Sunteți pe pagina 1din 2

35416 Federal Register / Vol. 70, No.

117 / Monday, June 20, 2005 / Notices

To use PDF you must have Adobe via the internet in lieu of paper. See 18 comments on the described application.
Acrobat Reader, which is available free CFR 385.2001(a)(1)(iii) and the A copy of the application may be
at this site. If you have questions about instructions on the Commission’s Web obtained by agencies directly from the
using PDF, call the U.S. Government site at http://www.ferc.gov under the (e- Applicant. If an agency does not file
Printing Office (GPO), toll free, at 1– Filing(link. The Commission strongly comments within the time specified for
888–293–6498; or in the Washington, encourages e-filings. filing comments, it will be presumed to
DC, area at (202) 512–1530. l. Description of Request: The have no comments. One copy of an
applicant requests Commission agency’s comments must also be sent to
Note: The official version of this document approval to permit the expansion of
is the document published in the Federal
the Applicant’s representatives.
Scotty’s Trout Dock Marina. The
Register. Free Internet access to the official Magalie R. Salas,
edition of the Federal Register and the Code existing marina consists of nine covered
boat slips, 10 uncovered slips, a fishing Secretary.
of Federal Regulations is available on GPO
Access at: http://www.gpoaccess.gov/nara/ supply store, and a boat-fueling station. [FR Doc. E5–3146 Filed 6–17–05; 8:45 am]
index.html. After the proposed expansion, the BILLING CODE 6717–01–P
marina would contain a total of 28
Dated: June 14, 2005. covered slips. The marina is located at
Raymond Simon, Mile Marker 14 on Lake Taneycomo. DEPARTMENT OF ENERGY
Assistant Secretary for Elementary and m. Location of the Application: This
Secondary Education. filing is available for review at the Federal Energy Regulatory
[FR Doc. 05–12101 Filed 6–17–05; 8:45 am] Commission in the Public Reference Commission
BILLING CODE 4000–01–P Room 888 First Street, NE., Room 2A,
Washington, DC 20426 or may be [Project No. 2183]
viewed on the Commission’s Web site at
http://www.ferc.gov using the ‘‘e- Grand River Dam Authority; Notice of
DEPARTMENT OF ENERGY
Library’’ link. Enter the docket number Authorization for Continued Project
Federal Energy Regulatory excluding the last three digits in the Operation
Commission docket number field to access the
June 13, 2005.
document. For assistance, call toll-free
Notice of Application for Amendment 1–866–208–3676 or e-mail On June 2, 2003, the Grand River Dam
of License and Soliciting Comments, FERCOnlineSupport@ferc.gov. For TTY, Authority, licensee for the Markham
Motions To Intervene, and Protests call (202) 502–8659. A copy is also Ferry Project No. 2183, filed an
available for inspection and application for a new or subsequent
June 13, 2005. reproduction at the address in item h license pursuant to the Federal Power
Take notice that the following above. Act (FPA) and the Commission’s
application has been filed with the n. Individuals desiring to be included regulations. Project No. 2183 is located
Commission and is available for public on the Commission’s mailing list should on the Grand River in Mayes County,
inspection: so indicate by writing to the Secretary Oklahoma.
a. Application Type: Non-Project Use of the Commission. The license for Project No. 2183 was
of Project Lands and Waters. o. Comments, Protests, or Motions to issued for a period ending May 31,
b. Project No: 2221–033. Intervene: Anyone may submit 2005. Section 15(a)(1) of the FPA, 16
c. Date Filed: May 2, 2005. comments, a protest, or a motion to U.S.C. 808(a)(1), requires the
d. Applicant: Empire District Electric intervene in accordance with the Commission, at the expiration of a
Company. requirements of Rules of Practice and license term, to issue from year to year
e. Name of Project: Ozark Beach. Procedure, 18 CFR 385.210, 385.211, an annual license to the then licensee
f. Location: The project is located on 385.214. In determining the appropriate under the terms and conditions of the
the White River in Taney County, action to take, the Commission will prior license until a new license is
Missouri. consider all protests or other comments issued, or the project is otherwise
g. Filed Pursuant to: Federal Power filed, but only those who file a motion disposed of as provided in section 15 or
Act, 16 U.S.C. 791(a)–825(r). to intervene in accordance with the any other applicable section of the FPA.
h. Applicant Contact: Mr. Robert Commission’s Rules may become a If the project’s prior license waived the
Barchak, Manager of Land party to the proceeding. Any comments, applicability of section 15 of the FPA,
Administration, Empire District Electric, protests, or motions to intervene must then, based on Section 9(b) of the
602 Joplin Street, Box 127, Joplin, be received on or before the specified Administrative Procedure Act, 5 U.S.C.
Missouri 64802, 417/625–6160. comment date for the particular 558(c), and as set forth at 18 CFR
i. FERC Contact: Any questions on application. 16.21(a), if the licensee of such project
this notice should be addressed to Mr. p. Filing and Service of Responsive has filed an application for a subsequent
Steven Naugle at 202–502–6061, or e- Documents: Any filings must bear in all license, the licensee may continue to
mail address: steven.naugle@ferc.gov. capital letters the title ‘‘COMMENTS’’, operate the project in accordance with
j. Deadline for filing comments and or ‘‘RECOMMENDATIONS FOR TERMS the terms and conditions of the license
motions: July 5, 2005. AND CONDITIONS’’, ‘‘PROTEST’’, OR after the minor or minor part license
k. All documents (original and eight ‘‘MOTION TO INTERVENE’’, as expires, until the Commission acts on
copies) should be filed with: Ms. applicable, and the Project Number of its application. If the licensee of such a
Magalie R. Salas, Secretary, Federal the particular application to which the project has not filed an application for
Energy Regulatory Commission, 888 filing refers. A copy of any motion to a subsequent license, then it may be
First Street, NE., Washington DC 20426. intervene must also be served upon each required, pursuant to 18 CFR 16.21(b),
Please include the project number (P– representative of the Applicant to continue project operations until the
2221–033) on any comments or motions specified in the particular application. Commission issues someone else a
filed. Comments, protests, and q. Agency Comments: Federal, state, license for the project or otherwise
interventions may be filed electronically and local agencies are invited to file orders disposition of the project.

VerDate jul<14>2003 17:24 Jun 17, 2005 Jkt 205001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\20JNN1.SGM 20JNN1
Federal Register / Vol. 70, No. 117 / Monday, June 20, 2005 / Notices 35417

If the project is subject to section 15 16.21(a), if the licensee of such project 16.5-miles of 12-inch diameter pipeline
of the FPA, notice is hereby given that has filed an application for a subsequent located in Uintah County, Utah,
an annual license for Project No. 2183 license, the licensee may continue to including associated receipt and
is issued to the Grand River Dam operate the project in accordance with delivery points and appurtenances to a
Authority for a period effective June 1, the terms and conditions of the license non-jurisdictional affiliate, Questar Gas
2005 through May 31, 2006, or until the after the minor or minor part license Management. Applicants also request a
issuance of a new license for the project expires, until the Commission acts on determination under section 1(b) of the
or other disposition under the FPA, its application. If the licensee of such a NGA that upon abandonment the
whichever comes first. If issuance of a project has not filed an application for subject facilities will be non-
new license (or other disposition) does a subsequent license, then it may be jurisdictional gathering facilities, all as
not take place on or before June 1, 2006, required, pursuant to 18 CFR 16.21(b), more fully set forth in the application
notice is hereby given that, pursuant to to continue project operations until the which is on file with the Commission
18 CFR 16.18(c), an annual license Commission issues someone else a and open to public inspection. This
under section 15(a)(1) of the FPA is license for the project or otherwise filing may be also viewed on the Web
renewed automatically without further orders disposition of the project. at http://www.ferc.gov using the
order or notice by the Commission, If the project is subject to section 15 ‘‘eLibrary’’ link. Enter the docket
unless the Commission orders of the FPA, notice is hereby given that number excluding the last three digits in
otherwise. an annual license for Project No. 6514 the docket number field to access the
If the project is not subject to section is issued to the City of Marshall, document. For assistance, call (202)
15 of the FPA, notice is hereby given Michigan for a period effective June 1, 502–8659 or TTY, (202) 208–3676.
that the Grand River Dam Authority is 2005 through May 31, 2006, or until the Any questions regarding this
authorized to continue operation of the issuance of a new license for the project application should be directed to
Markham Ferry Project No. 2183 until or other disposition under the FPA, Lenard G. Wright, Manager, Federal
such time as the Commission acts on its whichever comes first. If issuance of a Regulatory Affairs, Questar Pipeline
application for subsequent license. new license (or other disposition) does Company, 180 East 100 South, P.O. Box
not take place on or before June 1, 2006, 45360, Salt Lake City, Utah 84145–0360.
Magalie R. Salas, Mr. Wright also may be contacted at
notice is hereby given that, pursuant to
Secretary. 18 CFR 16.18(c), an annual license (801) 324–2459, (801) 324–5834 (fax).
[FR Doc. E5–3145 Filed 6–17–05; 8:45 am] under section 15(a)(1) of the FPA is There are two ways to become
BILLING CODE 6717–01–P renewed automatically without further involved in the Commission’s review of
order or notice by the Commission, this project. First, any person wishing to
unless the Commission orders obtain legal status by becoming a party
DEPARTMENT OF ENERGY otherwise. to the proceedings for this project
If the project is not subject to section should, on or before the comment date
Federal Energy Regulatory stated below, file with the Federal
15 of the FPA, notice is hereby given
Commission Energy Regulatory Commission, 888
that the City of Marshall, Michigan is
[Project No. 6514] authorized to continue operation of the First Street, NE., Washington, DC 20426,
City of Marshall Project No. 6514 until a motion to intervene in accordance
City of Marshall, Michigan; Notice of such time as the Commission acts on its with the requirements of the
Authorization for Continued Project application for subsequent license. Commission’s Rules of Practice and
Operation Procedure (18 CFR 385.214 or 385.211)
Magalie R. Salas, and the Regulations under the NGA (18
June 13, 2005. Secretary. CFR 157.10). A person obtaining party
On May 2, 2003, the City of Marshall, [FR Doc. E5–3142 Filed 6–17–05; 8:45 am] status will be placed on the service list
Michigan, licensee for the City of BILLING CODE 6717–01–P maintained by the Secretary of the
Marshall Project No. 6514, filed an Commission and will receive copies of
application for a new or subsequent all documents filed by the applicant and
license pursuant to the Federal Power DEPARTMENT OF ENERGY by all other parties. A party must submit
Act (FPA) and the Commission’s 14 copies of filings made with the
regulations. Project No. 6514 is located Federal Energy Regulatory Commission and must mail a copy to
on the Kalamazoo River in Calhoun Commission the applicant and to every other party in
County, Michigan. the proceeding. Only parties to the
[Docket No. CP05–366–000]
The license for Project No. 6514 was proceeding can ask for court review of
issued for a period ending May 31, Questar Pipeline Company and Commission orders in the proceeding.
2005. Section 15(a)(1) of the FPA, 16 Questar Gas Management Company; However, a person does not have to
U.S.C. 808(a)(1), requires the Notice of Application intervene in order to have comments
Commission, at the expiration of a considered. The second way to
license term, to issue from year to year June 13, 2005. participate is by filing with the
an annual license to the then licensee Take notice that Questar Pipeline Secretary of the Commission, as soon as
under the terms and conditions of the Company (Questar Pipeline), 180 East possible, an original and two copies of
prior license until a new license is 100 South, Salt Lake City, Utah 84111 comments in support of or in opposition
issued, or the project is otherwise and Questar Gas Management Company to this project. The Commission will
disposed of as provided in section 15 or (Questar Gas Management), 1050 17th consider these comments in
any other applicable section of the FPA. Street, Suite 500 Denver, Colorado determining the appropriate action to be
If the project’s prior license waived the 80265, jointly filed in Docket No. CP05– taken, but the filing of a comment alone
applicability of section 15 of the FPA, 366–000 on June 3, 2005, an application will not serve to make the filer a party
then, based on section 9(b) of the pursuant to section 7(b) of the Natural to the proceeding. The Commission’s
Administrative Procedure Act, 5 U.S.C. Gas Act (NGA), for authorization for rules require that persons filing
558(c), and as set forth at 18 CFR Questar Pipeline to abandon, by sale, comments in opposition to the project

VerDate jul<14>2003 17:24 Jun 17, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\20JNN1.SGM 20JNN1

S-ar putea să vă placă și