy LP, Redbud Energy operate and maintain certain facilities at
intervention or motion to intervene, as LP. the Cove Point LNG import terminal at
appropriate. Such notices, motions, or Any person desiring to intervene or to Cove Point, Maryland (Vaporizer
protests must be filed on or before the protest this filing must file in Reactivation Project). The details of this
comment date. Anyone filing a motion accordance with Rules 211 and 214 of proposal are more fully set forth in the
to intervene or protest must serve a copy the Commission’s Rules of Practice and application that is on file with the
of that document on the Applicant and Procedure (18 CFR 385.211, 385.214). Commission and open to public
all the parties in this proceeding. Protests will be considered by the inspection.
The Commission encourages Commission in determining the The filing may also be viewed on the
electronic submission of protests and appropriate action to be taken, but will Web at http://www.ferc.gov using the
interventions in lieu of paper using the not serve to make protestants parties to ‘‘eLibrary’’ link. Enter the docket
‘‘eFiling’’ link at http://www.ferc.gov. the proceeding. Any person wishing to number excluding the last three digits in
Persons unable to file electronically become a party must file a notice of the docket number field to access the

VerDate jul<14>2003 17:14 Aug 11, 2005 Jkt 205001 PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 E:\FR\FM\12AUN1.SGM 12AUN1
47188 Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices

document. For assistance, please contact obtain legal status by becoming a party DEPARTMENT OF ENERGY
FERC Online Support at to the proceedings for this project
FERCOnlineSupport@ferc.gov or toll should, on or before the comment date, Federal Energy Regulatory
free at (866) 208–3676, or TTY(202) file with the Federal Energy Regulatory Commission
502–8659. Commission, 888 First Street, NE., [Project No. 2114–126]
Any questions regarding this Washington, DC 20426, a motion to
application should be directed to Anne intervene in accordance with the Public Utility District No. 2 of Grant
E. Bomar, Managing Director, requirements of the Commission’s Rules County, WA; Notice of Application for
Transmission, Rates and Regulation, Approval of Contracts for the Sale of
of Practice and Procedure (18 CFR
Dominion Resources, Inc., 120 Tredegar Power for a Period Extending Beyond
385.214 or 385.211) and the Regulations
Street, Richmond, Virginia 23219, or by the Term of the License
phone at (804) 819–2134. under the NGA (18 CFR 157.10). A
The Vaporizer Reactivation Project is person obtaining party status will be August 5, 2005.
designed to refurbish and reactivate two placed on the service list maintained by Take notice that on July 8, 2005,
unused waste heat vaporizers that were the Secretary of the Commission and Public Utility District No. 2 of Grant
originally installed at the Cove Point will receive copies of all documents County, Washington (Grant PUD) filed
LNG Terminal in the 1970s. These filed by the applicant and by all other with the Commission an application for
vaporizers will use combustion exhaust parties. A party must submit 14 copies approval of contracts for the sale of
heat from the gas turbine generators to of filings made with the Commission power from its licensed Priest Rapids
indirectly vaporize LNG. The proposed and must mail a copy to the applicant Project No. 2114, for a period from the
project will provide spare vaporization and to every other party in the expiration of its existing license on
capability that will create an proceeding. Only parties to the October 31, 2005 through the term of
opportunity to firm up sendout from the proceeding can ask for court review of any new license issued to it for the
facility, during times when the Commission orders in the proceeding. project. The project is located on the
vaporization facilities would otherwise Columbia River in Chelan, Douglas,
be limited by normal maintenance Persons who wish to comment only Kittitas, Grant, Yakima, and Benton
requirements. Cove Point LNG says that on the environmental review of this Counties, Washington.
reactivating these waste heat vaporizers project, or in support of or in opposition Section 22 of the FPA, 16 U.S.C. 815,
will enable Cove Point LNG to provide to this project, should submit an provides that contracts for the sale and
up to its current peak-day capability of original and two copies of their delivery of power for periods extending
1.0 MMDth/day of sendout for which it comments to the Secretary of the beyond the termination date of a license
is currently authorized on a year-round Commission. Environmental may be entered into upon the joint
basis, subject only to certain excused commentors will be placed on the approval of the Commission and the
interruptions. Cove Point LNG says that Commission’s environmental mailing appropriate state public service
the Vaporizer Reactivation Project will list, will receive copies of the Commission or other similar authority
not impair the ability of Cove Point LNG environmental documents, and will be in the state in which the sale or delivery
to render service at reasonable rates to notified of meetings associated with the of power is made. Grant PUD has
its existing customers. Commission’s environmental review submitted for Commission approval
Cove Point LNG requests that the process. Environmental commentors three contracts for the sale of power
Commission approve the use of the will not be required to serve copies of from the project which would extend
facilities associated with the Vapor filed documents on all other parties. beyond the term of the existing license
Reactivation Project to support an (Priest Rapids Product Sales Contract,
The Commission’s rules require that
incremental send-out service (ISQ) for Additional Product Sales Agreement,
persons filing comments in opposition
LTD–1 customers under section 4 of the and Exchange Agreement). Grant PUD
NGA. The terms and conditions of the to the project provide copies of their asserts that approval of the submitted
proposed ISQ service are set forth in pro protests only to the applicant. However, contract is in the public interest.
forma tariff sheets modifying Rate the non-party commentors will not Comments and the request for
Schedule LTD–1 in Exhibit P to the receive copies of all documents filed by approval of the power sales contract or
application. Cove Point LNG is also other parties or issued by the motions to intervene may be filed with
proposing that an off-peak firm Commission (except for the mailing of the Commission no later than August
transportation service (OTS) on the environmental documents issued by the 15, 2005, and replies to comments no
Cove Point LNG natural gas pipeline be Commission) and will not have the right later than August 21, 2005. The
approved by the Commission under to seek court review of the Commission’s Rules of Practice require
section 4 of the NGA. The terms and Commission’s final order. all intervenors filing documents with
conditions of the proposed OTS service The Commission strongly encourages the Commission to serve a copy of that
are also set forth in pro forma tariff electronic filings of comments, protests, document on each person on the official
sheets in Exhibit P to the application. and interventions via the internet in lieu service list for the project. Further, if an
Cove Point LNG requests that the of paper. See 18 CFR 385.2001(a)(1)(iii) intervenor files comments or documents
Commission grant the requested with the Commission relating to the
and the instructions on the
authorization at the earliest practicable merits of an issue that may affect the
Commission’s Web site (http://
date, in order to ensure an in-service responsibilities of a particular resource
www.ferc.gov) under the ‘‘e-Filing’’ link.
date on the earlier of : (i) the earliest agency, they must also serve a copy of
practicable date, or (ii) the later of (a) Comment Date: 5 p.m. eastern time on the document on that resource agency.
May 24, 2006, or (b) six months August 26, 2005. All documents (an original and eight
following issuance of the requested copies) must be filed with: Magalie R.
Magalie R. Salas,
authorizations. Salas, Secretary, Federal Energy
There are two ways to become Secretary. Regulatory Commission, 888 First
involved in the Commission’s review of [FR Doc. E5–4365 Filed 8–11–05; 8:45 am] Street, NE., Washington, DC 20426.
this project. First, any person wishing to BILLING CODE 6717–01–P Please put the project name ‘‘Priest