ABSTRACT
Through critical and deep study, this report examines the type of Apparel production
system that are used in apparel industry of India. It shows the analysis and comparison
of production systems with respect to cost, quality and productivity. Since the production
of Apparels mainly depends upon the production system, its selection needs to be done
carefully.
This report is an effort of the students of Bachelor of Fashion Technology (B.FTech.),
National Institute of Fashion Technology, Kangra. It talks about functions of Creative
Clothex, prevalent in Noida, UP.
This study is based on the analysis of the handling time required to complete all the
operations related to apparels, this also focuses on the positive and negative aspects of
apparel industry. It demonstrates that the industry has made significant process towards
comprehending the necessity of proper production system which has implications on the
overall productivity of an apparel industry.
CERTIFICATE
This is to certify that this Project Report titled Apparel Internship is based on our i.e.
Anurag Singh and Avinash Kumars original research work, conducted under the
guidance of Mr. Saurabh Chaturvedi towards partial fulfilment of the requirement for
award of the Bachelors Degree in Fashion Technology (Apparel Production), of the
National Institute of Fashion Technology, Kangra. No part of this work has been copied
from any other source. Material, wherever borrowed has been duly acknowledged.
Signature of Students
____________________
_______________________
Mentor
Name Mr. Saurabh Chaturvedi
Associate professor
National Institute of Fashion Technology, Kangra
Acknowledgement
We would like to add a few heartfelt words for the people who helped us to complete
this project.
We wish to express our gratitude to everybody who has assisted us in the learning
process during this internship. There are many to whom expression of gratitude is
inevitable, but there are some special people who have to be given prominence, without
whom we would not have reached the conclusion of this project so quickly and
efficiently. We wish to thank our Course Coordinator and mentor, Mr. Saurabh
Chaturvedi for providing this wonderful opportunity and encouraging & motivating us.
No amount of Gratitude is adequate for Mr. Mohit Singhal, Managing Director,
Creative Clothex, for his consent in allowing us to conduct our internship in their
esteemed company.
We are grateful to Ms. Tanushree Mitra, Head PPC Department for providing us with
all facilities required during our internship period.
CONTENTS
Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Topic
Introduction
Company profile
About Company
Creative vision
Creative social responsibilities
Key strength
Product range
Major buyers
Company hierarchy
Organization hierarchy
Department study
Merchandising
Sampling
CAD
Fabric sourcing
Fabric stores
Purchase
Trims and accessories store
IE
Accounts
Human resource management
Production planning & control
Production
Finishing and packaging
Maintenance
Projects
Project - 1
Introduction
Objective
Process flow
Data collection
Capacity study
Observations & Suggestions
Layout study
Results
Project - 2
Introduction
Problem definition & methodology
Identification of defects by DMAIC process
Define phase
Measure phase
Analyze phase
5
Page no.
06
07
08
09
09
10
10
12
13
14
19
32
37
39
42
45
49
53
59
61
66
88
106
109
135
136
137
138
139
141
149
150
159
41
42
Improve phase
Control phase
INTRODUCTION
6
As per our course curriculum fourteen weeks internship is mandated, which aims
practical understanding of various processes related aspects of the industry. Internship
enables students to get a better understanding of a company, and also gaining
knowledge on its functioning.
We have chosen to pursue our internship at Creative Clothex at Noida, Uttar Pradesh.
As this company is Indias largest manufacturer for Adidas Group in the domestic
market. In compilation of this Internship report, all our efforts have been made to
present a comprehensive picture of the activities undertaken at Creative Clothex.
OBJECTIVE OF INTERNSHIP
Gain in-depth knowledge of the working of the industry in terms of
Organization structure
Infrastructure
Material & manufacturing process
Departmental study
Quality control
CSR
COMPANY PROFILE
Creative Vision
Be Number one, in providing Whole Life value to our people so as to nurture their
individual potential and aspirations and synthesize them towards creating an Organic
Organization .
To be Number one, in delivering Value to our clients, with state of the art Apparel
Manufacturing Facilities and world class services in India. We define value as the
composite of price, Quality, Quick response, Reliability and Newness.
We firmly believe value can be created only if we forge a trust based network of
relationships, both with clients and suppliers, with complete transparency and common
vision based on the principle of equitable sharing of gains, so that all energies can be
focused on the product and service. In doing so, adopting a Participative Mode, rather
than a Linear Mode of working.
Creative Social responsibility
At Creative, We believe in fair employment opportunities for one and all and providing
necessary infrastructure and a healthy and safe work environment to all. We have been
following Adidas Standards of Engagement manuals and have been an Adidas
approved factory for labour compliance and Health and Safety compliance.
In Addition to this we are ourselves dedicated in providing good work environment to all
our workers. In the end we can sum up by saying that Creative is continuously gearing
itself to deliver a more value-added, wider range of finished products. Driven by the ever
growing needs of our customers in terms of newer fashions, fabrics, colors, styles we
constantly create new synergies blending our strengths and creative ideas for faster
deliveries and reducing costs by enhancing quality and improving productivity.
KEY STRENGTHS
Creative Clothex is one of the largest manufacturers for Adidas group in India.
Creative Clothex is one of the most successful professionally managed
companies in India.
Well qualified trained and committed professionals with a shared vision.
Highly qualified Design team, Product development skills.
All Department and offices are electronically linked to facilitate all time access to
information
Focus on quality and a proven track record.
PRODUCT RANGE
10
The Company has its own active brand named AURRO and AEGLE.
COMPANY HEIRARCHY
OWNER
FINANCE HEAD
CASHIER HEAD
ACCOUNTS
OFFICER
AUDITOR
HEAD
ADMINISTRATI
ON
HEAD
OPERATIONS
MERCHANDISI
NG HEAD
SOURCING
HEAD
SENIOR
MERCHANTS
FABRIC
SOURCING
JUNIOR
MERCHANTS
TRIM
SOURCING
LOGISTICS
MANAGER
DOCUMENTATI
ON
ASSISTANTS
HR MANAGER
COMPLIANCE
MANAGER
ADMIN
OFFICEER
11
12
MERCHANDISING DEPARTMENT
A merchandiser is an interface between the buyer and the supplier who has to ensure the quality
of production and timely delivery. Merchandising is a process through which products are
planned, developed, executed and presented to the buyers. It includes directing and overseeing
the development of product line from start to finish.
ROLE OF THE DEPARTMENT
OBJECTIVE OF MERCHANDISER
To create market
Understanding buyers requirements
Sourcing of materials, fabrics
Select the range
Creating the product
Taking buyers approvals
Negotiation with buyer
Procuring the orders
Materializing the order
Execution the order
Coordination between production and production planning department
Dispatching the shipment
After shipment dispatching merchandiser is also responsible for buyer claims, profit and
subsequent orders. If buyer has any problem in quality of the product then it is the responsibility
of the merchandiser to resolve the problem with the buyer.
This department is the main link between the factory and the buyers. The buyers rely on
the merchandisers to provide them with the information regarding the capacity available,
the style feasibility and the setting up of delivery dates for the shipment.
This process involves receiving the initial order details from the buyers representative
and communicating through E-mail and telephonic conversations.
The merchandising team keeps the buyer updated about all the developments taking place
regarding the order.
The order booking and the order confirmation details are received by the merchandising
team who further transfers this information to the other departments.
2) PREPARATION OF BILL OF MATERIALS:
The merchandising team receives the details of all the style features in the particular
Fabric consumption per garment for each size from the sampling section, Thread
consumption per garment from the Planning department and the accessories requirement
per garment from the sampling department.
Based on this information received, the merchandiser prepares a Bill of Materials (BOM).
This has the complete details of the requirement of all the parts going into the making of
the garment. Each of the material is stated above is mentioned per garment.
3) COORDINATING THE SAMPLE DEVELOPMENT PROCESS:
The merchandising department plans and coordinates the activities of the sampling
department.
The sampling section is given the TECHPAK which contains all the relevant details.
14
The samples to be made are planned in the merchandising department and the plan is
given to the sampling section.
The samples are sent to the merchandising department for initial approvals according
to the spec sheet provided by the buyer. The nsamples are sent to the buyer for
approvals only when they are approved by the merchandising department.
The sampling department is also informed by the merchandising about the types of
samples required by the buyer.
The merchandiser receives the buyer comments for all the samples and makes it sure
it is informed to the sampling and the necessary changes made in all the required
areas.
4) INTERPRETING THE TECHPAK / TECHNICAL FOLDER PROVIDED BY THE
BUYER:
The Technical Folder/Tec pack is the reference for each department whenever it comes to
any information about the buyer requirements. The buyer states all his requirements in a
very precise manner which is contained in this document. The following are the common
details which are found in the Technical Folders of all the buyers:
Size wise quantity
Color Wise Quantity
Destination wise quantity
Dispatch dates for all the lots and the quantity for the lots
Total Order quantity
Cutting Details
Construction Sheet
Finishing and Packing Details
Specification Sheet
Measurement Chart
Fabric Details
a. GSM of all the types of fabrics used in the garment
b. Fabric construction
c. Fiber types
d. Fabric width
e. Fabric/garment finish type and hand feel description
f. Buyer nominated supplier (in certain cases)
g. Fabric Swatch
Trims Details
a. Button Size
b. Threads used
c. Thread tkt no.
d. Labels details
15
e. Trims Swatches
Accessory Details
COSTING
Zipper
Accessories
Buttons
Threads
Trims
Size Label
Total Cost
Labels
Embroidery
Company Tag
Packaging
Fabric Cost
Washing
Cut Make Cost
COSTING SHEET
The costing sheet is the addition of all the costs involved in the making of the garment and then
it is coated to the buyers. It contains per piece and the total cost (of all the pieces). It includes the
details like, cost of fabric, trims, washing, embroidery, sampling, testing, freight, duty, insurance
etc.
Basic costs while calculating costing are 1. Factory costs
2. Trim costs
3. Yield costs
16
4. Cost of embroidery
1. FACTORY COST: - Factory cost includes cutting cost, making cost , packing cost. It
depends basically on the style. The complex the style, higher the rate proportions.
2. TRIMS COST: - Trims can be both local and imported. Imported trims can be duty free
or otherwise. It includes label cost, accessories cost, button cost, Zipper cost, washing
cost etc. Trims cost is taken including wastage. The nominated supplier of trims of Pearl
Global Ltd. Is AVERY DENNISON.
3. YEILD COST: - It is an estimation of average consumption of fabric. It is decided by
preparing a mini marker which includes wastage of fabric due to laying, cutting, fabric
defect, end cutting loss, marker loss. Average of 10% extra margin is taken.
4. COST OF EMBROIDERY: - Cost of embroidery includes the machine depreciation
cost, and it is proportional to the number of stitches used. The time taken from the
coming of the order to the day of shipment is 2-3 months. Basically this is the total
processing time of the sample from approval of the sample. 45 days are kept by the
merchandiser for the production. Embroidery cost for one logo of Adidas group is 6 rs. /
Unit. Fabric is the main cause of delay so merchandiser keeps few days for the safer side.
The merchandiser also coordinates with the Production Planning department, Quality
department, Fabric department, Production department, Finishing department, washing
department. The merchandiser also to keeps a track of the styles and make sure
everything moves as per order on time.
MANUFACTURING COST
The manufacturing costing is done according to the assumed SMV which is given by IE viz. if
the garment SMV is 6 min then actual manufacturing cost will be 60 i.e. 9-10 mark up is
multiplied with SMV. The cost which is charged from buyer is 200 by adding 25% profit.
Costing is done
I.
Style-wise Costing
In pre-cost, includes actual fabric cost, trims cost and value added cost like handwork, artwork,
add a work, embroidery etc.
17
Pre-Cost
The costs involved in each process are
Stitching cost/piece + 25%
Cutting cost
Finishing cost
Direct Cost (Manpower Department wise)
Indirect Cost (Sub Department)
Overheads (Plant+ M/c rent+ Electricity+ Water + Fuel)
MERCHANDISE COST
When pattern master prepared the pattern and the sample is made according to the pattern. Then
mini- marker is prepared in CAD and average costing is being done.
The average costing is done by below formulae{Total length + margin (5cm)} * {Total width + Margin (5cm)}* GSM/ 10000 = A
A/no. of pieces = Total cost of the garment
Merchandise prepared the costing sheet including factory cost, Trim cost, Yield Cost and
embroidery cost. Then the costing sheet is send to the buyer and if the cost satisfies the buyer
then only order of that product is given.
SAMPLING DEPARTMENT
18
Proto Sample
Salesman sample(SMS)
Fit Sample
Pre Production Sample
Size Set
TOP Sample
Shipment Sample
19
Fit Sample:
While fabric and trim ordering is happening, simultaneously the sample approval procedure is
also underway. The moment a style is selected it goes to the tech department for fitting. Here
models wear the samples and they are evaluated in terms of fit, construction, measurement. The
buyer then sends out comments, which are called as fit comments. In case another sample is
requested the factory makes the same incorporating the comments and send again to buyer. This
process is called fit cycle. Different customers have different no of fit cycles.
PP Sample:
20
Once the fit sample is approved the factory makes a PP (Pre-production) sample. This can be
called by different names such as sealer sample, green tag sample etc. This sample is sent out the
buyer for final approval and once approved becomes the final sample on the basis of which entire
production is made and audited. This is the most important sample and one should take care that
everything on this sample is correct as this then becomes the standard.
Once PP sample is approved the next step is to make a SIZE SET. All the fit samples and the PP
samples are in the medium size, now the medium size is these are then graded into the different
sizes as per the purchase order. But this all activity of size-set is done in the pre-production
execution department after the pp approval.
Size Set sample:
This sample is made in all the sizes. It is done to check the fit of all the sizes. Fabric and trims
need not be as required for actual production.
THE DETAILS ATTACHED TO THE GARMENT SAMPLE
After the confirmation of order, each sample sent to the buyer has the following details attached
to it, with the help of a tag. It contains the details pertaining to both, what the buyer has
demanded and what supplement fabric/trim etc they have used (if applicable).
Ref no.,
Color
Fabric :Composition
Description
Quantity
Style no/ Size
Machine details
There were a total of 20 machines in the sampling department.
10 operators
14 SNLS without UBT, 2 Overlock, 2 Kansai(waistband elastic attachment & stripes
attachment, 1 buttonhole m/c, 1 flatlock
1 cutting table
21
CAD DEPARMTENT
GARMENT EXPORTS has its own CAD department for varied style garments are made with
help of Richpeace software package.
Firstly the merchandiser sends the following documents to the CAD room:
Approved style sheet and spec sheet containing all the measurements.
Graded measurement spec sheet.
Fabric detail sheet containing information like fabric form
(Open roll or folded form), roll size, GSM, type of fabric, style no, vendor, buyer etc.
PROCESS CHART
Digitizing
Grading
Marker Making
Plotter
DIGITIZING
Digitizing is a process of implementing the pattern of a particular style which are fed into the
computer system by using a digitizer and specially designed cursor for computerized marker
making. The paper patterns are placed on digitizer with the help of magic tape. The care must be
taken while placing the pattern on the digitizer board. The pattern should be free from any folds
and the grain line of the patterns should be parallel to x-axis. Pattern information such as an
order name, pattern description, and grain line are fed into the system. Every corner of the
pattern is traced by the cursor so as to get the exact shape of the pattern. Once all the information
is correctly fed into the system, then only the computer software accepts the particular pattern
and saves it on the system. These digitized patterns are thus ready for grading.
GRADING
Grading means the stepwise increase or decrease of a master pattern pieces to create larger or
smaller size. The starting point can be the smallest size or the middle size. Grading alters the
overall size of a design but not its general shape and appearance.
ORDER AND PROCESSING OF MARKER
Pattern information is put. Models are formed by grouping and lay limits are set.
PLOTTING
23
The marker is printed with the help of Gerber plotter and spread on top of the lay. This helps in
recognition of garment parts after cutting.
MARKER MAKING
Marker is the best possible arrangement of all pattern pieces in the available width of the fabric
so has to utilize minimum fabric and reduce fabric wastage. All the required information is fed
into the system by the digitizing. The patterns are ready for marker making. Individual pieces can
be moved around the screen using a mouse, to produce an optimized layout the system is
programmed to calculate material utilization i.e. efficiency and cutting waste. Before making the
final marker, a combination of pattern arrangements, in a given width, are made so as to achieve
maximum efficiency.
24
PROCESS FLOW
Receive
patterns
Digitize
pattern to
feed in
Pattern
correction
Pattern
grading
Output to
Graphtec
plotter
Cut ratio
planning
Marker
planning
according to
the cut plan
Output
marker to
plotter
WORK FLOW
IN CAD
DEPARTMENT
Send to
cutting room
for cutting
Pattern sent
to
merchandiser
for sampling
Output mini
marker to
printer
Send to
merchandiser
for costing
25
26
FABRIC STORE
Fabric Store maintains the fabric coming from the suppliers. It enters the data regarding the
inward and outward movement of the fabric in the specified quantity, both to and from the
departments.
It stores the fabric in such a way so as to make the identification of the fabric rolls easy and the
person issuing the rolls does not waste time searching for them. They also receive the unused
fabric not required any further from the production floor. Their responsibility is to maintain the
fabric till a suitable time, because the same fabric can be used to create samples for the buyers in
case the fabric meets the required quality. As soon as the fabrics are received by the stores, each
roll is checked for width and length is mentioned in the reports. In case of large variance between
the mentioned width and the observed width, the supplier is informed.
Heat Shrinkage
Shade Batching for the whole lot
Stocking of inspection rolls to the allotted racks
Fabric issue
Tracking method followed in the stores:Currently the system being followed is that of using a BIN CARD. All the details mentioned in
the Bin Card are filled up in the card and the card is stuck on each roll of fabric. This is in the
form of a hard paper sheet pre printed with all the parameters. Each roll can be distinctly
identified by having a look at the Bin Card. Whenever any person is sent to issue a roll, he just
has to read the basic details mentioned on the card. The fabric is stacked in the racks according to
buyer.
Records maintained in the stores
1. Packing List from the supplier:- This Report consist of the fabric received details with the
invoice quantity, color details, etc
2. Goods Received note copy: - This is made by the fabric store in charge and sent to the
merchandiser on the receipt of the fabric and one copy keeps with him.
3. Width Inspection Report: - On the receipt of fabric with of each roll is checked and a
report id maintained.
4. Stock Report: - This report is maintained as a soft copy for the details of the stock present
in the fabric store and updated time to time.
5. Fabric Inspection Report: - This Report is maintained in the stores for the inspection of
the fabric.
6. Fusing Shrinkage Report: - This report is maintained for the Fusing shrinkage of the
fusing received.
7. Width Checking Report: - This report is maintained for the width checking of the fabric
received.
8. Inspection Sorting Report: - The rolls which are to be inspected for the whole lot are
sorted and its details are maintained in this report.
9. Heat Shrinkage Report:-This report is maintained for the heat shrinkage of the fabric
received.
10. CSV Report: - Centre to selvedge inspection is done and maintained in this report.
11. Shade Card: - This is made for the shade batching of the lot.
28
FABRIC INSPECTION
In GARMENT, four point grading system is followed in the fabric audit department. All fabrics
are inspected under the 4 point inspection system. Penalty points are assigned based on the
standard fault size for every type of fault and chalk marks are then put for the identification of
serious defects in the subsequent process.
Fault description under the 4 point inspection system:
LEVEL
0-3 inches
3-6 inches
6-9 inches
Over 9 inches
POINT
1
2
3
4
supplier.
For every fabric order one meter of fabric is kept aside for lab testing and quality
standard reference randomly.
The inspection results are then filled in goods inspection reports (GIR).
The GIR reports have following categories:
29
There is a space in the bottom for Remarks; where whether the roll is acceptable or rejected is
specified.
The fabric is issued for cutting, if both Lab & Audit reports are O.K. However, the
cuttings are kept for reference.
INSPECTION INSTRUCTIONS
The width is checked and average width is mentioned.
The fold length is checked and the average is mentioned.
The reed is checked and +/- 2 threads is acceptable.
Centre to selvedge color variation is not acceptable.
For the bowing level is checked for by the following set acceptance levels:
WIDTH
LEVEL
Up to 44 inches
1 acceptable
45 to 60 inches
1.5 acceptable
60 to 72 inches
2 acceptable
R 501
1 , 220 v, 50 Hz
3 , 220 v, 50 Hz
1 hp, 100 rpm.
0.75 kw
30
Start
Receive fabrics
If Yes
If Yes
If No
If Yes
If approved
Reject lot
End
31
PURCHASE DEPARTMENT
Objective of the department
The purchasing department is similar to the sourcing department but the main difference is that
the sourcing department works for sourcing the fabrics alone while the purchasing department
works for sourcing the accessories and trims. However, the working procedure is the same
Functioning of the department
32
The merchandisers give the techpack and the BOM (Bill Of Materials) for a particular style to
the purchasing department and the concerned person will start the further process and for costing
purposes the in-house price is given like, the cost involved in the production and also the price
involved for a unit involved with respect to the complete procedure involved for its production.
In the process of doing the in-house price, suppose the cost of 100 pieces of button is Rs.32 then
a Tax of 2% + 14% of excise duty + 10% of per unit price is added as the transportation charges
and this all together makes the in-house price (a hidden margin of 5% is also taken into
consideration).
This breakup is given to the merchandiser by the purchasing department for the costing purpose,
the cost sheet is made by the merchandisers and the order is confirmed by the buyer based on the
cost sheet given by the merchandiser.
After the order is being confirmed by the buyer the merchandiser will sit with the other
concerned departments and then the exact quantity required and the breakup of the trims and
accessories with respect to color, size, MOQ, etc., will be given by the merchandiser to the
purchasing department in the form of a sheet which is generally followed in the industry for all
the orders irrespective of the buyer.
Once the purchasing department receives this format, then the PO is sent to the concerned
department for accessories and trims. Once the first shot of the raw materials is sent by the
supplier then the lab dips is done and is approved by the buyer.
After receiving the goods from the supplier they are checked for the quantity and also checked
according to the inspection criteria specified by the buyer and replaced if any of them are not
meeting this criterion. This department also keeps in track of all the quantities received in-house
timely. The goods are generally received in breakups as suggested by the merchandiser according
to the requirements stated by the planning and the production department and this breakups will
have specified date and quantity and if this breakups is not being mentioned then the order is
being placed with the supplier several times for small quantities and POs have to be sent all the
time so, in order to overcome this a breakups are being is given.
Then the purchase department has to follow up with the supplier for deliveries as and when the
merchandiser asks for the new set of the materials for that particular style and then the
department also has to maintain the receipts and also they have to maintain the documents of the
inspections that are being carried out for those materials.
according to the documents that have been received from the merchants and also the department
also makes the document for anything they carry out within their roof.
The department first receives a PO copy from the merchants, which the merchants would have
sent it to any one among the three above mentioned supplier types. As soon as the accessory
department comes to know about the date on which they will receive that particular material they
will make a note of it in their ERP that they will be receiving that material.
Once the material reaches the stores on the prescribed day and date the concerned person verifies
the materials against invoice/ Delivery Challan and packing list which they would have received
from the merchant as already stated.
After it is confirmed that the received materials is according to the documents then they carry out
a quality inspection and this inspection is carried out irrespective to the type of the buyer. The
company carries this inspection as per AQL standard 1.0 for all the types of goods received.
34
Inspect
Accept
151-280
20
281-500
32
501-1200
32
1201-3200
50
3201-10000
80
10001-35000
125
35001-150000
200
150001-5000000
315
10
500000-above
500
14
After inspecting the materials for the quality as per AQL then the allocation of trims done based
on the nature of the item.
Then the department prepares the GRN (goods receipt notes) according to the materials received
and against the documents received obtained from the merchants and they also do the bill entry.
The bills whatever they enter is been forwarded to the accounts department for the payments and
to fulfill other formalities and a copy of it is also given to the sourcing department in order to
inform them about the materials in-housed.
After this the department has to carry out two processes hand-in-hand they are,
Sub contracting: In this method they prepare the work order and also the delivery
challan and then they keep all the documents and also forward the trims along with the
document for processing.
Production issues: Another thing that they have to do is identify trims which has been
approved by merchants and then prepare the delivery challan and keep the trims ready to
35
36
Start
Prepare GRN & do the bill entry. The same is forwarded to accounts for payment
PRODUCTION ISSUES
SUB-CONTRACTING
Prepare delivery challan & keep trims ready to issue to the factorie
Material outward
37
IE DEPARTMENT
Objective of the department
The IED department has to work with many other departments as this department gives the entire
idea of the garment construction and the thread and trims consumption criteria, operators skill
level categorization and other related aspects hence they play a vital role in determining the cost
38
of producing a single piece of the garment and they also calculate the cost of the factory for that
particular style of garment.
Functioning of the department.
The IED department helps the planning department to know the time required for the production
of that particular style of the garment by calculating the SAM value for it and they also help in
knowing the capacity of the factory based on which the planning department takes a decision if
they have to proceed with the item or no.
The IED calculates the SAM value for the garment, calculates the productivity of the given style
for the initial costing and also calculates or counts the accessories consumption by the style and
gives all these details to the merchandising department for the costing purpose because the entire
costing criteria depends on these aspects and the IED also gives the merchants suggestions
regarding the reduction of the cost of manufacturing the garment by modifying any of the steps
and the method of doing it.
The IED people prepare the style bulletin which includes the different types of seams and
stitches that has to be done for the garment and it also includes the length of the seams and the
types of stitches that has to be carried out at different places of the garment as per the buyers
specifications and approval. Types of thread (which is the TEX), area of placement of the trims
and accessories and its location different kinds of labels that are supposed to be placed, the
criteria under which the finished garment has to be checked, the times at which the inspection
has to be carried out will also be mentioned in the style bulletin, this bulletin will be similar to
the Tech Pack but contains more technical data than that.
This department will analyze and estimate the manpower and their skill level which is required
for the production of the garment, they also set a target to the batch for an hour, for a shift and
for a month which will help them to maintain their outputs and also helps in timely completion
of the order or sometimes earlier. They will also give the target to each operator based on his/her
capacity and skill in order to help them finish their piece of work on time and also maintain the
quality of their work.
After setting the targets for a batch and also for each operator then they will calculate the
efficiency. This efficiency is purely based on the daily output of the batch as well as the single
operator and then they come up with the monthly output by the particular batch.
This department maintains a file which is the DPR (Daily Production Report), in this report they
update the batch number, style/item number, actual output, committed output, SAM value of the
garment (both actual and that particular days SAM value), total production till date, average
efficiency of the batch till date, peak efficiency achieved, if the company was working that day
or not, if there was a delay of production then the reason behind it, information about the batch
setting prior to the mass production, etc., all this will be mentioned in this DPR.
Based on the operators performance which would have been observed for a specified period of
time, the department will allocate a grade to the operator which is as follows.
Skill type
A
B
C
39
Grade
Highly skilled
Skilled
Semi skilled
40
Pre-production
activities
Production
department
Preparing operation
bulletin
Calculate
accessories
consumption
Reducing bottleneck
operations by proper line
balancing
Capacity study
Efficiency calculations
End
41
Training new
trainees
Fixing grade of
operators
ACCOUNTS DEPARTMENT
Under administrative direction, plans, organizes and directs the companys Finance and
Administration Department; also serves as Treasurer; provides highly responsible Administrative
staff assistance to the General Manager; and performs other related work as required.
This department is responsible for company-wide finance and related administrative support
services. Areas of program responsibility include, but are not limited to, accounting, budgeting,
financial planning and reporting, debt management, cash management, purchasing, information
systems, liability insurance and customer service. This class is distinguished from other
department management classes by its overall responsibility for directing financial and
administrative services.
This department reports to the General Manager.
TYPICAL DEPARTMENT TASKS
1. Develops, plans and implements goals and objectives for the finance and administration
department, prepares and administers internal policies and procedures relating to departmental
program activities; interprets and explains applicable rules, laws and regulations to supervisors
and others.
2. Directs, oversees and participates in the departmental program work plan; assigns work
activities, finance and administration projects and programs; monitors work flow; reviews and
evaluates work products, methods and procedures; implements needed work process and
automation improvements and methods for improving customer service.
3. Manages the preparation and maintenance of a variety of financial records and reports,
including those related to the general ledger, accounts payable, accounts receivable, payroll, job
costing, inventories, budgets and fixed assets; ensures the purchasing of materials, supplies and
equipment are conducted in accordance with company policies and procedures.
4. Oversees preparation and presentation of the annual budget; supervises data gathering and
financial planning work associated with rate setting; prepares rate analyses.
5. As Treasurer, oversees cash management, investment, and debt management activities.
42
6. Coordinates departmental activities with other departments and divisions; provides responsible
advice and counsel to the General Manager, and department and division managers on a variety
of financial and administrative issues; oversees the maintenance of departmental records and
files; administers liability claims and property insurance programs.
7. Manages information technology support services for the company including installation,
maintenance and upgrade of both mainframe and network based applications pursuant to an
information technology master plan; through user groups and other means, explores
opportunities to improve efficiency and productivity through user friendly information
technology enhancements.
8. Conducts financial reviews of company operations and activities and reports findings and
recommendations to the General Manager and Board of Directors; serves as liaison with external
auditors and coordinates their activities on behalf of the company.
9. Attends Board of Director and Board Committee meetings; prepares and presents staff reports
and agenda items for consideration by the Board; serves as advisor to the General Manager and
Board as to financial planning and administration.
10. Coordinates preparation of the annual budget request for the finance and administration
department; reviews staffing, equipment, and supply needs based upon recent trends and
planned.
43
Workforce planning
Recruitment
Skills management
Training and development
Personnel administration
Compensation in wage or salary
Time management
Employee engagement activities
Personnel cost planning
Performance measuring system
CSR(Corporate Social Responsibility)
44
Recruitment and
Selection
Training
Compensation and
Benefits
Welfare
Exit Formalities
Compliance
Industrial Relations
Public Relation
45
Start
HR Planning
Recruitment and
Selection
Training and
Development
Performance
Compensation and
Benefits
Exit
Legal
Administration
46
47
PRODUCTION DEPARTMENT
Hear the production is doing by CUT TO PACK process all the cutting, sewing and packing is
on one line itself. Like that total 10 lines is therein different two floors and in one line 35
machines are there and for that line one separate cutting and finishing table is there
Cutting production consist of all the process activities involved in reducing the bulk material
used in apparel in to the component parts making up the apparel.
The cutting room is a combined section for spreading, cutting, ticketing, fusing, printing and
bundling. This is just near to the fabric store. There is one spreading table of 23 feet length. The
lay is cut by straight knife on the cutting table and the blocks are transferred to numbering table
and then for fusing/printing/embroidery and then for bundling.
48
averages.
Measurement sheet
Design worksheet of the garment
Purchase order
Fabric requisition sheet
CAD mini marker
Marker planning- length of lay etc., size ratio and colors in which the patterns are to be
cut.
Spreading
49
The spreading of this lay is done manually. The length of the lay depends upon the quality of the
fabric & length of the marker as specified by the CAD. Whereas the lay height depends upon the
thickness of the fabric.
23.6 feet(283)
6 feet(72)
3 feet(37.5)
Sunmica
Spreading mode
FONO
No of table
Cutting
The lay is cut with the help of electrically powered straight knife cutting machines or CAM m/c.
The machine is moved through the lay following the pattern lines of the marker and the
reciprocating blade cut the pieces of the fabric progressively. Notches are also added. The
garments are kept aside as and when they are cut.
Spread
Place marker
Cut pattern pieces
50
The pieces cut out from the lay are now sorted out size wise. All the components of one garment
size are brought together. It is very important to take care that pieces cut from two different bolts
(bundles) of fabric are not mixed up. This is because within a lot there are bolt-to-bolt variations
in the colour shade. The sorted pieces are now ticketed. Ticketing is the process of marking the
cut components for shade matching precision, and sequence identification. The worker secures
one end of the stack and puts on the ticket using ticket gun as he flips over the cut parts. The
ticket contains the size, bundle number and piece number and serves as important means to track
the parts of the garment in the assembly line from start to end. After ticketing cut panels are sent
for fusing/printing/embroidery processes.
Embroidery
The cutting department is responsible for sending the cut components of a style for embroidery
as stated in the production package. They check for any embroidery and follow up these
departments accordingly. Blocks of panels are sent for embroidery, which are checked after
receiving back. To avoid mixing of the panels, the cut panels are sorted according to size wise.
Fusing
51
Fusing is also carried out in the cutting room itself. The parts to be fused are separated from the
bundle. The fusing material (like interlining) is cut according to the size of the components to be
fused. The components along with the cut fusing material are kept between two papers sheets
and the pack is passed through the fusing machine. By means of the temperature and the pressure
fusing takes place at a particular speed and for a particular time. The pack comes out at the other
end on the conveyors and the pieces are removed and re bundled.
Bundling
The checked components of one style and in one size are now clubbed and bundled using ties.
The size of bundle depends upon the requirement of the production plant. Each bundle will
contain pieces of the same style and same size only. The cutting department issues the amount
required by the production department when asked for.
52
WORK FLOW
Acquire fabric from
fabric store
53
Require
Checking
no
Yes
Require changes
no
Yes
54
SEWING
Bulk cutting
Sorting
Bundling
Issue to sewing
Sewing has always been the most dominant of all the process in the garment industry. Much of
the application of technology to clothing manufacture is concerned with the achievement of
satisfactory construction of seams and permutation and combinations during line balancing for
getting the maximum output without compromising with the quality standards.
Sewing section in the unit consists of two floors which accommodate about 350 machines and
distributed into 10 lines. Each line has a supervisor monitoring the production and trying to
balance the line himself.
The production floor does production in two types,
- Piece rate production
- Assembly line production
55
Pilot Run
Inline Inspection
Final Inspection
Dispatch to Finishing
production gradually increases from 50 100 150 and so on, this will make the operators learn
slowly and precisely about the processes that has to be carried out for the particular style.
Once the cut parts is received from the cutting and sorting section then the parts are prepared and
assembled according to the line that is planned. After the assembling of the parts is done then
there will be a line checking, where the shade matching and the measurements are checked and
sent.
During the process of garment making there exists two types of checking, they are
In-process checking.
End line checking. Here there exists both AQL audit and normal checking.
The garment making is divided into three different stages and at these three stages the checking
is done.
The flow of material in the production floor is through the bundle system and each operator gets
a bundle containing similar pieces and there will be about 15 20 pieces in each bundle and the
operator completely finishes the job and sends it to the next operator to do the next operation on
them. Each bundle contain different components of same garment. The movement of the
materials within the operators in the batch/line is generally zig zag motion which is followed.
The checking person will be present at a position where the garment is partially finished and it is
as mentioned checked thrice in the line and sometimes more than three and this depends on the
buyer as well as the number of components present in the garment.
The supervisor plays a vital role in the production floor. He manages the entire batch which is
been allocated to them and they have the following functions to perform,
1. They have to convey the proper stitching method to the operators.
2. Guide the operators when they face difficulty in making an operation and teach them
the most suitable and an easy method of performing the task.
3. Check if the entire operator in the batch/line is busy with the work being allocated to
them.
4. If the operator does not have any material to work on then the supervisor has to get
him/her their material and ask them to work.
5. Complain the production managers if the operators are not performing their best.
6. Have to maintain a proper communication between the operators and the management.
7. Should be in a position to tell the manager about each operators skill level whenever
asked for.
57
8. When any operator is on leave then the supervisor has to make sure who can be a
better person to fit into that vacant place.
9. At times the supervisor himself sits and performs the operation if necessary.
10. The supervisor should be in good terms with all the operators by having a friendly
approach to them and also must make sure that none of them create any trouble for the
factory at any time.
The production managers help the planning department during planning or allocating a particular
line for the style by telling them the capacity of the line and also telling them about the skills of
the operators.
58
Start
Bulk Production
Cut parts received from cutting
Sewing process begins
Assembly
In line checking
Button & button hole/ Bar tack
Ironing
Spotting
Final checking
Measurement checking
Tagging
Packing
Auditing by buyer QA
Dispatch
59
End
60
SEMI PRESSING:
This happens when a garment is difficult to inspect in the crushes manner as it comes from the
washing department hence, they do a partial pressing for the garments and then inspect it and
trim it and then send it to the complete pressing process.
TRIMMING:
This involves the removal of the extra threads from the garment at the stitched areas.
INSPECTION:
The inspection carried out here is according to the AQL 2.5 system and sometimes it depends on
the buyer also i.e., if the buyer emphasizes for a 100% inspection then the company has to do as
specified.
PRESSING:
61
The pressing is done after the garment has been completely inspected and the garments are
pressed on the basis of how they will be folded during packing.
TAGGING SECTION:
Once the garments are been done with the inspection and complete pressing then they are sent
for tagging the labels and the labels include the size labels, price tags and miscellaneous labels if
any required by the buyer. Once the tagging is done the garments are folded according to the
buyers specification and also they are either folded plainly or sometimes they are folded after
they are put to the hangers as per the buyers specifications again.
The packing material, PCB details, number of size ratios that are supposed to be put in are all
suggested by the buyer and the packing is done according to these specifications.
PACKING:
The packing is always done in the carton boxes and there are several criteria for the packing of
the garments they are as follows,
There are generally two kinds of packing the garment,
1. The garment is individually packed/wrapped in the poly bag whose design will be
specified by the buyer or plain poly bag packing and then the entire garments (as
per the packing criteria) is arranged in the carton box.
2. The other method is that the garments are just folded and arranged in the carton
boxes without putting them in the poly bag.
MAINTENANCE
62
Maintenance department looks for the availability of the work aid, attachments and the
machinery requirement in-house or otherwise order them to the supplier
Regularly keeps an update on the needle breaks and their causes so that it can be rectified
in the near future
Keeps a record of all the attachments used for the particular style for future reference in
case the style repeats
ROLES OF THE MAINTENANCE DEPARTMENT
PROVIDES
The necessary machines, instruments and appliances to carry out the manufacturing.
FACILITATE
The department with necessary work aids and environment.
SERVE
The employs with necessary needs.
MAINTAIN
63
The maintenance department is responsible not only for the maintenance of the machines but it is
also responsible for providing and maintaining the facilities for the production activities e.g.
illumination, air circulation, work place engineering, compressed air etc.
The condition of machines & working atmosphere in the department is mainly dependent on the
care taken and working in habits of the operators and all other floor employees.
TYPES OF MAINTENANCES
Breakdown Maintenance
Corrective Maintenance
Preventive Maintenance
Scheduled Maintenance
a) BREAKDOWN MAINTENANCE: - When the machine appliance stops completely & is not
in condition to be operated. This is carried out as and when the problems are highlighted by
concerned operators in the shop floor.
b) CORRECTIVE MAINTENANCE: - When the maintenance is carried out for the correction
of the problem served when the machine is running.
64
65
PROJECTS
66
Total Activities=18
Fusing
Cut Order
Printin
Embroide
Cutting
Spreading
Sorting
Ticketing
Spreading
Cutting
In
Preparation
Fabric requisition
of
g
ry
Room
charge
Checking
Bundling
Fabric store
Data Collection:
68
Strength
2
12
3
3
3
4
2
6
5
1
4
Store Helper
Spreading
Cutting
Cutting Helper
Ticketing
Bundling
Fusing
Heat transfer printing
Checking and Sorting
Data Entry
Quality Auditor
Capacity Study:Process
Spreading
Cutting
Ticketing
Fusing
Unit Time
13.86
sec/gmt/grou
p
39 min 12
sec/gmt/mast
er
29.16
sec/gmt/pers
on
6.84
sec/gmt/pers
on
Strength
4 groups of
12 ppl
Capacity
8312 gmt/day
6 ppl (3
master,3
helper)
3 ppl
6612 gmt/day
2 ppl
4210 gmt/day
69
2979 gmt/day
Sorting after
embroidery
Embroidery
checking
Bundling
6.6
sec/gmt/pers
on
12.0
sec/gmt/pers
on
43.75
sec/gmt/pers
on
3 ppl
13091
gmt/day
2 ppl
4800 gmt/day
4 ppl (1 for
bundle info
entry)
1975 gmt/day
Observation
Manpower
allocation is not
proper.
Sometimes hand
scissor is used
instead of end
cutters.
Reason for
current status
Required
manpower is not
available.
Lack of proper
cutting
equipment.
Suggestion
Splicing is not
Many people
done at any level. think that it is
wastage of time,
nothing more.
Sometimes
Defect
spreader stops
marks.
Utilizing
end bits.
Paper work.
Measure
length and
width of ply.
Roll
change.
Wait for the
Future effect
Need more
manpower for
cutting.
Only end cutters
should be used
for proper edge
cutting.
Splicing should
be used for
preventing value
loss.
Allocate material
and manpower as
per requirement
and helpers
should be fast.
Reduce re-cutting
and wastage of
fabric.
70
lay to be
cut or
moved to
the cutting
machine.
Sometimes
shifting of lay
from spreading
table to the
cutting table.
(This will
decrease tension
in lay due to
pulling and also
distortion in lay.)
Lack of tables
and slow work.
Cutting helpers
are not
comparatively
fast enough to
remove the cut
parts from cutting
table.
Air floatation
table should be
used. (Before
shifting of lay
make sure that
air flotation is on
and running at
highest level)
Cutting helpers
and others should
be well trained.
Table surface
quality should be
good enough and
more tables
should be placed
as per work
processes.
Sometimes, New
lays are started
on the completed
ones. (This will
distort either or
both of the lays
when the former
lay is moved for
cutting.)
Lack of tables
and available
table surface is
not good which
take more time
for cutting and
other processes.
Lack of
supervision and
racks are not
used.
Proper racks
should be used to
keep the cut
parts according
to production
lines.
Racks should be
used individually
for each and
every style under
the proper
guidance of
71
Reduce loss of
time and lays
could be spread
separately and
spreading,
cutting will be
easy.
supervisor.
Marker rack is not Carelessness of
in a proper
cutting in-charge.
condition.
Some ticketing
workers are slow
enough to
complete the
work in specified
time period.
In absence of
cutting in-charge,
some workers
dont do their
work sincerely.
Carelessness and
lose control on
workers.
Proper
Due to work
synchronization is stress on cutting
not maintained.
in-charge.
Supervisors
supervise the
process but not
the
synchronization.
This has to be
taken in care.
Cutting in-charge
should be aware
about each and
every element in
cutting room
even a single
piece of fabric.
Every worker
should be trained
enough to
complete the
work in a specific
time and
responsible too.
All workers
should be
responsible and
sincere enough
for their work.
Cutting in-charge
should have
management and
leadership
qualities to
control and
motivate the
workers.
Proper
synchronization
should be
maintained by
the cutting incharge and the
supervisor across
all the operations
and processes.
72
Reduce
throughput time
from cut to load.
Workers should
be motivated by
setting a target
per day for their
respective work,
Motivation
increases the
confidence and
sincerity towards
their work.
Layout Study: We have studied cutting room layout carefully and we suggest
some improvisations for better material flow.
During layout study of cutting room, we found that there was a
lot of space which is not being used in a proper way. So we
discussed it to our mentor (PPC head) and suggest her that this
space can be used for various purposes to improve the capacity
and efficiency of cutting room.
We have allocated some tables to reduce material movement
time and better smooth flow of materials. Ticketing can be done
near on cutting tables.
We suggest that more cutting tables should be placed to improve
the cutting capacity.
Sorting and Embroidery checking can be done simultaneously. So
we can allocate manpower as per necessity.
We allocate extra manpower (sorting and embroidery checking)
for bundling process.
Waiting time
Negligence of operators
Paper work
Measuring length and width of ply
Roll changing
No proper identification
Zigzag movement due to improper lay out
73
No proper planning
Improper machine use
Defect marks
Sharing of working instruments
Absence of operators
Workers fatigue
less experienced workers
Poor machine performance
Due to excess humidity and temperature
Recommendations:-
74
75
Cutting
Ticketing
Fusing
Heat transfer
printing
Bundling
Unit Time
Strength
Capacity
Extra
Capacity
1802 gmt/day
11.39
sec/gmt/grou
p
27 min 12
sec/gmt/mast
er
18.56
sec/gmt/pers
on
6.08
sec/gmt/pers
on
4 groups of
12 ppl
10114
gmt/day
6 ppl (3
master,3
helper)
3 ppl
12705
gmt/day
2 ppl
20 sec/gmt
31.62
sec/gmt/pers
6 ppl
6 ppl (1 for
bundle info
8640 gmt/day
2732 gmt/day 757 gmt/day
76
6093 gmt/day
on
entry
Introduction
Rework is a vital issue for poor quality product and low production rate. Reworks are the non
-productive activities focusing on any activity that customer are not willing to pay for. Nonproductive activities describe that the customer does not consider as adding value to his
product. By reacting quicker in minimization of reworks to make a product as per customer
demand with expected quality, the company can invest less money and more costs savings.
Therefore, a study was carried out in the garment industry named Creative clothex located at
Noida, U.P, India at sewing section to identify reworks so as to eliminate them for saving time,
cost and improved product quality.
1.
2.
3.
4.
5.
77
Identification of Defects
DMAIC PROCESS
DEFINE PHASE
Currently in Line 5 , average rework in sewing is 20-22% for August, 2015 , This
results extra cost, operator time, increased lead time leading to delay in delivery,
customer dissatisfaction in terms of reliability resulting in loss of confidence.
MEASURE PHASE
Defect Zones
A zone
B zone
The defects of the garment which is visible when garment is opened flat.
C zone
78
Defecte
Inspected
d
Quantity
Quantity
DEFECT
% defected
Cumulative %
defected
Joint Out
18
44
40.9
22.5
62.5
6.3
Puckering at Waistband
21
38.1
10.0
50.0
5.0
50.0
2.5
33.3
1.3
12
25.0
3.8
1
3
20.0
1.3
Cuff attached
12
66.7
10.0
Pocket width
uneven(pocket attach)
33.3
1.3
Teeth stain
100.0
10.0
Panel up-down
66.7
5.0
Number mismatch
100.0
3.8
Uneven stitch(neck
topstitch)
100.0
8.8
Stitch on print
100.0
3.8
Wrong thread
50.0
2.5
79
33.3
1.3
33.3
1.3
80
157
Rank
DEFECT
Cumulative % of defects
Joint Out
22.5
Puckering at Waistband
10.0
Cuff attached
10.0
Teeth stain
10.0
8.8
6.3
5.0
Panel up-down
5.0
3.8
10
Number mismatch
3.8
80
25 22.5
20
15
8.8
10
6.3
5
0
10
10
3.8
3.8
3.8
2.5
2.5
1.3
1.3
1.3
1.3
1.3
10
ANALYSE PHASE
Failure Mode Effect Analysis (FMEA)
Process
Potential
Potential
Function/
Failure mode Effect(s) of
Requirements
(-ve)
failure
(+ve)
Parts Rework < Parts Rework
2%
> 2%
SEV
High
8
rejection
Low
8
Productivity
Low
8
efficiency
Unskilled
Operator
Lack of
Understanding
Lack of SOP
SOP not
followed
Pressure to
produce
Poor raw
material quality
Cut parts
quality
Poor quality 8
Over time
Cost
Reliability
reduced
Delay in
Delivery
Potential
Cause (s)
5
5
8
81
OCC
Current
process
control
DET
Risk
Priority
No.
Skill Matrix
432
160
384
384
10
320
320
512
5
8
8
4
8
8
PP
meeting
Mock
display
Mock
display
No Control
RM
Inspection
Panel
Inspection
OTIF
reduced
Raw
material
wastage
Missing panels
Bundle
Ticket
432
Wrong side
Numbering
Sticker
Panel
Inspection
320
120
160
280
432
576
Bond
Strength
report
288
Bond
Strength
report
288
No Control
10
480
Lay
markers as
per fabric
width
192
Buyer
Specs
followed
336
Line
320
Customer
Dissatisfacti 7
on
Marking Pens (
without trial
run)
Stopped
using
marking
pens
No feeding
8
to Assembly
Needle Size
( without trial
run)
R & D in
Sampling
Increased
WIP
Wrong Pattern
Work
Pressure
Unavailability/
Wrong /
Missing of
Emb
High
Absenteeis
m
Poor fusing
quality
Improper
Temperature
for Fusing due
to neglegency
Improper
Pressure for
Fusing due to
neglegency
Poor quality
numbering
stickers
Parts cut in
selvedges
Matching
standards not
followed in
cutting
Delay in
82
Verified
and Seal
by
Sampling
head
Quality
and
Quantity
inspection
Bond
Strength
report
embroidery
panels
Delay in print
panels
Delay in tapes
Delay in labels
Delay in
buttons
Wrong label
placement
Wrong issues
of Labels
Wrong issues
of buttons
Wrong issues
of Threads
Trims missing
in trim cards
Machine not
set as per
standard
Wrong folders
& Guides
Process
Function/
Requirements
(+ve)
Potential
Failure
Potential Effect(s)
mode (
of failure
-ve)
SEV
83
320
320
320
320
Tech pack
96
Trim Card
144
Trim Card
144
Trim Card
144
Trim Card
512
SPI
mockup
384
280
120
120
DET
Risk
Priority
No.
Same machine
bobbin case
not used
Potential
Cause (s)
Loading
Plan
Line
Loading
Plan
Trims
checklist /
Prod Plan
Trims
checklist /
Prod Plan
Trims
checklist /
Prod Plan
PP
meeting
Bobbin
case bag
with m/c
number
Inline /
Endline
checking
Current
OCC process
control
Assembly
Rework < 2%
Assembly
Rework > High rejection
2%
8 8
Unskilled
Operator
Skill Matrix 6
432
Low Productivity
Lack of
Understandi 5
ng
PP meeting 4
160
Low efficiency
Lack of SOP 8
Poor quality
SOP not
followed
Pressure to
produce
Poor raw
material
quality
Cut parts
quality
Missing
panels
Missing
sticker in
parts
Marking
Pens
( without
trial run)
Needle Size
( without
trial run)
Reliability reduced 5
Delay in Delivery 8
OTIF reduced
Raw material
wastage
Customer
Dissatisfaction
No feeding to
Finishing
384
384
No Control
10
320
RM
Inspection
320
512
432
8
6
Panel
Inspection
Bundle
Ticket
Bundle
Ticket
576
Stopped
using
marking
pens
120
R & D in
Sampling
160
280
280
280
320
320
Increased WIP
Wrong
Pattern
Work Pressure
Bundle mix
5
up
High Absenteeism 5
Delay in
5
ready parts
Shade Variation
7
in garments
Delay in
tapes
Delay in
labels
84
Mock
display
Mock
display
Verified and
Seal by
Sampling
head
Serial
matching by
helpers
Production
report / plan
Trims
checklist /
Prod Plan
Trims
checklist /
Prod Plan
Delay in
buttons
Wrong label
placement
Wrong
issues of
Labels
Wrong
issues of
buttons
Wrong
issues of
Threads
Trims
missing in
trim cards
Machine not
set as per
standard
Wrong
folders &
Guides
Same
machine
bobbin case
not used
Trims
checklist /
Prod Plan
320
Tech pack
96
Trim Card
144
Trim Card
144
Trim Card
144
Trim Card
512
SPI mockup 6
384
PP meeting 7
280
Bobbin case
bag with m/c 3
number
120
Inline /
Endline
checking
120
OCC
DET
Risk
Priority
No
Panel Inspection
512
Unskilled Operator
Skill Matrix
432
85
Missing panels
Bundle Ticket
432
Unavailability/ Wrong /
Missing of Emb.
432
576
No Control
10
480
Trim Card
512
Bundle Ticket
576
Panel Inspection
512
Bundle mix up
512
Lack of SOP
No control
10
400
Uncut threads
576
432
Sticker marks
432
Stains
432
Uncut threads
Bundle mix up
Unskilled Operator
Missing panels
10
11
12
Sticker marks
13
Stains
Joint Out
Puckering at Waistband
Uneven stitch (neck topstitch)
Label centre out
Cuff attached
Panel up-down
Uneven width(welt pocket, waistband )
Waistband extension uneven
Number mismatch
Man
Metho
M/c breakdown
Improper line matching of body
Fabric quality
Armhole
joint out
Machi
Materi
Causes
Effect
SOP/SPEC
Even armhole piping required, correct use of folders
Proper width should be maintained by the operator himself or use
guides
Training; Smooth pull, smooth peddling, smooth feeding maintaining
equal allowance throughout the operation
Operator should be properly trained for the operation they are
supposed to perform
Operators should have a habit of regularly checking their work and the
pieces they are handed, they should not neglect any fault
Should be even and done carefully according to specifications
provided
Operators should always check the pieces for any faults
Notches should be properly marked and matched
Operators should be trained well not to neglect problems or faults
Operators should not disturb others
Side seam should be carefully done matching the notches
Should be proper as per style ensuring correct holding capacity.
Front and back body line should correctly match
Reconditioning and resetting as per fabric quality, feed time and looper
time
Machine breakdown
Method
88
Improper
feeding
1
Operator
Handling
Unnecessary
pulling of plies
Armhole down
stitch
Non-uniform
Inadequate
Skill
Difficult to
handle material
Notch not
marked properly
Improper
sleeve shape
Required A*
operator
Required
training
Frequent
89
Required A* operator
Proper training to be given
Frequent Operator change
Buyer Requirement
operator change
Inadequate
Skill
Too much WIP
Operators
negligence
Too much
Rework
Frustration
Bad mood
side seam up
down
Difficult to
handle fabric
Unnecesary
pulling of plies
Operator
negligence
Too much
rework
Improper line
matching of
body
Disturbance
by other
operators
Improper
machine
working
Too much
rework
Inadequate
skill
Pressure for
production
Pressure for
production
Fight with
other operators
Personal
problems
Buyers
specification
Operation
requirement
Too much WIP
Inadequate
skill
Pressure for
production
Required A* operator
Required training
Frequent Operator change
Non-availability of maintenance
personnel
Required A* operator
Too much WIP
Operator inefficient
Inadequate Skill
Too much rework
Inadequate skill
Improper
machine
working
Nonavailability of
maintenance
personnel
To give rework
pieces
To show the
mistake
To talk
To get their
work done
Other operators
cant do that
work
Other
operators are
overloaded
90
Under-skilled operator
Inadequate skill
Mismatch of
Notch
Notch not
marked
correctly
Notch not
followed
properly by
sleeve attach
operator
Operator not
paying attention
Operator
inefficiency
Inadequate skill
Operator not
paying attention
Pressure for
production
Man
Metho
Pieces mixed
Operator handling
Improper Numbering
Self-checking method not adopted by
Shortage of parts
Sticker area chopped
in overlock
Different
size parts mix up
Improper Bundling
Improper Print of Numbers
Number sticker removed
Machi
Number
Mismatc
h
Materi
Effect
Causes
91
SOP/SPEC
Improper numbering
Improper bundling
Shortage of parts
Operator handling
New Operator
Self checking method not
adopted
Operator's negligence
Machine
Improper print of numbers
Method
Sticker area chopped in
overlock
Material
Sticker removed
Pieces mixed
Operator handling
Improper Numbering
Improper print of numbers
Self checking method not adopted by operators
Shortage of parts
Different size parts mix up
92
Improper Bundling
Number Sticker Removed
Sticker area chopped in overlock
Improper
Numbering
Improper print of
numbers
Improper instruction
Operator negligence
Improper Handling
Negligence while ticketing
Required A* operator
Too much WIP
Required Training
Inadequate Skill
Operator busy talking
Ticketing Machine not ok Require Maintenance
Ticketing Machine not
Inadequate Skill
handled properly
Operator
inattentive
Required A*
Too much WIP
Inadequate Skill
operator
Non-availability of
Operators
Improper machine working maintenance
negligence
personnel
Required A*
Too much Rework
Inadequate skill
operator
Bad mood
Personal problems
Required A*
Parts mixed after cutting Operator Negligence
operator
Pieces wrongly numbered Operator Negligence
Required training
Frequent operator
Improper bundling Parts mixed while
Operator Negligence
distributing
change
Inadequate
training staff
Cutting not planned
Shortage of parts
properly
Ineffective Adhesive
Number Sticker
Problem with ticketing
Required
Improper ticketing
removed
machine
maintenance
Operator negligence
6
7
Required training
93
8
Disturbance by
other operators
Sticker area
chopped in
overlock
Operator Negligence
Required training
Under-skilled
operator
Inadequate skill
Require method
improvement
Placement of sticker
Man
Metho
Carelessness
Improper pre-setting of waistband
Unskilled operator
Top ply is pushed and bottom ply is held back
Plies in the seam not being aligned properly
Improper tension setting
Improper SPI causing
structural
Different
composition of bobbin
jamming and needle thread
Puckering
at
waistban
d
Machi
Materi
Effect
Causes
94
Man
Metho
Unskilled operator
Margin not followed while attaching waistband
Waistband edge not fnished properly
Improper folder setting on
machine
Zipper not attached properly
which led to mismatch in left
and right front of the garment
Machi
Waistban
d
extension
uneven
Materi
Effect
Causes
95
IMPROVE PHASE
Solutions to the Root Causes
Armhole Joint Out Problem
Sl.
No.
Root Cause
Corrective Action
Preventive Action
Ignorance by the
operator
Patterns not
placed correctly The cutting operators should
The pattern placement should
match the pattern from one
while cutting
be checked by the operator
Uneven
Edge guide should be
Operator should check for the
sleeve attach
provided
Uneven margin Operator should be shown the correct attachment of the
pieces
during sleeve
videos showing correct
Responsibility
attach
method of stitching
Wrong matching of Front & Back matching helper Needs part wise serial follow
F&B pieces
should take care of the serial
up
96
QC
Department
Cutting Dept.
Root Cause
Corrective Action
Preventive Action
Lack of attention of
issuing authority
leading to size mix
Man-handling the
bundles in cutting
dept.
Responsibility
Sl.
No.
Root Cause
Corrective Action
Preventive Action
Responsibility
Sl.
No.
1
Root Cause
Corrective Action
Preventive Action
Improper folder
97
Responsibility
setting on machine
CONTROL PHASE
Used to ensure that the improved process is maintained and to establish controls for the
same
Develop Control Plans/ Quality Plans/ Procedures & Standardize the improved process
Evaluate Benefits / results
Check before after through individual Control charts, Histograms, etc.
Evaluate Sigma Level Before & after