Sunteți pe pagina 1din 44

South Pars Gas Field Development

Phases 13

Pars Oil and Gas

Plant: Onshore Facilities

Company

Doc. Number : DB-0013-999-P332-201

Rev.No.: 2 Class: 2

EQUIPMENT AND ENGINEERING DOCUMENTS


IDENTIFICATION AND NUMBERING

23-Jan-11

APPROVED FOR
CONSTRUCTION

H.Malek N.Fallah N.Fallah F.zanjani Dr.Gilandost

Detailed Engineering
1

28-SEP-10

22-SEP-10

REV.

DATE

APPROVED FOR
CONSTRUCTION

H.Malek N.Fallah N.Fallah F.zanjani Dr.Gilandost

APPROVED FOR
CONSTRUCTION
DESCRIPTION

H.Malek

N.Fallah

PREP.

CHKD.

N.Fallah

F.zanjani

Dr.Gilandost

P.M.

P.D.

CONTRACTOR

COMPANY

APPD.

APPD.

APPD.

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 1 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

TABULATION OF REVISED PAGES

PAGE

Rev.0 Rev.1 Rev.2

PAGE

Rev.0 Rev.1 Rev.2

26

27

28

29

30

31

32

33

34

10

35

11

36

12

37

13

38

14

39

15

40

16

41

17

42

18

43

19

44

20

45

21

46

22

47

23

48

24

49

25

50

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 2 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

CONTENTS
1. SCOPE..................................................................................................................... 4
2. PURPOSE.................................................................................................................... 4
3. DEFINITIONS ............................................................................................................. 4
4. RESPONSIBILITIES.................................................................................................... 4
5. INSTRUCTIONS ......................................................................................................... 5
5.1 EQUIPMENT IDENTIFICATION AND NUMBERING.................................................... 5
5.1.1 General rule .............................................................................................................. 5
5.1.2 Identical equipment............................................................................................... 6
5.1.3 Associated equipment .......................................................................................... 7
5.1.4 Identification of electric and control equipment .................................................8
5.2 DOCUMENTS IDENTIFICATION & NUMBERING.........................................................8
5.2.1 Document numbering (other than drawings) .........................................................8
5.2.2 Drawing numbering..................................................................................................10
5.2.3 Revisions ................................................................................................................. 14
5.2.4 Electrical numbering .............................................................................................. 14
5.2.5 Line identification.................................................................................................... 17
6. ATTACHMENTS ........................................................................................................ 18
ATTACHMENT 6.1................................................................................................................. 19
ATTACHMENT 6.2................................................................................................................. 24
ATTACHMENT 6.3................................................................................................................. 25
ATTACHMENT 6.4................................................................................................................. 26
ATTACHMENT 6.5................................................................................................................. 38
ATTACHMENT 6.6................................................................................................................. 39
ATTACHMENT 6.7................................................................................................................. 43
ATTACHMENT 6.8................................................................................................................. 44

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 3 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

1.

Rev. 2

SCOPE
This project procedure applies to all main equipment implemented in and to the
engineering documents produced for the SOUTH PARS FIELD DEVELOPMENT PHASE 13
Project.
This document is applicable to ONSHORE FACILITIES, SEALINES and ONSHORE GAS
PIPELINE FACILITIES.

2.

PURPOSE
This procedure sets out the various identification and numbering systems applied to the
equipment (as item number) and to the engineering documents.
The purpose of this procedure is also to define the format, contents and responsibilities in
the preparation, approval and maintenance of a logical document identification and
numbering system.
As far as possible, numbering of documents and drawings issued by suppliers, licensors
and subcontractors will follow this procedure.

3.

DEFINITIONS
The Item number is an alpha-numerical number used to identify a specific piece of
equipment.

4.

RESPONSIBILITIES
The Engineering Manager is responsible for the content of this procedure and for the control
of its application.
The Senior Lead Process Engineer is responsible for the correctness of the item numbers
allocated to the main equipment ; he is also responsible for originating and maintaining the
Equipment list.
The Lead Discipline Engineers shall be responsible for assigning an originator for each
document originated within their area of responsibility.
They shall be responsible for the allocation of the sequential number element of the
document number, and for the correctness of all identification numbers.

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 4 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

INSTRUCTIONS

5.1

Equipment identification and numbering

5.1.1

General rule
Each equipment is identified with an item number as follows :
Unit Number

Equipment
Identification

Section/Train
Number

Serial Number

Duplication
Suffix

***

**

**

With :
Unit Number (three digits)as per Attachment 6.1.
Equipment Identification (max. two digits) as per Attachment 6.2.
Sequential Number made up of :
a Section/Train Number within the unit the equipment belongs to, as per attachment
6.1 (one digit),
a Serial Number taken from the equipment list specific to a type of equipment per
section of unit starting with 01,
Duplication Suffix (one letter) for identical equipment.

103

01

Condensate Stabilization Unit


identical

Duplication suffix for


equipment

Pump

N 1 in the pump list specific


the 2nd train of unit 103
2nd train of the unit 103

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 5 of 44

to

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

5.1.2

Identical equipment

5.1.2.1

Principles

Rev. 2

Three separate cases have to be considered :


Identical equipment simultaneously operated,
Spare equipment,
Shells of multi-shell heat exchangers.
a. Identical equipment simultaneously operated
Identical equipment simultaneously operating for the same service are identified with the
same item number, as indicated in paragraph 5.1.1, followed by the letter A, B, C ...
depending of the number of identical equipment.
For instance, 125-P-101A ,125-P-101B and 125-P-101C identify three identical pumps
operating in parallel in unit 125.
b. Spare equipment
The operating equipment and the corresponding installed spare equipment are
interchangeable. The operating equipment and installed spare equipment are identified
by the same item number followed by the letter A, B, C or D as necessary.
For instance, 103-P-101A is the spare pump for 103-P-101B and vice versa.
c. Shells of multi-shell heat exchanger
When a heat exchanger includes several shells installed in series, in parallel or in
series/parallel, each shell is identified by the item number of the heat exchanger followed
by a letter A, B, C ... according to the number of shell forming the heat exchanger.
For instance, the item numbers 103-E-101A and 103-E-101B identify each of the two
shells of the heat exchanger 103-E-101.

5.1.2.2

Application on plot plans


a. Heat exchangers

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 6 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

Itemization starts from the left up to the right, exchanger A being on the left when
looking to the battery of exchangers, standing in front of their inlet chamber. In case of a
stacked battery of exchangers, itemization starts from top exchanger and continue to the
bottom one, then from left to right.
b. Air cooled heat exchangers
Itemization starts from the left and continue to the right, exchanger A being on the left
when looking to the battery of exchangers, standing in front of product inlet header.
c. Multiple air fans on air cooled heat exchangers
Nearest fan when standing close to product inlet header is itemized A, then the following
is itemized B ... etc.
d. Bottoms headers of storage tanks
Itemization starts from the left and continues to the right when looking to the tank,
standing in the entry side of heating fluid. Itemization starts from closest element from
fluid entry, in case of multiple elements.
e. Tanks agitators
Clockwise itemization starting from product suction nozzle.
f. Pumps and other mechanical horizontal equipment
Itemization starts from the left and continues to the right, Item A being on the left when
standing in front of the pump driver.
g. Other non defined equipment
As a principle, from the left to the right, when standing in front of the equipment, on the
maintenance access area.

5.1.3

Associated equipment
Driving devices are identified separately from the other pieces of equipment associated to
the main equipment.

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 7 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201
5.1.3.1

Rev. 2

Driving devices
A driving device is identified by the item number of the driven equipment to which is added a
letter identifying the type of the driving device (electric motor, turbine, diesel motor ...). This
letter follows the identification type of the driven equipment. The letter M is used to identify
electric motors. The letters D, G, S and T are used as per attachment 6.2.
For instance, 103-PM-101 identifies the electric motor driving the pump 103-P-101.

5.1.3.2

Other associated equipment


The other associated equipment such as the lubricating pump of a compressor, for instance,
is identified in accordance with the general rules depicted in paragraph 5.1.1.

5.1.4

Identification of Instrument , Electrical and Telecom. equipment


Refer to paragraph 5.2.4 of this procedure for Instrument.

5.2

Documents identification & numbering

5.2.1

Document numbering (other than drawings)

5.2.1.1

Equipment Process Specification


Equipment process specifications shall be numbered as follows:
Prefix

Project
Number

Unit
Number

Equipment
Identification

Sequential
Number

SPP

0013

***

**

***

Where :
Prefix as per Attachment 6.3 (SPP for process data sheets)
Project Number : Engineer Project Number 0013
Unit Number as per Attachment 6.1.
Equipment Identification as per Attachment 6.2.
Sequential Number : same as above paragraph 5.1.1

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 8 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

5.2.1.2

Rev. 2

Instrument Process Specification


Instrument process specifications shall be numbered as follows :
Prefix

Project
Number

Unit
Number

Instrument
Ident. Letters

Sequential
Number

SPP

0013

***

****

***

Where :
Prefix as per Attachment 6.3
Project Number : Engineer Project Number 0013
Unit Number as per Attachment 6.1.
Instrument identification letters are as per ISA S 5-1.
Sequential number as per paragraph 5.1.1,

5.2.1.3

Mechanical Specification
Mechanical specifications (vessels, heat exchangers, rotating machines, etc...) shall be
numbered as follows :
Prefix

Project
Number

Unit
Number

Material
Code

Serial
Number

SP

0013

***

****

***

Where :
Prefix as per Attachment 6.3 : SP for mechanical specification or data sheet,
Project Number : Engineer Project Number 0013
Unit Number as per Attachment 6.1.
Material code as per Attachment 6.4,
Serial Number starting with 001

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 9 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

5.2.1.4

Rev. 2

Other Documents
All other documents shall be issued on the same following format :
Prefix

Project
Number

Unit
Number

Material
Code

Serial
Number

****

0013

***

****

****

Where :
Prefix (max. 4 digits) as per Attachment 6.3.
Project Number : Engineer Project Number 0013
Unit number as per Attachment 6.1.
Material code as per Attachment 6.4.
Serial number starting with 0001,
Note: For P.O. doc. serial no. shall be followed according to INSTRUCTION TO VENDOR
DOCUMENTATION

5.2.2

Drawing numbering
Numbering of drawings shall be as follows :

5.2.2.1

Block Flow Diagrams


Block flow diagrams shall be numbered as follows :
Prefix

Project
Number

Unit
Number

Material
Code

Serial
Number

****

0013

***

0010

****

Where :

Prefix (max. 4 digits) as per Attachment 6.3.

Project Number : Engineer Project Number 0013


This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 10 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

Unit Number as per Attachment 6.1.


Material code : 0010, as per Attachment 6.4,
Serial Number starting with 0001

5.2.2.2

Process Flow Diagrams


Note : the same type of identification will be used for Process Flow Diagrams, Heat &
Material Balances and Process logic Diagrams.
Process flow diagrams shall be numbered as follows :
Prefix

Project
Number
0013

****

Unit
Number

Material
Code

***

Sequential
Number

0020

T0YU

Where :

Prefix (max. 4 digits) as per Attachment 6.3.

Project Number : Engineer Project Number 0013


Unit number as per Attachment 6.1.
Material code : 0020, as per Attachment 6.4,
Sequential number with :
T=0
T=1
T=3
T=4

for Process Flow Diagrams


for Process Logic Diagrams
for Drain System PFD
for Utility Block Diagram

Second digit = 0
Y=0
for Process Flow Diagrams and Process Logic Diagrams

Y=1

for Heat & Material Balances, for the first running case

Y=2

for Heat & Material Balances, for the second running case , etc...

U:

Serial number starting with 1 up to 9

Note : as a consequence, heat & material balances, associated with PFD 0001, are
identified with the sequential number 0011, 0021, 0031, etc.
5.2.2.3

Process Piping & Instrument Diagrams


Process Piping & Instrument Diagrams shall be numbered as follows :
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 11 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

Prefix

Project
Number

Unit
Number

Material
Code

Sequential
Number

****

0013

***

0030

0YX

Where :

Prefix (max. 4 digits) as per Attachment 6.3.

Project Number : Engineer Project Number 0013


Unit number as per Attachment 6.1.
Material code = 0030, as per Attachment 6.4.
Sequential number with four digits starting with 0 followed by :
Y : section number equals to 1 for a single section unit, and to 1, 2, 3 etc for multi
section units,
X : serial number (2 digits) starting from 01.

5.2.2.4

Process Unit Line Lists


Process units Line lists shall be numbered as follows :
Prefix

Project
Number

Unit
Number

Material
Code

Sequential
Number

LL

0013

***

0040

***

Where :
Prefix : as per Attachment 6.3
Project Number : Engineer Project Number 0013
Unit number as per Attachment 6.1.
Material code = 0040, as per Attachment 6.4.
Sequential number with three digits :
starting with 001

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 12 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

5.2.2.5

Rev. 2

Shelter Drawings
Shelter Drawings shall be numbered as follows :
Prefix

****

Project
Number
0013

Unit
Number

Material
Code

Sequential
Number

***

****

1Y**

Where :

Prefix (max. 4 digits) as per Attachment 6.3.

Project Number : Engineer Project Number 0013


Unit number as per Attachment 6.1.
Material code as per Attachment 6.4.
Sequential number with four digits followed by
Y

: For Architectural drawings: 0


For Shelter Foundations: 1
For Shelter Structures: 2
For Equipment Foundation under Shelters: 3
: Serial number (2 digits) starting from 01.

**

5.2.2.6

Other Drawings
Drawings other than Block flow diagrams, PFDs, UFDs, P&IDs and Line Lists shall be
numbered as follows :

Prefix

****

Project
Number
0013

Unit
Number

Material
Code

Sequential
Number

***

****

Y***

Where :

Prefix (max. 4 digits) as per Attachment 6.3.

Project Number : Engineer Project Number 0013


Unit number as per Attachment 6.1.
Material code as per Attachment 6.4.
Sequential number with four digits followed by
Y

: Section of train number as per Attachment 6.1

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 13 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

: Serial number (3 digits) starting from 001.

***

5.2.3

Revisions
The revision identification for documents shall be done according to the following rule :
For preliminary internal issue of documents revision letters XA, XB, X0, X1 shall be used.
Documents internally issued under interdiscipline Check (IDC) revision letter shall be A,
B, C etc.
Documents issued externally: revision letter shall be 0, or more when revised.

5.2.4
5.2.4.1

Electrical numbering
Equipment in substation
Equipment located in substation shall be as follows :
Substation
Number

Equipment

Voltage

Sequential
number

***

**

**

Where :
Substation number as per Attachment 6.5.
Equipment number as per Attachment 6.5
Voltage as per Attachment 6.5 (for transformers, primary voltage followed by
secondary voltage will be indicated)
Sequential numbers starting with 1 (for transformers feeding a switchboard with n as
sequential number, first transformer sequential number will be n1, second will be n2,
etc.)
Switchboard busbar and compartments
Left or front busbar :

Right or rear busbar :

Emergency busbar :

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 14 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

Switchboard compartments shall be numbered as below (front elevation) :

2 A1
3 A1

1 E1

2 A2

4 A1

2 B1
1A

1B

4 B1

1 E2
1 E3

3 B1

2 A3
1 E4
3 A2

2 B2

4 B2

2 A4
Legend :

Note :

1 E5
1A

Busbar A incoming section

1B

Busbar B incoming section

Busbar coupling or bus tie

Emergency busbar (E) may not exist

Busbar Trunking shall be as follows :


Switchboard number / BT *
* = A or B for busbar A or B
Transformer neutral impedance shall be as follows :
Transformer number / NI
UPS batteries shall be as follows :
UPS number / BA *

5.2.4.2

* = Sequential numbers starting with 1


Cables
Electrical cables shall be as follows :
Equipment
number

Cable
type

Serial
number

Sequential
number

*** *** ***

Where
Equipment number as per paragraph 5.1.1. and 5.2.5,
Cable type :
P for power cables

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 15 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

C for control cables


F for fiber cables
Serial numbers starting with 1
Sequential number as follows :
a for the first cable
b for the second cable
c for the third cable
5.2.4.3

Equipment located in units


Electrical motors
Electrical motors shall be identified as per paragraph 5.1.1,
Local control stations
Local control stations shall be identified by the corresponding motor identification.
Junction boxes
Junctions boxes shall be identified by the corresponding motor or equipment
identification.
Welding sockets / local panels
Welding sockets and local panels shall be as follows :
Unit
number

Electrical
Material

Sequential
number

***

***

**

Where
Unit number : as per Attachment 6.1
Electrical material :
WS

for welding sockets

NLP

for normal local panel lighting

ELP

for local panel emergency lighting

SP

for local panels small power

Sequential number taken from 1 and up

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 16 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

Lighting circuits and fixtures shall be as follows :


Lighting panel n

Circuit serial n

Fixture serial n

*** *** **

**

**

Circuit serial n are taken from 1 and up.

5.2.5

Line Identification
Line numbering shall be as follows :
Line
Size

Fluid
Symbol

**

***

Unit
Section
Number Number
***

System
Number

Sequential
Number

Piping
Class

Insulation
Type

**

**

****

Where :
Line size : diameters in inches
Fluid symbol (three alpha-numerical digits) as per Attachment 6.6.
Unit number as per Attachment 6.1.
A Section/Train Number within the unit the equipment belongs to, as per Attachment
6.1(one digit).
System Number : as per Attachment 6.8.
Sequential number from 01 up to 99
Piping class as per doc nr. RP 0013 999 1300 001
Insulation type as per Attachment 6.7.

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 17 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

6.

Rev. 2

ATTACHMENTS
6.1

Numbering of units and sections

6.2

Equipment identification

6.3

Prefix/Nature of documents

6.4

Material codes

6.5

Electrical identification numbers

6.6

Fluid symbols

6.7

Insulation and tracing code

6.8

System number

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 18 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

ATTACHMENT 6.1
LIST AND NUMBERING OF UNITS AND SECTIONS
UNIT N

UNIT DESCRIPTION

SECTION /TRAIN N

1 PROCESS UNITS
100
Reception facilities 1
100
Reception facilities 2
101
Gas treating 1
101
Gas treating 2
101
Gas treating 3
101
Gas treating 4
102
MEG Regeneration and Mercury Removal Unit
102
MEG Regeneration and Mercury Removal Unit
102
MEG Regeneration and Mercury Removal Unit
102
MEG Regeneration and Mercury Removal Unit
102
MEG Regeneration and Mercury Removal Unit
102
MEG Regeneration and Mercury Removal Unit
103
Condensate stabilization
103
Condensate stabilization
104
Dehydration and mercury guard
104
Dehydration and mercury guard
104
Dehydration and mercury guard
104
Dehydration and mercury guard
105
Ethane recovery
105
Ethane recovery
105
Ethane recovery
105
Ethane recovery
106
Export gas compression and metering
106
Export gas compression and metering
106
Export gas compression and metering
106
Export gas compression and metering
106
Export gas compression and metering
106
Export gas compression and metering
106
Export gas compression and metering
107
NGL fractionation
107
NGL fractionation

1
2
1
2
3
4
1
2
3
4
5
6
1
2
1
2
3
4
1
2
3
4
1
2
3
4
5
6
7
1
2

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 19 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

LIST AND NUMBERING OF UNITS AND SECTIONS (Cont)

UNIT N

UNIT DESCRIPTION

SECTION /TRAIN N

1 PROCESS UNITS (Cont)


108

Sulphur recovery

108

Sulphur recovery

108

Sulphur recovery

108

Sulphur recovery

109

Sour water stripping

110

Back-up stabilization

111

Propane Refrigeration Unit

111

Propane Refrigeration Unit

111

Propane Refrigeration Unit

111

Propane Refrigeration Unit

111

Propane Refrigeration Unit

111

Propane Refrigeration Unit

112

Condensate Demercaptanization Unit

113

C3/C4 Caustic Regeneration Unit

113

C3/C4 Caustic Regeneration Unit

114

Propane treatment and drying

114

Propane treatment and drying

115

Butane treatment and drying

115

Butane treatment and drying

116

Ethane treatment and drying

116

Ethane treatment and drying

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 20 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

UNIT N

Rev. 2

UNIT DESCRIPTION

SECTION /TRAIN N

2 UTILITIES

120

Electrical Distribution

121

Steam generation and distribution

122

Fuel gas

123

Instrument and service air

124

Nitrogen

125A

Sea water intake

125B

Sea water intake and Boostering

126A

Desalination Package

126B

Desalinated water distribution

127

Water polishing

128

Potable Water

129

Waste effluents disposal

130

Fire water

131

Diesel
and
Emergency
Generation & Distribution

132

Cooling water

Electrical

1
1

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 21 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

LIST AND NUMBERING OF UNITS AND SECTIONS


UNIT N

UNIT DESCRIPTION

SECTION /TRAIN N

3 OFFSITES & STORAGES

140

Flares and blowdown Phase 13A

140

Flares and blowdown Phase 13B

141

Drains

142

Burn pit

143

Condensate Storage & export

144

Sulphur solidification Package

145

Propane refrigerant storage

146

Chemicals storage

147

Propane storage & Export

148

Butane storage & Export

149

Propane loading facilities (Not used)

150

Butane loading facilities (Not used)

Auxiliary equipment in Packages

4 - All units

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 22 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

UNIT N

Rev. 2

UNIT DESCRIPTION

SECTION /TRAIN N

4 MISCELLANEOUS
160

Interconnecting

161

Control room

162

Laboratory

163

Firefighting building

164

Workshop

165

Non-Process buildings

167

RTUs, PCS, MTU

168

Radios

171

Sealines

172

Onshore pipeline (Not used)

173

Sour Gas Pipe Lines

174

Fire and Gas

175

ESD

176

Technical rooms (substations , ITR and Transformer )

181

Sub interconnecting(unit 100 & 103)

182

Sub interconnecting(unit 101 & 104 & 105)

183

Sub interconnecting(unit 107 & 116)

184

Sub interconnecting(unit 108 & 144)

185

Sub interconnecting(unit 109 & 122)

186

Sub interconnecting(unit 113 & 114 & 115)

187

Sub interconnecting(unit 121 & 123 & 124)

188

Sub interconnecting(unit 126 & 127 & 128


& 132)

189

Sub interconnecting(unit 131 & 145 & 146)

190

Sub interconnecting(unit 140 & 141 & 142)

191

Sub interconnecting(unit 147 & 148)

192

Sub interconnecting(unit 120 & 131)

200

Launching Scraper Trap 56

201

Receiving Scraper Trap 56

999

General facilities

000

Interface / Interconnecting outside battery


limits

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 23 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

ATTACHMENT 6.2
EQUIPMENT IDENTIFICATION
FIRST DIGIT

PROCESS FUNCTION

Air coolers

Boiler

Column

Drum

Heat exchangers (condensers, coolers, reboilers)

Filter

FL

Flare

Electric generator

Fired furnaces, heaters, steam boilers

Ejectors

Compressors, blowers, fans

Scraper launchers/receivers

LA

Loading arm

Mixers, Agitators, static mixer

Pumps

Reactors

Storage tanks, neutralization units

Package Unit

Mobile equipment (e.g. mobile pumps, skids...)

Miscellaneous

SECOND DIGIT

SUPPORTING FUNCTION

Diesel engine

Gas motor

Electrical Motor

Steam turbine

Gas turbine

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 24 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

ATTACHMENT 6.3.
NATURE OF DOCUMENT / PREFIX
BOM
BFD
CBE

Bill of Materials
Block Flow Diagram
Commercial Bid Evaluation

CR
DB
DI

Conference Note (or Minutes of Meeting)


Basis document
Material requisition for Quotation

DW
INSP
MR

Drawing
Inspection Plan (First issue by contractor)
Material Requisition

RP
LD
LL

Project Specification
List of documents (e.g. Standard drawings)
Line List

NC
EL, NM
MTO

Note of calculation
List of equipment / materials
Material Take-Off

PFD
PID
PO

Process Flow Diagram


Piping and Instrument Diagram
Purchase Order

PP
SDOC, VP
SLD

Project Procedure
Vendor Suppliers Document Print
Single Line Diagram

SP
SPP
SK

Mechanical Specification (Data sheet)


Process Data Sheet / Specification
Sketch

TBE
UFD
MISC
PDP
POR
TOT
IP
LP
RT
WB

Technical Bid Evaluation


Utility Flow Diagram
Miscellaneous
Process Licensor Document
Purchase Order Requisition
Commissioning Procedure
Installation Procedure
Lifting and Transportation Procedure
Project Report
Welding Book

ATTACHMENT 6.4.
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 25 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

MATERIAL CODES
DISCIPLINE

GENERAL CLASS

CODE

GENERAL
000X General

GENERAL

0000

JOB INSTRUCTION / PROCEDURE

0001

PLANNING / SCHEDULING

0003

ESTIMATION / COST CONTROL

0005

DOCUMENT CONTROL

0007

GENERAL DOCUMENT

P332

BLOCK FLOW DIAGRAMS

0010

SPECIAL DESIGN CONSIDERATION

0011

PROCESS FLOW DIAGRAM (PFD)

0020

HEAT & MATERIAL BALANCES

0020

ESD LOGIC DIAGRAM

0020

MATERIAL FLOW DIAGRAM

0021

PROCESS / UTILITY P& ID

0030

INTERCONNECTING P& ID

0030 / 0040

PROCESS
00XX Process

PXXX Design basis

PROCESS / UTILITY LINE LIST

0040

FIRE FIGHTING P & ID / UTILITY BALANCE

0040

STANDARD MACHINES P& ID

0051

SPECIAL MACHINE P& ID

0052

PLOT PLAN , LAYOUT & ELEVATION, ANGLE VIEW

0060

HAZARDOUS AREA DRAWINGS

0070

FIRE PROTECTION DRAWINGS

0070

PROCESS DESIGN BASIS

P312

EQUIPMENT LIST

P312

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 26 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE

GENERAL CLASS

CODE

PROCESS (Cont)
LICENSOR PACKAGE

P312

WATER SYSTEM DESIGN BASIS

P442

FIRED EQUIPMENT

0100

MECHANICAL
0XXX

- FIRED HEATER, FURNACE, INCINERATOR


REACTION FURNACE BOILER, FLARE STACK
ELECTRIC HEATER
STEAM BOILER

0151

FLARE PACKAGE

0180

REMINERALIZATION AND CONDITIONING POTABLE


WATER PACKAGE

0201

CONDENSATE DEOIL PACKAGE

0212

POLISHING WATER PACKAGE

0213

SANITARY WATER TREATMENT PACKAGE

0221

NUTRALIZATION PACKAGE

0223

OILY WATER PACKAGE

0225

DESALINATION PACKAGE

0240

REACTOR

0400

COLUMN

0500

INTERNALS FOR COLUMN AND VESSEL

0570

HEAT EXCHANGER

0600

SHELL AND TUBE HEAT EXCHANGER

0610

PLATE TYPE HEAT EXCHANGER

0620

DOUBLE PIPE HEAT EXCHANGER

0630

COLD BOX

0640

AIR COOLER

0700

DRUM

0800

PUMP (CENTRIFUGAL)

0910

RECIPROCATING PUMP

0920

CHEMICAL INJECTION PACKAGE

0940

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 27 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE

GENERAL CLASS

CODE

MECHANICAL (Cont)
1XXX

MECHANICAL / ROTATING MACHINE GENERAL

1000

CENTRIFUGAL COMP. / FAN AND BLOWER

1010

RECIPROCATING COMP.

1020

AIR COMPRESSOR AND AIR DRYER

1030

GEN. STEAM TURBINE (HEAVY)

1110

GEN. GAS TURBINE (HEAVY)

1120

EXPANDER

1130

MECH. / ROTATING MACHINE DIESEL ENGINES

1140

INTEGRALLY GEARED CENTRIFUGAL AIR COMPRESSORS 1150


ROTARY TYPE POSITIVE DISPLACEMENT COMPRESSORS 1160

2XXX

3XXX

GEARS

1180

FILTER AND COALESCER

1210

SILENCER

1220

MISCELLANEOUS

1230

CRANE

2123

TANK

2500

FILTRATION PACKAGE / MEG PACKAGE

3300

CW REFRIGERATION PACKAGE

3310

N2 GENERATION PACKAGE

3332

LUBRICATION/SHAFT SEALING, CONT OIL SYS.

3335

HVAC EQUIPMENT

3400

OTHERS

3900

PIPING
13XX

STANDARD DWG, SPECIFICATION FOR


ACCESSORY

1300

TYPICAL HOOK-UP & DETAIL DRAWING

1301

PIPING DRAWING INDEX

1310

PIPING PLAN DRAWINGS

1320

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 28 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE
PIPING (Cont)

GENERAL CLASS

CODE

PIPING SECTION & DETAIL

1321

PIPING ROUTING STUDY DRAWINGS

1322

ISOMETRIC DRAWINGS

1330

STEAM TRACING DRAWINGS

1340

OTHERS

1350

BULK MATERIALS

1360

STANDARD PIPE SUPPORT DRAWING

1380

PIPING SUPPORT INDEX

1381

SPECIAL PIPE SUPPORT DRAWINGS

1382

GENERAL, STANDARD DETAIL DRAWING

1411

SITE PREPARATION, EARTHWORKS DRAWING

1421

SITE PREPARATION DETAIL DRAWING

1431

CIVIL WORKS
14XX Civil Works

CALCULATION (DRAINAGE, ROAD, SLOPE

1432

STABILITY, ETC.)
UNDER GROUND NETWORK DRAWING

1433

PAVING, SITE GRADING DRAWING

1441

UNDERGROUND STRUCTURE(PIT, BASIN,


MANHOLE, ETC.) DRAWING
SURFACE-RUN STRUCTURE(DITCH, TRENCH,
ETC.) DRAWING

1442

1443

CALCULATION (UNDERGROUND STRUCTURE)

1444

UNDERGROUND WORKS

1460

SPECIFICATION (DRAINAGE)

1482

SPECIFICATION (FENCE, SURFACING)

1483

SPECIFICATION (EARTHWORK & SITE


PREPARATION)

1486

SPECIFICATION (ROAD, TANK PAD)

1487

SITE SURVEY

1451

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 29 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE

GENERAL CLASS

CODE

INSTRUMENTATION
15XX

SYMBOL & LEGEND

1500

INSTRUMENT LIST

1501

I/O LIST FOR ESD

1502

I/O LIST FOR ALL FGS FIRE ZONES

1504

REQUISITION FOR CONTROL AND SAFETY


SYSTEMS

1510

CONTROL SYSTEMS

1511

INSTRUMENT STUDIES(LEVEL)

1512

SAFETY SYSTEM

1513

ESD SYSTEM

1514

FIRE & GAS SYSTEM

1515

CAUSE & EFFECT MATRIX

1525

INSTRUMENT TEST PROCEDURE

1535

HOOK-UPS

1538

CONTROL VALVE

1541

CONSOLE ARRANGEMENT

1542

ON / OFF VALVE

1543

HYDRAULIC POWER STATION

1544

SAFETY RELIEF VALVE

1545

CONTROL ROOM LAYOUT

1551

TROUBLE SHOOTING LOOP DIAGRAM

1552

SINGLE LINE DIAGRAM

1561

INSTRUMENT CABLE ROUTE LAYOUT

1572

CABLE SCHEDULE

1574

WIRING DIAGRAM(J/B & INTER-CONNECTION)

1575

DESIGN INSTALLATION DETAIL

1577

INSTRUMENT AIR PIPING LAYOUT

1578

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 30 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE

GENERAL CLASS

CODE

INSTRUMENTATION (Cont)
INSTRUMENT WIRING LAYOUT
CONTROL AND SAFETY, INTERCONNECTING
DRAWING

1579
1581

ANALYSER

1585

SPECIFICATION FOR PACKAGE

1589

ANALYZER HOUSE

1590

FLOW INSTRUMENT

1591

PRESSURE / TEMPERATURE INSTRUMENT

1592

LEVEL INSTRUMENT

1593

INSTRUMENT BULK MATERIAL

1595

TELECOMMUNICATION SYSTEM GENERAL

1530

TELECOMMUNICATION RADIO

1530

TELECOMMUNICATION VOICE

1530

TELECOMMUNICATION MISCELLANEOUS

1530

SYMBOL & LEGEND, GENERAL NOTES

1600

HV MOTORS

1612

GENERATOR ELECTRICAL SYSTEM

1615

EARTHING & LIGHTNING SYSTEM

1620

EARTHING & LIGHTNING INSTALLATION DETAIL

1622

POWER SYSTEM

1630

EQUIPMENT LAYOUT

1631

POWER INSTALLATION DETAIL

1632

CABLE TRAY INSTALLATION DETAIL

1632

SINGLE LINE DIAGRAM/LAYOUT SUBSTATION

1633

LOAD SUMMARY

1634

LV SWITCH GEAR/SHEDDING/CONSUMER LIST

1635

DIAGRAM AND SCHEDULE

1636

TELECOMMUNICATION
15XX

ELECTRICAL
16XX

ELECTRICAL(Cont)

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 31 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE

GENERAL CLASS

CODE

AC/DC UPS

1637

CABLE TRAY SYSTEM

1639

LIGHTING SYSTEM

1640

LIGHTING INSTALLATION DETAIL

1642

EARTHING & LIGHTNING SYSTEM (BUILDING)

1661

SMALL POWER LAYOUT(BUILDING)

1662

LIGHTING SYSTEM (BUILDING)

1663

ELECTRICAL HEAT TRACING LAYOUT

1672

CATHODIC PROTECTION LAYOUT

1674

TROUBLE SHOUTING DIAGRAM

1676

FOUNDATION LOCATION PLAN

1710

PIPERACK & STEEL STRUCTURE FOUNDATION


DRAWING

1721

CALCULATION (PIPERACK & STEEL STRUCTURE


FOUNDATION)

1722

SLEEPER, CULVERT DRAWING

1731

CALCULATION (CULVERT, SLEEPER)

1732

TANK FOUNDATION, DIKE, BUNDWALL DRAWING

1733

MISCELLANEOUS PIPE SUPPORT FOUNDATION


DRAWING

1741

EQUIPMENT FOUNDATION DRAWING

1751

CALCULATION (EQUIPMENT FOUNDATION)

1752

CIVIL DESIGN CRITERIA

1782

SPECIFICATION (CONCRETE, ANCHOR BOLT)

1783

PIPERACK & STEEL STRUCTURE DRAWING

1811

CALCULATION (PIPERACK & STEEL STRUCTURE)

1812

MISCELLANEOUS PIPE SUPPORT DRAWING

1841

CIVIL WORKS
17XX Foundation

18XX Structure, Support

CALCULATION (MISCELLANEOUS PIPE


SUPPORT)
FENCE & GATE DRAWING

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 32 of 44

1842
1843

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE
CIVIL WORKS (Cont)

GENERAL CLASS

CODE

SINGLE LINE STRUCTURE

1860

SPECIFICATION (STRUCTURAL STEEL)

1882

BULK MATERIALS

1890

FIRE FIGHTING SYSTEM AND SAFETY CONCEPT,

1900

HSE
19XX

HAZOP, HEALTH/TOXIC
SAFETY / SECURITY

1950

SPECIFICATON

2010

STANDARD DRAWING

2001

LANDSCAPE DRAWING

2002

3D ARTIST VIEW

2003

ADMINISTRATION BUILDING (Only for unit 165)

2001

CONTROL BUILDING (Only for unit 161)

2002

MAIN WORKSHOP (Only for unit 164)

2003

FIRE FIGHTING STATION

2004

INDOOR WAREHOUSE

2005

OUTDOOR WAREHOUSE

2006

VEHICLE MAINTENANCE

2007

LABORATORY BUILDING

2008

TELECOMMUNICATION BUILDING

2009

CANTEEN No.1 (Only for unit 165)

2010

CANTEEN No.2

2011

SECURITY BUILDING

2012

CONTRACTOR BUILDING

2013

MAIN GATEHOUSE (GH1)

2014

SECONDARY GATEHOUSE (GH2)

2015

GATEHOUSE 3 (GH3)

2016

GATEHOUSE 4 (GH4)

2017

SITE TOILETS

2018

VIEW GALLERY

2019

SWITCHYARD (Only for unit 176)

2000

SUBSTATION No.1 (Only for unit 176)

2001

BUILDING
20XX

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 33 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2
SUBSTATION No.2 (Only for unit 176)

2002

SUBSTATION No.3 (Only for unit 176)

2003

SUBSTATION No.4 (Only for unit 176)

2004

SUBSTATION No.5 (Only for unit 176)

2005

SUBSTATION No.6 (Only for unit 176)

2006

SUBSTATION No.8 (Only for unit 176)

2008

SUBSTATION No.9 (Only for unit 176)

2009

SUBSTATION No.10 (Only for unit 176)

2010

CONTROL BUILDING(ONLY FOR UNIT125A)

2021

SUBSTATION NO.7(ONLY FOR UNIT125A)

2022

SERVICE BUILDING(ONLY FOR UNIT125A)

2025

GATE HOUSE(ONLY FOR UNIT125A)

2026

COLORINATION BUILDING(ONLY FOR UNIT125A)

2042

OFF GAS COMPRESSOR(U-103) SHELTER

2031

DRIERS REGENERATION COMPRESSOR


(U-104)SHELTER

2032

TREATED GAS COMPRESSOR(U-105) SHELTER

2033

EXPORT GAS COMPRESSOR(U106) SHELTER

2034

REFRIGERANT COMPRESSOR(U-147) SHELTER

2035

PROPANE RECOVERY PUMP SHELTER

2036

ETHANE RECOVERY GAS COMPRESSOR


SHELTER
COND. DEOILING/OXYGEN SCAVENRER
SHELTER

2037

2038

AIR COMP. SHELTER

2039

SEA WATER BOOSTER PUMPS SHELTER

2040

SEA WATER DESALINATION SHELTER

2041

HYPOCHIORITE DOSING/BIOCIDE CORRSION SHELTER 2042


FIRE WATER PUMP SHELTER

2043

PUMP HOUSE SHELTER

2044

DIESEL PUMP SHELTER

COOL. WATER REINF. PACKAGE SHELTER


This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 34 of 44

2045

2046

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE

GENERAL CLASS

CODE

BUILDING (Cont)
CONDENSATE STORAGE & EXPORT PUMP
SHELTER

2047

SULPHUR GRANULATION PACKAGE SHELTER

2048

PROPANE TRANSFER PUMP SHELTER

2049

FRESH METHANOL STORAGE SHELTER

2050

FRESH METHANOL TRANSFER SHELTER

2051

REFRIGERANT COMP. PUMP SHELTER

2052

PROPANE BOIL OFF GAS COMP.(U-147) SHELTER

2053

CHEMICAL STORAGE SHELTER

2054

FIRE FIGHTING STATION SHELTER

2055

CAR PARKING SHELTER

2056

LP FLARE STACK PUMP SHELTER

2062

MP/HP FLARE STACK PUMP SHELTER

2063

REFRIGERANT COMPRESSOR (U-111) SHELTER

2064

ETHANE REGENERATION COMPRESSOR (U-116)


SHELTER

2065

BULK MATERIALS

2090

EQUIPMENT IN WORKSHOP & WAREHOUSE

2100

CRANE

2123

LABORATORY

2130

CYLINDERICAL STORAGE TANKS

2500

LPG STORAGE TANKS

2550

CHEMICALS

2610

LUBRICANTS

2620

CATALYSTS

2630

EQUIPMENT IN BUILDING
21XX

STORAGE SILOS
25XX

CHEMICALS
26XX

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 35 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

DISCIPLINE

Rev. 2

GENERAL CLASS

CODE

ACOUSTICS
60XX

ACOUSTIC AND NOISE CONTROL

6000

ENVIRONMENTAL SPECIFICATION

6200

WELDING & FABRICATION SPECIFICATION

6300

PASSIVE FIRE PROOFING

6351

INSULATION

6500

PAINTING / COATING

6600

GENERAL

7000

PROCEDURE / MANUAL

7100

NOTICE / REPORT

7200

TPA / SUPERVISION

7300

SUBCONTRACTING

7400

TEST / INSPECTION

7500

PACKING / MARKING / SHIPPING / TRANSPORTATION

7600

EXPEDITING

7700

OTHERS

7800

ENVIRONMENTAL
62XX
WELDING
63XX
INSULATION
65XX
PAINTING
66XX
PROCUREMENT
7XXX

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 36 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

DISCIPLINE

GENERAL CLASS

CODE

CONSTRUCTION
8XXX

GENERAL / ADMINISTRATION

8000

PIPING

8130

CIVIL

8140

INSTRUMENTATION

8150

TELECOMMUNICATION

8153

ELECTRICAL

8160

FOUNDATION

8170

STEEL STRUCTURE

8180

HSE

8190

BUILDING / ARCHITECTURE

8200

EQUIPMENT IN BUILDING

8210

MECHANICAL

8300

HVAC & PLUMBING

8340

QA / QC

8700

CAMP / TEMPORARY FACILITY

8800

OTHERS

8900

General

9100

Process

9200

Piping

9300

Building

9400

PRECOMM. /
COMMISSIONING
91XX

ESD System

9500

Fire& Gas System

9600

Electrical

9700

HSE

9800

Material

9900

Manpower

9990

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 37 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

ATTACHMENT 6.5.

ELECTRICAL IDENTIFICATION NUMBERS


SUBSTATION NUMBERS

Substation n1
Substation n2
Substation n3
Substation n4
Substation n5
Substation n6
Substation n7
Substation n8
Substation n9
Substation n10
Switchyard
EQUIPMENT NUMBERS
S
ES
TR
G
UPS
PLC

Switchboard
Emergency switchboard
Transformer
Generator
AC/DC uninterruptible power supply
Programmable Logic Controller

VOLTAGES
0
1
2
3

132 KV
33 kV
11 kV
6.6 kV

4
5
6

400 V
230 V
230 V (UPS)

7
8

110 V DC
48 V DC

24 V DC

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 38 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

ATTACHMENT 6.6
FLUID SYMBOLS
Air
EA
IA
PA
UA

Exhaust Air
Instrument Air
Process Air
Utility Air

Closed drains
DA
DC
DP
DR
DS
MD
MT
SD

Amine Drain
Caustic Drain
Cold Drain (above ground)
Hydrocarbon Drain
Sour Water Drain
Glycol Drain (MEG)
Methanol Drain
Disulfide Oil Drain

Chemicals
AF
AV
BI
CD
CE
CG
CK
DE
FF
HY
ME
MO
PH
OX
RE
SA
SU
SY

Anti Foam
Volatile Amine
Biocide
Cleaning Agent (distillation)
Cleaning Agent (electrochlorination)
Coagulant
Corrosion Inhibitor
Demulsifier
Flocculant
Sodium Hypochlorite
Methanol
Morpholine
Phosphate
Oxygen Scavenger
Reverse Demulsifier
Sulfuric Acid
Sulphite
Sodium Hydroxide

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 39 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

Steam Condensates
CC
Cold Steam Condensates
CH
HP Steam Condensates
CL
LP Steam Condensates
CP
Polluted steam Condensates

Flare
FA
FA13A
FA13B
FB
FB13A
FB13B
FC
FC13A
FC13B
FD
FD13A
FD13B
FS
FS13A
FS13B
FT
FT13A
FT13B
FL
FJ
FK

High Pressure Wet Gas Flare Common header


High Pressure Wet Gas Flare Phase 13A
High Pressure Wet Gas Flare Phase 13B
Low Pressure Wet Gas Flare Common header
Low Pressure Wet Gas Flare Phase 13A
Low Pressure Wet Gas Flare Phase 13B
High Pressure dry and cold gas flare Common header
High Pressure dry and cold gas flare Phase 13A
High Pressure dry and cold gas flare Phase 13B
Low Pressure cold gas flare Common header
Low Pressure cold gas flare Phase 13A
Low Pressure cold gas flare Phase 13B
Medium Pressure wet gas flare Common header
Medium Pressure wet gas flare Phase 13A
Medium Pressure wet gas flare Phase 13B
Medium Pressure cold and dry gas flare Common header
Medium Pressure cold and dry gas flare Phase 13A
Medium Pressure cold and dry gas flare Phase 13B
LPG Tank Flare
Jetty Flare (by Others)
LLP Gas Header

Fuel
DO
FG

Diesel Oil
Fuel Gas (HP and LP)

Inert Gas
IG
N

Inergen gas
Nitrogen

Miscellaneous
ATM

Atmospheric

Vent

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 40 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

BB
BR
CA
HO
LO
SG
SO

Boiler blowdown
Brine reject
Catalyst
Hydraulic Circuit
Lube oil
Seal gas
Seal oil

Process
AM
CF
DF
G
GA
GM
GT
HC
L
LC
LS
PR
RC
SC
SS

Amine
Fresh caustic
Disulfide Oil
Hydrocarbon gas
Acid gas (H2S + CO2)
Glycol (MEG)
Glycol (TEG)
Hydrocarbon (Liquid gas)
Hydrocarbon liquid
Lean caustic
Sulfur (liquid)
Propane refrigerant
Rich Caustic
Spent caustic
Sulfur (solid)

Sewer
CS
HW
NW
OD
WD
AOC

Chemical sewer
Hot non-contaminated sewer
Non-contaminated sewer
Oily water sewer (open drain)
Domestic sewer
Accidentally Oil Contaminated Sewer

Steam
SH
SL

High Pressure Steam


Low Pressure Steam

Water
WA

Foam

Solution

Water

(fire

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 41 of 44

fighting)

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

BW

Boiler Feed Water

CWS

Cooling Water Supply

CWR

Cooling Water Return

DW

Drinking Water

FW

Fire Water

PW

Process Water (oily water)

RW

Desalinated Water

SWS

Sea Water Supply

SWR

Sea Water Return

TW

Demineralised Water

UW

Utility Water

WS

Sour Water

WT

Stripped Water

WW

Spent or Waste Water

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 42 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2

ATTACHMENT 6.7.

INSULATION AND TRACING CODE


A

Acoustic insulation

Solar insulation protection

Cold insulation

Dual insulation (Hot and Cold)

Electrical tracing

Hot insulation

Anti icing

Steam jacketed line

Anti condensation

Cold and acoustic insulation

No insulation

Personnel protection

Steam jacketing

Hot and acoustic insulation

Underground external coating

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 43 of 44

South Pars Gas Field Development Phase 13


Doc. No. DB-0013-999-P332-201

Rev. 2
ATTACHMENT 6.8.

SYSTEM NUMBER

CODE

UNIT DESCRIPTION

20

Electrical Distribution

21

Steam generation and distribution

22

Fuel gas

23

Instrument and service air

24

Nitrogen

25

Sea water intake and outfall

26

Sea water desalination

27

Water polishing

28

Process water & Utility Water & Drinking Water

29

Waste effluents disposal

30

Fire water
Diesel and Emergency Electrical Generation &

31

Distribution
32

Cooling water

33

Chemical

00

For process line (then 01,02,..if required by the


number of line)

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 44 of 44

S-ar putea să vă placă și