Sunteți pe pagina 1din 2

Federal Register / Vol. 70, No.

125 / Thursday, June 30, 2005 / Notices 37815

avoid or lessen environmental impact. return this form, you will be removed g. Filed Pursuant to: Public Utility
The more specific your comments, the from our mailing list. Regulatory Policies Act of 1978, 16
more useful they will be. To ensure that U.S.C. 2705, 2708.
Availability of Additional Information
your comments are timely and properly h. Applicant Contact: Linda A. Parker,
recorded, please mail your comments so Additional information about the Small Hydro of Texas, Inc., 1298 FM
that they will be received in project is available from the 766, Cuero, Texas 77954. (361) 275–
Washington, DC on or before July 25, Commission’s Office of External Affairs 9395.
2005 and carefully follow these at 1–866–208 FERC or on the FERC i. FERC Contact: Monte TerHaar (202)
instructions: Internet website (http://www.ferc.gov) 502–6035 or monte.terhaar@ferc.gov.
• Send an original and two copies of using the ‘‘eLibrary’’ link. Click on the j. Cooperating agencies: We are asking
your letter to: Magalie R. Salas, eLibrary link, click on ‘‘General Federal, state, local, and tribal agencies
Secretary, Federal Energy Regulatory Search,’’ and enter the docket number with jurisdiction and/or special
Commission, 888 First St., NE., Room excluding the last three digits in the expertise with respect to environmental
1A, Washington, DC 20426; Docket Number field (i.e., PF05–11). Be issues to cooperate with us in the
• Label one copy of the comments for sure you have selected an appropriate preparation of the environmental
the attention of the Gas Branch 1, DG2E; date range. For assistance, please document. Agencies who would like to
and contact FERC Online Support at request cooperating status should follow
• Reference Docket No. PF05–11–000 FERCOnlineSupport@ferc.gov or toll the instructions for filing comments
on the original and both copies. free at 1–866–208–3676, or for TTY, described in item l below.
We will include all comments that we contact (202) 502–8659. The eLibrary k. Pursuant to § 4.32(b)(7) of 18 CFR
receive within a reasonable time frame link on the FERC Internet Web site also of the Commission’s regulations, if any
in our environmental analysis of the provides access to the texts of formal resource agency, Indian Tribe, or person
project. To expedite our receipt and documents issued by the Commission, believes that an additional scientific
consideration of your comments, the such as orders, notices, and rule study should be conducted in order to
Commission strongly encourages makings. form an adequate factual basis for a
electronic submission of any comments In addition, the FERC now offers a complete analysis of the application on
on this project. See Title 18 Code of free service called eSubscription that its merit, the resource agency, Indian
Federal Regulations 385.2001(a)(1)(iii) allows you to keep track of all formal Tribe, or person must file a request for
and the instructions on the issuances and submittals in specific a study with the Commission not later
Commission’s website at http:// dockets. This can reduce the amount of than 60 days from the date of filing of
www.ferc.gov under the ‘‘e-Filing’’ link time you spend researching proceedings the application, and serve a copy of the
and the link to the User’s Guide. Before by automatically providing you with request on the applicant.
you can submit comments, you will notification of these filings, document l. Deadline for filing additional study
need to create a free account which can summaries, and direct links to the requests and requests for cooperating
be created online. documents. To register for this service, agency status: 30 days from date of this
Once FGT formally files its go to http://www.ferc.gov/ notice.
application with the Commission, you esubscribenow.htm. All documents (original and eight
may want to become an official party to copies) should be filed with: Magalie R.
Magalie R. Salas,
the proceeding known as an Salas, Secretary, Federal Energy
‘‘intervenor.’’ Intervenors play a more Secretary.
Regulatory Commission, 888 First
formal role in the process and are able [FR Doc. E5–3403 Filed 6–29–05; 8:45 am] Street, NE., Washington, DC 20426.
to file briefs, appear at hearings, and be BILLING CODE 6717–01–P The Commission’s Rules of Practice
heard by the courts if they choose to require all intervenors filing documents
appeal the Commission’s final ruling. with the Commission to serve a copy of
An intervenor formally participates in a DEPARTMENT OF ENERGY that document on each person on the
Commission proceeding by filing a Federal Energy Regulatory official service list for the project.
request to intervene. Instructions for Commission Further, if an intervenor files comments
becoming an intervenor are included in or documents with the Commission
the User’s Guide under the ‘‘eFiling’’ [Project No. 12588–000] relating to the merits of an issue that
link on the Commission’s website. may affect the responsibilities of a
Please note that you may not request Hydraco Power, Inc; Notice of particular resource agency, they must
intervenor status at this time. You must Application Tendered for Filing With also serve a copy of the document on
wait until a formal application is filed the Commission, and Soliciting that resource agency.
with the Commission. Additional Study Requests Additional study requests and
Affected landowners and parties with June 22, 2005. requests for cooperating agency status
environmental concerns may be granted Take notice that the following may be filed electronically via the
intervenor status upon showing good hydroelectric application has been filed Internet in lieu of paper. The
cause by stating that they have a clear with the Commission and is available Commission strongly encourages
and direct interest in this proceeding for public inspection. electronic filings. See 18 CFR
that would not be adequately a. Type of Application: Exemption 385.2001(a)(1)(iii) and the instructions
represented by any other parties. You do from License, 5 MW or Less. on the Commission’s Web site (http://
not need intervenor status to have your b. Project No.: 12588–000. www.ferc.gov) under the ‘‘e-Filing’’ link.
environmental comments considered. c. Date Filed: May 3, 2005. m. This application is not ready for
d. Applicant: Hydraco Power, Inc. environmental analysis at this time.
Environmental Mailing List e. Name of Project: A. H. Smith Dam n. The proposed project consists of:
If you wish to remain on our Project. (1) An existing 10.5-foot-high by 86.5-
environmental mailing list, please f. Location: On the San Marcos River foot-long concrete dam with a 20-foot-
return the Information Request Form near the town of Martindale, Caldwell wide concrete apron; (2) an existing 3-
included in Appendix 2. If you do not County, Texas. foot-wide by 4-foot-high wooden

VerDate jul<14>2003 16:26 Jun 29, 2005 Jkt 205001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:\FR\FM\30JNN1.SGM 30JNN1
37816 Federal Register / Vol. 70, No. 125 / Thursday, June 30, 2005 / Notices

stopgate positioned in the east bank of with the Commission and is available Commission strongly encourages
the dam; (3) a 10.62-acre impoundment; for public inspection. electronic filings. See 18 CFR
(4) an existing 20-foot-wide by 30-foot- a. Type of Application: Subsequent 385.2001(a)(1)(iii) and the instructions
long powerhouse; (5) an existing License. on the Commission’s Web site (http://
generator with installed capacity of 150 b. Project No.: 9184–013. www.ferc.gov) under the ‘‘eFiling’’ link.
kilowatts (kW); (6) an existing 150 kW c. Date Filed: June 10, 2005. m. This application is not ready for
turbine; and (7) an existing trashrack of d. Applicant: Flambeau Hydro, LLC. environmental analysis at this time.
unknown dimensions. e. Name of Project: Danbury n. The existing Clam River Project
The proposed project consists of an Hydroelectric Project. consists of: (1) A 30-foot-high dam with
existing dam, generating equipment, f. Location: On the Yellow River in a 48-foot-long, three-bay concrete
and powerhouse which ceased Burnett County, near Danbury, spillway section equipped with six steel
hydropower generation in early 1990. Wisconsin. The project does not occupy slide gates; (2) a 300-foot-long earthen
Hydraco proposes to restore these federal lands. dike that connects to the north side of
facilities. g. Filed Pursuant to: Federal Power the spillway; (3) a 255-acre reservoir
o. A copy of the application is on file Act 16 U.S.C. 791 (a)–825(r). with a normal water surface elevation of
with the Commission and is available h. Applicant Contact: Scott Klabunde, 929.0 feet msl; (4) a forebay structure
for public inspection. This filing is North American Hydro, Inc., PO Box with two steel slide gates leading to; (5)
available for review at the Commission 167, Neshkoro, WI 54960; 920–293– two 26-foot-long, 5.75-foot-diameter
in the Public Reference Room or may be 4628 ext. 14. penstocks to convey flow to; (6)
viewed on the Commission’s Web site at i. FERC Contact: Timothy Konnert, powerhouse 1 integral with the dam
http://www.ferc.gov using the (202) 502–6359 or containing two generating units with a
‘‘eLibrary’’ link. Enter the docket timothy.konnert@ferc.gov. combined capacity of 476 kW; (7) a
j. Cooperating agencies: We are asking power canal headworks structure with
number excluding the last three digits in
Federal, state, local, and tribal agencies stoplogs; (8) a 53-foot-wide, 2,500-foot-
the docket number field to access the
with jurisdiction and/or special long power canal; (9) a 95-foot-long,
document. For assistance, contact FERC
expertise with respect to environmental 1.67-foot-diameter penstock to convey
online support at
issues to cooperate with us in the flow from the power canal to; (10)
ferconlinesupport@ferc.gov or toll-free
preparation of the environmental powerhouse 2 containing a generating
at 1–866–208–3676, or for Text
document. Agencies who would like to unit with a capacity of 600 kW; and (11)
Telephone (TTY) call (202) 502–8659. A
request cooperating status should follow appurtenant facilities. The applicant
copy is also available for inspection and
the instructions for filing comments estimates that the average annual
reproduction at the address in item h
described in item l below. generation would be 3,844 megawatt
above.
k. Pursuant to § 4.32(b)(7) of 18 CFR hours using the three generating units
p. With this notice, we are initiating
of the Commission’s regulations, if any with a combined capacity of 1,076 kW.
consultation with the Texas State
resource agency, Indian Tribe, or person o. A copy of the application is
Historic Preservation Officer (SHPO), as
believes that an additional scientific available for review at the Commission
required by section 106, National
study should be conducted in order to in the Public Reference Room or may be
Historic Preservation Act, and the
form an adequate factual basis for a viewed on the Commission’s Web site at
regulations of the Advisory Council on
complete analysis of the application on http://www.ferc.gov using the
Historic Preservation, 36 CFR 800.4.
its merit, the resource agency, Indian ‘‘eLibrary’’ link. Enter the docket
q. Procedural schedule and final
Tribe, or person must file a request for number excluding the last three digits in
amendments: A separate notice will be
a study with the Commission not later the docket number field to access the
posted with the Commission’s proposed
than 60 days from the date of filing of document. For assistance, contact FERC
Hydro Licensing Schedule and a
the application, and serve a copy of the Online Support at
schedule for filing final amendments to
request on the applicant. FERCOnlineSupport@ferc.gov or toll-
the application.
l. Deadline for filing additional study free at 1–866–208–3676, or for TTY,
Magalie R. Salas, requests and requests for cooperating (202) 502–8659. A copy is also available
Secretary. agency status: August 8, 2005. for inspection and reproduction at the
[FR Doc. E5–3402 Filed 6–29–05; 8:45 am] All documents (original and eight address in item h above.
BILLING CODE 6717–01–P
copies) should be filed with: Magalie R. You may also register online at
Salas, Secretary, Federal Energy http://www.ferc.gov/docs-filing/
Regulatory Commission, 888 First esubscription.asp to be notified via
DEPARTMENT OF ENERGY Street, NE., Washington, DC 20426. email of new filings and issuances
The Commission’s Rules of Practice related to this or other pending projects.
Federal Energy Regulatory require all intervenors filing documents For assistance, contact FERC Online
Commission with the Commission to serve a copy of Support.
that document on each person on the p. With this notice, we are initiating
[Project No. 9184–013]
official service list for the project. consultation with the Wisconsin State
Flambeau Hydro, LLC; Notice of Further, if an intervenor files comments Historic Preservation Officer (SHPO), as
Application Tendered for Filing with or documents with the Commission required by section 106, National
the Commission, Soliciting Additional relating to the merits of an issue that Historic Preservation Act, and the
Study Requests, and Establishing may affect the responsibilities of a regulations of the Advisory Council on
Procedural Schedule for Relicensing particular resource agency, they must Historic Preservation, 36 CFR 800.4.
and a Deadline for Submission of Final also serve a copy of the document on q. Procedural schedule and final
Amendments that resource agency. amendments: The application will be
Additional study requests and processed according to the following
June 21, 2005. requests for cooperating agency status Hydro Licensing Schedule. Revisions to
Take notice that the following may be filed electronically via the the schedule will be made as
hydroelectric application has been filed Internet in lieu of paper. The appropriate. The Commission staff

VerDate jul<14>2003 16:26 Jun 29, 2005 Jkt 205001 PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 E:\FR\FM\30JNN1.SGM 30JNN1

S-ar putea să vă placă și