Documente Academic
Documente Profesional
Documente Cultură
After taking the groups through the content of either the TOCAT or the interview
guide, the team also wanted to find out the groups challenges outside the content
asked them. The common issue that came out from almost all the groups was that,
they needed financial support in their area of operation, citing a case was the fact
that the farmers said their yield was in the decline because of their inability to meet
the high cost of farm inputs to boost their yield.
On the part of the self-administered questionnaire for the district assembly and the
other decentralized departments, much difficulty was not encountered since each
department could understand the needs of the questionnaire and provide them as
such. This was also as a result of the fact that the group had met each of these
departments during the groups identification and selection process and assured
them that the programme was to partner with them but not to compute with them.
From the above challenges due to managerial lapses, the team therefore advises
management to find an alternative means of conveying offices to the field for
monitoring instead of relying on the district team vehicle without extra fuel.
CONCLUSION
Despite the challenges mentioned above and others which have not been
mentioned in this report, the group was able to carry out the exercise successfully
and it is therefore the hope of the team that the suggestions provided above will be
considered for further successful carrying out of such exercises so as for the
programme to succeed.
Thank you.