ABSTRACT
In India more than 35% of construction project are facing the problem of time over
run ranging from 1 to 195 months. Time and cost overruns are a result of delays in project
execution. Some of the reasons advanced for these delays and subsequent overruns in time
are inclement weather, shortage in labour and material supply, sub-contractors, changes after
contract execution has commenced, poor site management and government policies. The
delay in a project is also due to the poorly drafted contract clauses. Identification of the
contract clauses that affect the schedule of the construction project was which taken up by
CPWD has been carried out in this study.
The preliminary questionnaires were supplied to the Contractors and Engineers who
have undertaken the works in Trivandrum. Similarly the main questionnaires were supplied
to the Contractors and Engineers. Based upon the answer obtained from 30 persons towards
contract clauses were analyzed. From the analysis it was found that 16 clauses affecting the
schedule performance of a project. The result of the analysis could help the professional in
focusing on the few clauses that affect the schedule frequently so that schedule over runs and
possibly cost over runs could be avoided in future.
CONTENTS
CHAPTER NO
TITLE
ABSTRACT
LIST OF TABLES
PAGE NO.
V
viii
LIST OF FIGURES
ix
NOTATION
ix
INTRODUCTION
1.1 GENERAL
1.2 NEED FOR STUDY
1.3 AIM
1.4 OBJECTIVE
1.5 DEFINITIONS
1.6 CPWD CONTRACT
1
1
2
3
3
3
4
CLAUSES
1.7 GENERAL
CONTRACT CLAUSES
1.8 CONCEPT OF
19
CLAUSES AFFECTING
SCHEDULE
2
3
4
1.9 CONTRACTUAL
20
PROBLEMS
REVIEW OF
25
LITERATURE
METHODOLOGY
DATA COLLECTION
4.1 INTRODUCTION
4.2 QUESTIONNAIRE
34
38
38
38
SURVEY
44
CONTRACT
SUMMARY AND
56
CONCLUSION
REFERENCES
58
APPENDICES
A CPWD PRELIMINARY
QUESTIONNAIRE
B CPWD MAIN
QUESTIONNAIRE
61
62
72
LIST OF TABLES
TABLE NO
4.3.2
TITLE
Mean,
PAGE NO
standard
of
CPWD
44
4.3.3.1
contract clauses
Mean
score
and
51
various
affecting
schedule
clauses
on
project CPWD
Mean
score
and
53
on
the
frequency
of
them
CPWD
CPWD
B.1
questionnaire
CPWD main
preliminary
63
74
questionnaire
LIST OF FIGURES
FIGURE NO
TITLE
PAGE
3.1.a
4.2.1.1(a)
Methodology
Pie chart for the contractors and
35
40
employers respondants
4.2.1.1(b)
40
CPWD Preliminary
4.2.1.2 (i)
43
Profitability CPWD
4.2.1.2 (ii)
NOTATION
CPWD- Central Public Work Department
43