Sunteți pe pagina 1din 3

Process Step

Load List
Project

Project number

Thailand I

605520

equipment
Item no.

Designation

Revision

Part of documentation

Number of Documentation

4. Building and Layout

Name

4.3

load
equipment
maximum
in
empty
operation load

part of the
building

loadbearing
level

[kg]

[kg]

[kg]

[grid]

[m]

301.3-D-06 water vessel

10

14

14

BC 23

18,6

301.3-D-07 water vessel

10

14

14

BC 23

18,6

301.3-D-52 stabilizer vessel

10

14

14

BC 23

18,6

301.3-P-05 lactam pump

450

460

460

BC 23

18,6

301.3-P-06 water pump

40

40

40

BC 23

18,6

301.3-P-07 water pump

40

40

40

BC 23

18,6

301.3-P-45 TiO2 dosing pump

60

60

60

BC 23

18,6

301.3-P-51 stabilizer pump

60

60

60

BC 23

18,6

301.4-D-15 seal tank

400

680

915

AB 23

18,6

301.4-E-15 condenser

300

406

490

AB 23

24,6

301.4-E-27 diphyl evaporator

3500

8000

11000

AC 23

12,6

301.4-F-01 melt filter

8000

9000

AB 23

6,6

301.4-P-01 melt pump

1090

1095

AB 23

6,6

10.04.2012 Page

checked

Bauer

31.05.2012

kind of
bearing

kind of
engine

angular
speed

number of
strokes

[min-1]

[stroke/min]

10

11

electrical
motor
electrical
motor
electrical
motor
electrical
motor
electrical
motor

Process step 130

301.4-R-01 VK-tube, distributor

200

220

220

AB 23

24,6

301.4-T-01 return flux column

165

190

355

AB 23

24,6

301.5-D-15 storage tank

360

1145

1535

AB 23

24,6

301.5-P-15 circulation pump

190

200

200

AB 23

24,6

BC 23

24,6

302.1-D-02 mixing chamber

14

18

18

AB 23

24,6

302.1-D-03 mixing nozzle

71

85

85

AB 23

24,6

5100

BC 23

24,6

13400

AB 23

24,6

365

AB 23

18,6

302.1-E-01 preheater

750

302.1-E-03 melt dryer

6500

302.1-P-01 melt pump

360

302.1-R-01 prepolymerizer

8300

10400

18000

20900

AB 23

24,6

302.2-P-01 triplex pump

440

450

450

CD 23

24,6

302.2-P-02 melt pump

290

300

300

CD 23

18,6

302.2-R-01 dimeres cracker I

15000

24000

CD 23

24,6

302.2-R-02 dimeres cracker II

15000

24000

CD 23

24,6

electrical
motor

electrical
motor

electrical
motor

electrical
motor
electrical
motor

Process step 140


303.1-D-01 screen
303.1-D-02 water tank
303.1-D-03 chips tank
303.1-D-04 suction tank
303.1-E-02/03heat exchanger

Date

Barth

created

Process step 120

302.1-D-01 static mixer

Date

120, 130, 140, 150, 160, 180

electrical
motor

1 of 3
Remark

12

Process Step

Load List
Project

Project number

Thailand I

605520

equipment
Item no.

Designation

Revision

Part of documentation

Number of Documentation

4. Building and Layout

Name

4.3

load
equipment
maximum
in
empty
operation load

part of the
building

loadbearing
level

[kg]

[kg]

[kg]

[grid]

[m]

10.04.2012 Page

checked

Bauer

31.05.2012

kind of
bearing

kind of
engine

angular
speed

number of
strokes

[min-1]

[stroke/min]

10

11

+package
electrical
motor
electrical
motor
electrical
motor

303.1-J-04 suction system


303.1-P-02/03 circulation pump
303.1-M-01

granulator
+head+rotor+ceramic knife

Process step 150


304.1-D-01 extractor head

1500

4600

4900

AB 34

36,6

304.1-D-05 separator

1500

4600

4900

AB 34

36,6

304.1-E-01 heat exchanger

150

160

180

BC34

18,6

304.1-E-04 heat exchanger

150

160

180

BC34

30,6

304.1-E-05 heat exchanger

160

170

190

BC34

24,6

304.1-F-01 filter

92

160

BC34

18,6

304.1-F-03 filter

100

170

AB 34

0,6

304.1-F-04 filter

92

160

BC 34

30,6

304.1-F-05 filter

92

160

BC 34

24,6

304.1-P-01 pump

180

BC34

18,6

304.1-P-02 conveying pump

250

CD 23

0,6

304.1-P-03 transport water pump

220

AB 34

0,6

304.1-P-04 transport water pump

220

AB 34

30,6

304.1-P-05 circulation pump

160

BC 34

30,6

304.1-P-06 circulation pump

160

BC 34

24,6

304.1-P-07 extract water pump

150

BD 23

0,6

304.1-Q-01 rotary valve

540

AB 34

0,6

550

AB 34

12,6

86800

AB 34

24,6

2000

DE 34

36,6

304.2-B-03 blower

1325

BC 34

0,6

304.2-B-11 blower

4000

BC 34

36,6

304.2-B-12 blower

580

BC 34

30,6

18000

CD 34

36,6

4000

CD 34

6,6

15000

BC 34

36,6

2060

C 34

0,6

10000

BC 34

24,6

304.1-Q-02 rotary valve


304.1-T-02 main extractor

540
16200

84000

electrical
motor
electrical
motor
electrical
motor
electrical
motor
electrical
motor
electrical
motor
electrical
motor
electrical
motor
electrical
motor

Process step 160


304.1-M-02 centrifuge

1200

304.2-D-12 cyclone

2800

304.2-D-13 dust separator

1000

304.2-D-14 cooling column

1800

304.2-E-07 cooler

1360

304.2-E-12 heater

3800

2400

304.2-E-14 cooler

180

220

CD 34

30,6

304.2-F-09 filter

100

170

CD 34

30,6

Date

Barth

created

303.1-F-02/03filter
303.1-H-01 die head

Date

120, 130, 140, 150, 160, 180

electrical
motor
electrical
motor
electrical
motor
electrical
motor

2 of 3
Remark

12

Process Step

Load List
Project

Project number

Thailand I

605520

equipment
Item no.

Designation

304.2-F-09 filter

Revision

Part of documentation

Number of Documentation

4. Building and Layout

Name

4.3

load
equipment
maximum
in
empty
operation load

part of the
building

loadbearing
level

[kg]

[kg]

[grid]

[m]

170

CD 34

30,6

250

BC 34

30,6

100

304.2-Q-11 rotary conveyor

200

210

DE 34

36,6

304.2-Q-12 rotary conveyor

210

220

CD 34

24,6

304.2-S-01 chips cooler

5200

22880

CD 34

6,6

304.2-T-11 predryer

4000

8900

CE 34

30,6

6900

10.04.2012 Page

checked

Bauer

31.05.2012

kind of
bearing

kind of
engine

angular
speed

number of
strokes

[min-1]

[stroke/min]

10

11

electrical
motor
electrical
motor
electrical
motor

electrical
motor

chips transportation

Process step 180


331.1-D-04 evaporator

2300

7850

DE 23

30,6

331.1-E-04 heat exchanger

2600

3800

CD 23

30,6

331.1-P-06 rotary-piston pump

475

490

DE 23

24,6

331.1-P-07 rotary-piston pump

475

490

DE 23

24,6

4600

40000

CD 23

0,6

331.2-A-03 agitator

1268

1268

CD 23

30,6

331.2-D-03 storage tank

3200

9060

CD 23

30,6

331.2-D-04 seal tank

400

980

CD 23

24,6

331.2-E-01 condenser

154

200

DE 23

36,6

331.2-E-02 heat exchanger

260

350

D 23

24,6

190

CD 23

18,6

300

750

DE 23

30,6

331.3-D-01 evaporator

5000

21000

EF 23

30,6

331.3-E-01 heat exchanger

5780

8900

DE 23

30,6

331.3-E-02 condenser

1482

1915

EF 23

36,6

filter

180

350

EF 23

24,6

331.3-P-01 centrifugal pump

297

310

CD 23

0,6

331.3-P-02 centrifugal pump

297

310

CD 23

0,6

331.3-P-03 centrifugal pump

331

350

EF 23

24,6

331.3-P-04 centrifugal pump

331

350

DE 23

24,6

331-S-01

storage tank

331.2-P-01 circulation pump


331.2-T-01 return flux column

331.3-F01/2

190

yellow marked equipment is


preliminary

Date

Barth

created

[kg]

304.2-P-09 circulation pump

311.1-I

Date

120, 130, 140, 150, 160, 180

electrical
motor
electrical
motor

electrical
motor

electrical
motor
electrical
motor
electrical
motor
electrical
motor

3 of 3
Remark

12

S-ar putea să vă placă și